SSSC/SITR: FORCAST September 29, 2009 Cornell University Adams/Herter
2
29-Sept-092 FORCAST Description Facility Instrument Dual-Channel 256x256 Camera w/ Si BIB arrays o 5-25 m with Si:As array o 25-38 m with Si:Sb array 0.75 arcsec/pixel giving a 3.2 3.2 arcmin FOV Selectable Filters in 5-38 m range FORCAST Trimester Review
3
Fold mirrors Collimator mirror SOFIA Focal plane Cryostat window FPA Camera 1 Camera 2 25 mm FORCAST Optical Raytrace f/20 f/5.5 Lyot stop (pupil) 29-Sept-093FORCAST Trimester Review
4
29-Sept-094 FORCAST/SOFIA Early Science Goals Perform demonstrative science observations Emphasize unique capabilities of SOFIA/FORCAST o Observations at 30 – 40 µm o High spatial resolution in the mid-IR (2″ - 4″) Build collaborations between the science instrument team and external investigators Bridge SOFIA observations with Spitzer observations o Follow-up of regions that are too bright for Spitzer o Follow-up of Spitzer objects with higher spatial resolution Selected Early Short Science Objects o Winter/Spring:Orion o Summer:Galactic Center, M17 FORCAST Trimester Review
5
Early Science Filter Configuration 29-Sept-095 PositionFilter Wheel SWCLWC FW 2FW 1 FW 2 1 (Home) OPEN 24.4 m (R=7.5)38.0 m (R=8.8) OPEN 2 5.3 m (R=33)19.5 m (R=3.8) OPEN 30.6 m (R=5.7) 3 6.3 m (R=48) OPEN 33.4 m (R=18) Grism 5 (R=140) 4 6.6 m (R=34)8.6 m (R=42) ND 34.8 m (R=8.3) 5 7.6 m (R=15)11.0 m (R=12) Door Occulting Mask 6 ND 11.28 m (R=56)11.8 m (R=16) Grism 6 (R=250) FORCAST Trimester Review
6
29-Sept-096 200820092010 Preship Review Ground integration Short science flights JFMAMJJASONDJFMAMJJASOND Early Science Timeline 10/16/08Preship Review 12/09Ship to DAOF; Post-ship checkout 1/10Ground installation 2/1/10Lineops #1 3/4/10First Light Flight 7/6/10Short Science Flights (also includes facility checkout) 12/7/10Start Basic Science Flights JFMAMJASONDJ Ship to DAOF Basic science flights First light flight FORCAST Trimester Review
7
29-Sept-097 Detailed Timeline & Personnel Loading DatesPersonnelTasks jsMCCS Checkout Mid-12/09Ship Mid-12/09Arrival of instrument Mid-12/09geg,ch,jda,tlhPost-ship operations, warm test, leak check 1/10geg, chCooldown 1/10geg,ch,jda,tlh,jmdbBaseline testing & margin 1/10geg,ch,jda,tlh,js,jmdbInstall on plane 2/1/10geg,ch,jda,tlh,js,ldk,jmdbHangar/Line ops (9 nights; 5 contingency) 3/4/10tlh,jsFirst light flight 7/6/10geg,ch,jda,tlh,js,ldk,gjs,tn, jmdb (not all fly at once) Short science flights FORCAST Trimester Review
8
Line Ops Plan 29-Sept-09FORCAST Trimester Review8 Test NameDescriptionMode FOR-LO-1Alignment of FORCAST to TASTARE FOR-LO-2SMA Focus SequenceSTARE FOR-LO-2aOcculting Masks TestSTARE FOR-LO-3Ground Boresight DeterminationSTARE FOR-LO-4TA EmissivitySTARE FOR-LO-5Chop and Nod Settle Times; Image QualityC2N FOR-LO-6Optimum Chop FrequencyC2N FOR-LO-7Plate ScaleC2N FOR-LO-8Asymmetric ChopC2N FOR-LO-9Pointing StabilitySTARE FOR-LO-10Header Population for Acquired DataSTARE, C2N, C2ND FOR-LO-11Data Reduction Pipeline VerificationC2N, C2ND FOR-LO-12EMI/EMC Ground TestingSTARE, C2N, C2ND FOR-LO-13Flight Scenario for Determining Frame RatesSTARE FOR-LO-14Flight Scenario for Focus DeterminationSTARE FOR-LO-15Flight Scenario for Standard Star ObservationsC2N, C2ND FOR-LO-16Flight Scenario for Science ObjectC2N, C2ND FOR-LO-17Flight Scenario for Science ObjectSTARE (Scan) FOR-LO-18Flight Scenario for Science ObjectSTARE (step)
9
Status Chart CategoryTech.CostScheduleComment a. CryostatNo problems b. OpticsNew Lakeshore Mesh Filters are installed and tested Dichroic is still intact and performing adequately Calibration Box is ready for end-to-end testing c. DetectorBackup 256x256 Si:Sb ready for flight New Si:Sb larger format array in Fab (DRS Tech) d. ElectronicsBoth channels are operating synchronously e. SoftwareIMC is implemented; ready for testing CD36 f. Opto-mechanical systemPupils are aligned to simulated secondary Arrays are co-aligned to center of field FPA masks are installed g. AirworthinessAll documents are submitted h. DCS j. DocumentationSome done, more to do k. Commissioning PlanPre-ship version to be released after cooldown 36
10
FORCAST Calibration Box Design Layout in front of FORCAST Illumination at the detector KRS-5 Lens images a black hot source onto the FORCAST Lyot stop Chopper blade provides a background source 10/16/200810FORCAST Preship Review
11
Calibration Box
12
Lakeshore Mesh Filter Image Quality 29-Sept-0912 Results are consistent with diffraction-limited performance 33.4 µm Grid of 200 µm diam. Pinholes @ field stop (77 K) 38.0 µm24.4 µm FORCAST Trimester Review
13
Dichroic Performance 29-Sept-09FORCAST Trimester Review13 Barr 2 has better reflective performance B Files 2568-2801 R files 2411-2566 Barr3Barr2Mirror/openR/T_Barr3R/T_Barr2 SWC11.03221368946110.700.80 SWC11.32767333643460.640.77 SWC19.53780419548680.780.86 SWC24.41348162718110.740.90 LWC30.6+ND21390140533700.410.42 LWC33.41865186643510.43 LWC34.82499247551260.490.48 LWC38.02064202249580.420.41
14
Array Optimization Sb-083, 30.6 µm + ND2, Low Cap Detectors are optimized for best S/N vs.: Detector bias Well size Frame time Determine trade-off between signal vs. dark current, hot pixels 29-Sept-0914FORCAST Trimester Review
15
29-Sept-0915 Budget Status FY10 budget o Carry over of travel funds from previous year o Delays will require an additional ~ $100k of support above current allocation No future funding for larger format Si:As detector FORCAST Trimester Review
16
29-Sept-0916 Are We Ready? Yes we are!! FORCAST is working o Mechanisms and software appear very robust Technical things to do yet (no show stoppers) o End-to-end testing of Calibration Box o Testing of IMC (shift-and-add) o Implement acquisition scripts for lineops flight scenarios o Implement digital detector bias control Schedule risks o None Early science planning underway for range of possible flight dates, e.g. Orion or Galactic Center emphasis o GC plan requires tweaking per new (June 2010) schedule for ESS o Line Ops will test different observing strategies (C2N, Scanning, etc.) FORCAST Trimester Review