Presentation is loading. Please wait.

Presentation is loading. Please wait.

Modeling with Linear Programming and Graphical Solution

Similar presentations


Presentation on theme: "Modeling with Linear Programming and Graphical Solution"— Presentation transcript:

1 Modeling with Linear Programming and Graphical Solution

2 Steps in formulating Linear Programming (LP) Models
Understand the problem. Identify the decision variables State the objective function as a linear combination of the decision variables. State the constraints as linear combinations of the decision variables. Identify any upper or lower bounds on the decision variables.

3 LP Model Formulation: A Maximization Example 1 – Product mix problem - Beaver Creek Pottery Company (1 of 4) Beaver Creek Pottery Company employs skilled artisans to produce clay bowls and mugs. The two resources used by the company are special pottery clay and skilled labor. Given these limited resources, the company desires to know how many bowls and mugs to produce each day in order to maximize profit. This is generally referred to as a product mix problem.

4 Resource Requirements
LP Model Formulation A Maximization Example 1 (2 of 4) Resource Requirements Product Labor (Hr./Unit) Clay (Lb./Unit) Profit ($/Unit) Bowl 1 4 40 Mug 2 3 50 Product mix problem - Beaver Creek Pottery Company How many bowls and mugs should be produced to maximize profits given labor and materials constraints? Resource Availability: hrs of labor per day (labor constraint) 120 lbs of clay (material constraint)

5 A Maximization Example 1 (3 of 4)
LP Model Formulation A Maximization Example 1 (3 of 4) Resource hrs of labor per day Availability: 120 lbs of clay Decision x1 = number of bowls to produce per day Variables: x2 = number of mugs to produce per day Objective Maximize Z = $40x1 + $50x2 Function: Where Z = profit per day Resource 1x1 + 2x2  40 hours of labor Constraints: 4x1 + 3x2  120 pounds of clay Non-Negativity x1  0; x2  0 Constraints:

6 A Maximization Example 1 (4 of 4)
LP Model Formulation A Maximization Example 1 (4 of 4) Complete Linear Programming Model: Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0

7 Feasible Solutions A feasible solution does not violate any of the constraints: Example: x1 = 5 bowls x2 = 10 mugs Z = $40x1 + $50x2 = $700 Labor constraint check: 1(5) + 2(10) = 25 ≤ 40 hours Clay constraint check: 4(5) + 3(10) = 70 ≤ 120 pounds

8 Infeasible Solutions An infeasible solution violates at least one of the constraints: Example: x1 = 10 bowls x2 = 20 mugs Z = $40x1 + $50x2 = $1400 Labor constraint check: 1(10) + 2(20) = 50 > 40 hours

9 Example 2 of LP Problem - Blue Ridge Hot Tubs
Blue Ridge Hot Tubs produces two types of hot tubs: Aqua-Spas & Hydro-Luxes. Aqua-Spa Hydro-Lux Pumps 1 1 Labor 9 hours 6 hours Tubing 12 feet 16 feet Unit Profit $350 $300 There are 200 pumps, 1566 hours of labor, and 2880 feet of tubing available.

10 Formulating LP Model: Blue Ridge Hot Tubs
1. Understand the problem 2. Identify the decision variables X1=number of Aqua-Spas to produce X2=number of Hydro-Luxes to produce 3. State the objective function as a linear combination of the decision variables. MAX: 350X X2 4. State the constraints as linear combinations of the decision variables 1X1 + 1X2 <= 200 } pumps 9X1 + 6X2 <= 1566 } labor 12X1 + 16X2 <= 2880 } tubing 5. Identify any upper or lower bounds on the decision variables. X1 >= 0 , X2 >= 0

11 Summary of the LP Model for Blue Ridge Hot Tubs
MAX Z = 350X X2 S.T. 1X X <= 200 9X X2 <= 1566 12X1 + 16X2 <= 2880 X1 >= 0 X2 >= 0

12 Example 3:Wershon Suit Company
Jackets Slacks Available Profit, $/unit Material, Square yards Person Hours How many jackets and slacks should be produced ? 25

13 Example 3:Wershon Suit Company
Type of Objective Function Maximize Profit Variable Definition J = number of jackets produced / week S = number of slacks produced / week 25

14 Example 3:Wershon Suit Company
Max Z = $34 J + $40 S Such that 2 J + 5 S  50 (Material) 4 J + 2 S  36 (sewing) J , S  (Nonnegativity) 25

15 Example 4: Product Mix Problem
TJ’s, Inc., makes 2 nut mixes for sale to grocery chains in the states. The 2 mixes, referred to as the Regular Mix and the Deluxe Mix, are made by mixing different percentages of 3 types of nuts. In preparation for the fall season, TJ’s has just purchased 6000 pounds of almonds, 6000 pounds of pecans, and 7500 pounds of walnuts. The Regular Mix consists of 30% almonds, 20% pecans, and 50% walnuts. The Deluxe Mix consists of 35% of almonds, 30% pecans, and 35% walnuts. TJ’s accountant has analyzed the cost of packaging materials, sales price per pound, and other factors and has determined that the profit contribution per pound is $1.65 for the Regular Mix and $2.00 for the Deluxe Mix. TJ’s is committed to using the available nuts to maximize total profit contribution over the fall season. 20

16 Example 4: Product Mix Problem
Let R = amount of regular mix (pounds) D = amount of deluxe mix (pounds) Max z = 1.65R D (Total profit) s.t. 0.3R D  6000 (Availability with 0.2R + 0.3D  ingredient 0.5R D  specifications) R, D  (Nonnegativity) 21

17 Example 5: Transportation Problem
A product is to be shipped in the amounts al, a2, ..., am from m shipping origins and received in amounts bl, b2, ..., bn at each of n shipping destinations. The cost of shipping a unit from the ith origin to the jth destination is known for all combinations of origins and destinations. The problem is to determine the amount to be shipped from each origin to each destination such that the total cost of transportation is a minimum.

18 Transportation Problem – Example 5
The Zephyr Television Company ships televisions from three warehouses to three retail stores on a monthly basis. Each warehouse has a fixed supply per month, and each store has a fixed demand per month. The manufacturer wants to know the number of television sets to ship from each warehouse to each store in order to minimize the total cost of transportation.

19 Demand & Supply Each warehouse has the following supply of televisions available for shipment each month: Warehouse Supply (sets) 1. Cincinnati 2. Atlanta 3. Pittsburgh 700 Each retail store has the following monthly demand for television sets: Store Demand (sets) A. New York B. Dallas C. Detroit 600

20 Cost Matrix Costs of transporting television sets from the warehouses to the retail stores vary as a result of differences in modes of transportation and distances. The shipping cost per television set for each route is as follows: To Store From Warehouse A B C 1 $16 $18 $11

21 Model Development The model for this problem consists of nine decision variables, representing the number of television sets transported from each of the three warehouses to each of the three stores: xij = number of television sets shipped from warehouse i to store j where i = 1, 2, 3, and j = A, B, C The objective function of the television manufacturer is to minimize the total transportation costs for all shipments. Thus, the objective function is the sum of the individual shipping costs from each warehouse to each store: minimize Z = $16x1A + 18x1B + 11x1C + 14x2A + 12x2B + 13x2C + 13x3A + 15x3B + 17x3C In a "balanced" transportation model, supply equals demand such that all constraints are equalities; in an "unbalanced" transportation model, supply does not equal demand, and one set of constraints is ≤.

22 Constraints Supply Constraints x1A + x1B + x1C ≤ 300
Demand Constraints x1A + x2A + x3A = 150 x1B + x2B + x3B = 250 x1C + x2C + x3C = 200

23 Model Summary minimize Z = $16x1A + 18x1B + 11x1C + 14x2A + 12x2B + 13x2C + 13x3A + 15x3B + 17x3C subject to The transportation model can also be optimally solved by Linear Programming

24 Example 6: Scheduling Problem
The personnel manager must schedule a security force in order to satisfy staffing requirements shown below. Each worker has an eight hour shift and there are six such shifts each day. The starting and ending time for each of the 6 shifts is also given below. The personnel manager wants to determine how many people need to work each shift in order to minimize the total number of officers employed while satisfying the staffing requirements. Time # Officers Required Shift Shift Time 12am-4am 5 1 12am-8am 7 15 12 9 4am-8am 8am-noon noon-4pm 4pm-8pm 8pm-12am 4am-noon 8am-4pm noon-8pm 4pm-12am 8pm-4am 2 3 4 6 26

25 Example 6: Scheduling Problem
Let xi = number of officers who work on shift i, i = 1, ..., 6 Min z = x1 + x2 + x3 + x4 + x5 + x6 (Total number of officers employed) s.t. x6 + x1  5 (12am-4am) x1 + x2  7 (4am-8am) x2 + x3  15 (8am-noon) x3 + x4  7 (noon-4pm) x4 + x5  12 (4pm-8pm) x5 + x6  9 (8pm-12am) xi  0, i = 1, ..., 6 (Nonnegativity) 27

26 Example 7: An Investment Example
Kathleen Allen, an individual investor, has $70,000 to divide among several investments. The alternative investments are municipal bonds with an 8.5% annual return, certificates of deposit with a 5% return, treasury bills with a 6.5% return, and a growth stock fund with a 13% annual return. The investments are all evaluated after 1 year. Kathleen wants to know how much to invest in each alternative in order to maximize the return. The following guidelines have been established for diversifying the investments and lessening the risk perceived by the investor: 1. No more than 20% of the total investment should be in municipal bonds. 2. The amount invested in certificates of deposit should not exceed the amount invested in the other three alternatives. 3. At least 30% of the investment should be in treasury bills and certificates of deposit. 4. To be safe, more should be invested in CDs and treasury bills than in municipal bonds and the growth stock fund, by a ratio of at least 1.2 to 1. Kathleen wants to invest the entire $70,000.

27 An Investment Example - Model
Decision Variables: x1 = amount ($) invested in municipal bonds x2 = amount ($) invested in certificates of deposit x3 = amount ($) invested in treasury bills x4 = amount ($) invested in growth stock fund The Objective Function: Maximize Z = $0.085x x x x4 Constraints: x1 ≤$14,000 Model Summary x2 ≤x1 + x3 + x4 x2 + x3 ≥$21,000 [(x2 + x3)/(x1 + x4)] ≥1.2 x1 + x2 + x3 + x4 = $70,000

28 Linear Programming (LP)
General Description Problem: to determine decision variables Objective: to maximize or minimize an objective function Restrictions: represented by constraints Solution methods: graphical, simplex, computer 14

29 General Form of a Linear Programming (LP) Problem
MAX (or MIN): c1X1 + c2X2 + … + cnXn Subject to a11X1 + a12X2 + … + a1nXn  b1 : ak1X1 + ak2X2 + … + aknXn ≥ bk am1X1 + am2X2 + … + amnXn = bm X1 , X2 …… Xn ≥ 0 Note: If all the functions in the model are linear, the problem is a Linear Programming (LP) problem

30 Graphical Solution of LP Models
Graphical solution is limited to linear programming models containing only two decision variables. Graphical methods provide visualization of how a solution for a linear programming problem is obtained.

31 Example 1 – Product mix problem - Beaver Creek Pottery Company
Complete Linear Programming Model: Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0

32 Graphical Solution of Maximization Model (1 of 11)
Coordinate Axes Graphical Solution of Maximization Model (1 of 11) X2 is mugs Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0 X1 is bowls Figure: Coordinates for graphical analysis

33 Graphical Solution of Maximization Model (2 of 11)
Labor Constraint Graphical Solution of Maximization Model (2 of 11) Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0 Figure: Graph of labor constraint

34 Graphical Solution of Maximization Model (3 of 11)
Labor Constraint Area Graphical Solution of Maximization Model (3 of 11) Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0 Figure: Labor constraint area

35 Graphical Solution of Maximization Model (4 of 11)
Clay Constraint Area Graphical Solution of Maximization Model (4 of 11) Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0 Figure: The constraint area for clay

36 Graphical Solution of Maximization Model (5 of 11)
Both Constraints Graphical Solution of Maximization Model (5 of 11) Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0 Figure: Graph of both model constraints

37 Feasible Solution Area
Graphical Solution of Maximization Model (6 of 11) Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0 Figure: The feasible solution area

38 Objective Function Solution = $800
Graphical Solution of Maximization Model (7 of 11) Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0 Figure: Objective function line for Z = $800

39 Alternative Objective Function Solution Lines
Graphical Solution of Maximization Model (8 of 11) Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0 Figure: Alternative objective function lines for profits Z of $800, $1,200, and $1,600

40 Graphical Solution of Maximization Model (9 of 11)
Optimal Solution Graphical Solution of Maximization Model (9 of 11) Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0 Figure: Identification of optimal solution point

41 Optimal Solution Coordinates
Graphical Solution of Maximization Model (10 of 11) Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0 Figure: Optimal solution coordinates

42 Extreme (Corner) Point Solutions
Graphical Solution of Maximization Model (11 of 11) Maximize Z = $40x1 + $50x2 subject to: 1x1 + 2x2  40 4x2 + 3x2  120 x1, x2  0 The optimal solution of a maximization problem is at the extreme point farthest to the origin. Figure: Solutions at all corner points

43 Slack Variables Standard form requires that all constraints be in the form of equations (equalities). A slack variable is added to a  constraint to convert it to an equation (=). A slack variable typically represents an unused resource. A slack variable contributes nothing to the objective function value.

44 Linear Programming Model: Standard Form
Max Z = 40x1 + 50x2 + 0s1 + 0s2 subject to:1x1 + 2x2 + s1 = 40 4x2 + 3x2 + s2 = 120 x1, x2, s1, s2  0 Where: x1 = number of bowls x2 = number of mugs s1, s2 are slack variables Figure: Solutions at points A, B, and C with slack

45 LP Model Formulation – Minimization (1 of 6)
Two brands of fertilizer available - Super-gro, Crop-quick. Field requires at least 16 pounds of nitrogen and 24 pounds of phosphate. Super-gro costs $6 per bag, Crop-quick $3 per bag. Problem: How much of each brand to purchase to minimize total cost of fertilizer given following data ?

46 LP Model Formulation – Minimization (2 of 6)
Decision Variables: x1 = bags of Super-gro x2 = bags of Crop-quick The Objective Function: Minimize Z = $6x1 + 3x2 Where: $6x1 = cost of bags of Super-Gro $3x2 = cost of bags of Crop-Quick Model Constraints: 2x1 + 4x2  16 lb (nitrogen constraint) 4x1 + 3x2  24 lb (phosphate constraint) x1, x2  0 (non-negativity constraint)

47 Constraint Graph – Minimization (3 of 6)
Minimize Z = $6x1 + $3x2 subject to: 2x1 + 4x2  16 4x2 + 3x2  24 x1, x2  0 Figure: Constraint lines for fertilizer model

48 Feasible Region– Minimization (4 of 6)
Minimize Z = $6x1 + $3x2 subject to: 2x1 + 4x2  16 4x2 + 3x2  24 x1, x2  0 Figure: Feasible solution area

49 Graphical Solutions – Minimization (5 of 6)
Minimize Z = $6x1 + $3x2 + 0s1 + 0s2 subject to: 2x1 + 4x2 – s1 = 16 4x2 + 3x2 – s2 = 24 x1, x2, s1, s2  0 The optimal solution of a minimization problem is at the extreme point closest to the origin. Figure: Graph of the fertilizer example

50 Surplus Variables – Minimization (6 of 6)
A surplus variable is subtracted from a  constraint to convert it to an equation (=). A surplus variable represents an excess above a constraint requirement level. A surplus variable contributes nothing to the calculated value of the objective function. Subtracting surplus variables in the farmer problem constraints: 2x1 + 4x2 - s1 = 16 (nitrogen) 4x1 + 3x2 - s2 = 24 (phosphate)

51 Irregular Types of Linear Programming Problems
For some linear programming models, the general rules do not apply. Special types of problems include those with: Multiple optimal solutions Infeasible solutions Unbounded solutions

52 Multiple Optimal Solutions Beaver Creek Pottery
The objective function is parallel to a constraint line. Maximize Z=$40x1 + 30x2 subject to: 1x1 + 2x2  40 4x1 + 3x2  120 x1, x2  0 Where: x1 = number of bowls x2 = number of mugs Figure: Example with multiple optimal solutions

53 An Infeasible Problem Every possible solution
violates at least one constraint: Maximize Z = 5x1 + 3x2 subject to: 4x1 + 2x2  8 x1  4 x2  6 x1, x2  0 Figure: Graph of an infeasible problem

54 An Unbounded Problem Value of the objective
function increases indefinitely: Maximize Z = 4x1 + 2x2 subject to: x1  4 x2  2 x1, x2  0 Figure: Graph of an unbounded problem

55 Characteristics of Linear Programming Problems
A decision amongst alternative courses of action is required. The decision is represented in the model by decision variables. The problem encompasses a goal, expressed as an objective function, that the decision maker wants to achieve. Restrictions (represented by constraints) exist that limit the extent of achievement of the objective. The objective and constraints must be definable by linear mathematical functional relationships.

56 Properties of Linear Programming Models
Proportionality - The rate of change (slope) of the objective function and constraint equations is constant. Additivity - Terms in the objective function and constraint equations must be additive. Divisibility - Decision variables can take on any fractional value and are therefore continuous as opposed to integer in nature. Certainty - Values of all the model parameters are assumed to be known with certainty (non-probabilistic).


Download ppt "Modeling with Linear Programming and Graphical Solution"

Similar presentations


Ads by Google