LIST OF STAFF S.N o. Name of Employee Designati on Work Load Name of Work Sanction Cost (in Lacs) Work Executed up to date Remainin g work 1.Sh. A.B. PandeyResident Engineer Const. of ROB at Tijara Phatak 1875.00115.441759.56 2.Sh. R.K. MaliAsstt. Resident Engineer Const. CFC Building Gola ka bas 88.6563.5325.12 3.Sh. N.K. Bhatnagar Accounta nt Total = 1963.65178.971784.68
4
A/R to Chanduki under PMGSY
5
ALWAR BHIWADI ROAD (BOT)
6
A/R TO AKBARPUR ( RMUP )
7
RAC BARRACK 100MEN (PHASE-I)
8
RAC BARRACK 100MEN (PHASE-I&II)
11
PRESENT SCENARIO
12
FUTURE SCENARIO
13
PROJECT AT A GLANCE Name of Work :- Construction of RoB at L.C. No. 111 ( Tizara Phatak) on Alwar – Bhiwadi Road ( T.P. No. 71/3-4 B.G.) Name of Client :- UIT, Alwar A & F Sanction :- Vide No. P.8(1) UDH/1/2006 Dated 17 th Sept. 2008 for Rs. 20.55 Crores. Technical Sanction :- Rs. 20.55 Crores on dated 06.01.2009 St date of start :- 01-09.2008 St. date of completion :- 08.01.2010 Expected dated of completion: 31.12.2011 Funds received from client upto 4 th Dec. 2009 :- Rs. 150.00 Lacs Expenditure as on 4 th Dec. 2009 :- Rs. 115.44Lacs. ( including liabilities)
14
Land marks :- GAD approved by Railway :- 01.05.08 Pile foundation work is in progress Funds Received from client :- (a) Rs. 25.00 Lacs on 29.05.07 for preparation of DPR (b) Rs. 75.00 Lacs on 02.07.09 (c) Rs. 50.00 Lacs on 20.11.09
15
Hindrances :- Encroachment removed by UIT on 19.06.09 but matter is pending in the Rajasthan High Court, Jaipur for Payment of Compensation for land & Buildings. Shifting of utilities such as:- (a) Water supply lines shifting are still in process (b) Electric poles are still in process (c) Removing of trees- Application for permission submitted by UIT, Alwar (d) The traffic is not diverted till date from LC No. 111 Agitation by local citizens for land and building compensation since 16.07.09 to 22.10.09.
16
CFC BUILDING AT GOLA KA BAS
17
CFC BUILDING AT GOLA KA BAS
18
PROJECT AT A GLANCE 1.Name of Work :- Construction of Common Facility Center for Murtikala Cluster Gola ka Bas, Tehsil-Rajgarh District- Alwar (Raj.) 2. Name of Client :- DIC, Alwar 3. A & F Sanction :- Rs. 88.65 Lacs 4. Technical Sanction (Revised) :- Rs. 88.65Lacs 5. St. date of start :- 02-11-07 6. St. date of completion :- 22-01-10 7. Funds received from client as on 31 th Oct. 2009 :- Rs. 88.65 Lacs 8. Expenditure as on 04 TH Dec. 2009 :- Rs. 63.53 Lacs. 9. Bottlenecks:-Revised funds received late as on 09-03-09. – Plate form Drawing received as on 09-06-09. – Encroachment on land for Culvert and approach road has not yet been cleared till today as on 04.12.09.
20
PROPOSED ROAD
21
WIDENING OF ALWAR –BHIWADI ROAD (SH-25)KM 146/0 TO 225/0 FROM 2 LANE TO 4LANE DEVIDED HIGHWAY LENGTH :79.00KM PROJECT COST: 222.26 Crores PERIOD OF CONSTRUCTION: 18 Months PERIOD OF CONCESSION : 19 YEARS Total Period: 20 Years 6 Mths Toll Booth:2 Nos. Booth 1. on KM 160 2. on KM 211