Download presentation
Presentation is loading. Please wait.
Published byBenjamin Johns Modified over 9 years ago
1
EATS 2009 Efficiency in Training Through Evolving Technology and Cost Effectiveness Captain Igor Petyashin - Air Astana Captain Mark Sawyer - Aerosim Technologies
2
Technology Continues to Evolve Low cost, highly capable Flight Training Devices Low cost, highly capable Flight Training Devices Complete Aircraft Simulation delivered efficiently Complete Aircraft Simulation delivered efficiently Portable Training enhances “Always Ready” concept Portable Training enhances “Always Ready” concept Training Curriculums Streamlined to fully Training Curriculums Streamlined to fully utilize this Technology utilize this Technology
3
Low cost, highly capable Flight Training Devices Practice to perfection prior to FFS All Standard/Non Normal Procedures Low Visibility Taxi Scenarios CAT II/III Approaches and Landings RNP Approaches Special Airport Training Mountainous Terrain Clearance Procedures (MTCP) HUD Training EGPWS TCAS Escape maneuvers Pilot Hiring Assessments (in lieu of FFS)
4
Complete Aircraft Simulation delivered efficiently Simulation Based Courseware allows: Fully Integrated Aircraft Systems Inclusion of current Nav Data Base Procedural Training Full preparation prior to schoolhouse
5
Portable Training enhances “Always Ready” concept Portable Training and Training Management Systems Flash Drives I Pod I Phone Learning Management System
6
Training Curriculums Streamlined by Utilization of these Technologies Traditional Curriculum versus New Technology Curriculum Traditional Ground Training 10-13 Days Flight Training 10 – 12 days Total Schoolhouse Footprint 20 – 25 days New Technology Distance Learning 8 Days Procedures Training 5 Days Flight Training 8 – 10 days Total Schoolhouse Footprint 13 - 15 days
7
Air Astana Challenges and Solutions Captain Igor Petyashin - Air Astana
8
Original Initial and Recurrent Training Footprint Initial Ground School and FTD 13 days Ground School and FTD 13 days FFS 9 days FFS 9 days Recurrent (LPC and OPC) 2 per year 1 Day Ground Training 1 Day Ground Training 3 Days FFS 3 Days FFS
9
Revised Initial and Recurrent Training Footprint Initial (future) Ground School and EVPT 13 days (on base) Ground School and EVPT 13 days (on base) FFS at ATO 9 days FFS at ATO 9 days Recurrent (LPC and OPC) 2 per year Ground School –distance learning Ground School –distance learning 2 days EVPT (on base) 2 days EVPT (on base) 2 days FFS 2 days FFS
10
Summary of Quality, Efficiency and Cost Effectiveness Achieved Ground School (home study) Ground School (home study) Standardized on flash drive, updated via internet Standardized on flash drive, updated via internet Pilot sets learning pace, permanent access on flash drive Pilot sets learning pace, permanent access on flash drive
11
Summary of Quality, Efficiency and Cost Effectiveness Achieved Enhanced Virtual Procedures Trainer Enhanced Virtual Procedures Trainer On base training On base training Aircraft Systems visualization Aircraft Systems visualization SOP/CRM practice and standardization SOP/CRM practice and standardization Versatility Versatility MTCP MTCP Airport Familiarization Airport Familiarization Pilot Assessments and Interviews Pilot Assessments and Interviews
12
Summary of Quality, Efficiency and Cost Effectiveness Achieved FFS FFS 1 day reduction 1 day reduction reduced workload reduced workload more FFS time for checking more FFS time for checking
13
Air Astana Training Challenges Multiple ATO’s Training away from Base and from Flight Training Managers Training away from Base and from Flight Training Managers observation observation Wet Leasing Wet Leasing Communication Communication Costs Costs Lack of Standardization Lack of Standardization Pilots Pilots Instructors Instructors Limited Time in FFS for Training Limited Time in FFS for Training Required extra FFS for Training and Checking Required extra FFS for Training and Checking
14
Air Astana Training Challenges Complex Operating Manuals for Cockpit Use OM-A OM-A OM-D OM-D
15
Air Astana Training Solutions Internal Financial Investment Local Instructor Training at Delta Air Lines Local Instructor Training at Delta Air Lines EVPT Development with Aerosim EVPT Development with Aerosim Pre-Training with Local Instructors Pre-Training with Local Instructors Increased Training in EVPT Increased Training in EVPT Airport Familiarization Airport Familiarization MTCP MTCP Assessments Assessments CRM CRM Fuel Conservation Fuel Conservation
16
Air Astana Training Solutions Internal Financial Investment Dry Leasing for LPC and OPC (Cost Savings) Dry Leasing for LPC and OPC (Cost Savings) Increased Checking Time at FFS Increased Checking Time at FFS
17
Air Astana Training Solutions Internal Financial Investment High Standardization High Standardization SOP Development with Delta Air Lines SOP Development with Delta Air Lines Line Check Program Line Check Program System Training Developed with Aerosim System Training Developed with Aerosim
18
Air Astana Training Solutions Complex Operating Manuals POM (cockpit operating manual for pilots POM (cockpit operating manual for pilots OEG (Training Guide for Instructors) OEG (Training Guide for Instructors)
19
EATS 2009 Thank You! Captain Igor Petyashin - Air Astana Captain Mark Sawyer - Aerosim Technologies
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.