Download presentation
Presentation is loading. Please wait.
Published byPatience Logan Modified over 9 years ago
1
Practice Class Exercise CHINA Enroute 1 BEIJING, CHINA; 30 JUN-11 JUL 2014
2
PBN Implementation Processes 2
3
3 Airspace Concept Activity Overview
4
Route Spacing ✈ Airway vs Air Route 4 10km
5
Route Spacing ✈ Air Route ✈ RNAV 2 - 9.3km offset ✈ (doc8168- 2 x XTT2.0 +buffer 1.00) ✈ RNAV 1 – 8.4km offset ✈ (9nm enroute euro RNAV1; US RNAV2) ✈ RNP 1 – 6.5km offset ✈ (7nm enroute euro) ✈ Air Route ✈ RNAV 2 - 9.3km offset ✈ (doc8168- 2 x XTT2.0 +buffer 1.00) ✈ RNAV 1 – 8.4km offset ✈ (9nm enroute euro RNAV1; US RNAV2) ✈ RNP 1 – 6.5km offset ✈ (7nm enroute euro) 5 9.3 or 8.4 or 6.5 9.3 or 8.4 or 6.5
6
Beijing Area 6
7
Guangzhou Area 7
8
Beijing/Hong Kong 8
11
Distance Differences
12
Good Design Practice 12 CORNER-POST Flows by quadrant, segregate Arrivals laterally and vertically from Departures
13
BR SP VT RJ BH
14
Good Design Practice 14 In TMA/APP Crossing routes i n ACC – Cross when level
15
BeijingBeijing ✈ Team Organizer ✈ Team Recorder ✈ Team Name ✈ Team Organizer ✈ Team Recorder ✈ Team Name 15
16
BeijingBeijing ✈ Safety ✈ Capacity ✈ Efficiency ✈ Environment ✈ Access ✈ Safety ✈ Capacity ✈ Efficiency ✈ Environment ✈ Access 16
17
BeijingBeijing ✈ NavSpec? ✈ Corner Posts? ✈ ACC Transition points? ✈ NavSpec? ✈ Corner Posts? ✈ ACC Transition points? 17
18
Beijing/Hong Kong/Shanghai 18
19
FiniFini 19
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.