Download presentation
Presentation is loading. Please wait.
Published byCornelius Carter Modified over 9 years ago
1
1 The Edward Alleyn Building - opening July 2008 will house ‘The Michael Croft Theatre’, etc
2
2 The Edward Alleyn Building – opening summer 2008
3
3 The Edward Alleyn Building - opening July 2008 view showing glazed links and glass atrium
4
4 Cloister and landscaped terraces (view from Sports Hall looking towards the Great Hall and Clock tower )
5
5 The Edward Alleyn Building - opening July 2008 view from quad showing cloister and atrium
6
6 The glazed link and glass atrium
7
7 The Edward Alleyn Building - opening July 2008 view from above showing landscaping
8
8 The Edward Alleyn Building view from the astro-turf pitch looking towards the pavilion
9
9 The Edward Alleyn Building - opening July 2008 view showing theatre on 3 levels
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.