Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 NPRR638 Back-casting Updated Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 01, 2015.

Similar presentations


Presentation on theme: "1 NPRR638 Back-casting Updated Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 01, 2015."— Presentation transcript:

1 1 NPRR638 Back-casting Updated Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 01, 2015

2 2 Updated Prototype - Fixes CWG/MCWG asked ERCOT to evaluate the NPRR638 back-casting model to better understand the resulting values and volatilities. ERCOT staff evaluated the model and determined that: Certain Operating Days prices had been dropped from the input data, thereby causing excess volatility. The model code included an incorrect statement type for DAM, which resulted in an incorrect calculation of DAM ancillary service and other non-energy amounts. Updated results are corrected for these errors. ERCOT Public

3 3 Updated Prototype - Scenarios The following scenarios were run: For RTLE, 1-, 3-, 5-, 7- and 10-day lookbacks Historical price horizons of one and three years Price confidence levels of P50, P60, P70, P80 and P84 Selection for traders-only, load-only, generation-only and both generation and load ERCOT Public

4 4 Updated Prototype - Observations Observations on updated results Modelled DALE value is similar to current DALE Modelled RTLE is highly sensitive to lookback days Modelled RTLE is more variable than current RTLE Higher lookback values result in RTLE amounts that are significantly higher than under the current methodology As expected, RTLE and DAM increase with confidence levels The RTLE volatility impacts are greatest for Counter-Parties with both load and generation This appears to result from greater volatility of Resource Node settlement point prices This causes generators to receive materially greater credits than load is charged ERCOT Public

5 5 Options for consideration Options to moderate volatility of RTLE Reduce overall confidence level to P50 Assign different confidence level to Resource Node settlement point prices Reduce lookback days ERCOT Public

6 6 Updated Prototype - Results ERCOT Public Price Analysis

7 7 Updated Prototype - Results ERCOT Public

8 8 Updated Prototype - Results ERCOT Public

9 9 Updated Prototype - Results ERCOT Public

10 10 Updated Prototype - Results ERCOT Public

11 11 Updated Prototype - Results ERCOT Public

12 12 Updated Prototype - Results ERCOT Public

13 13 Updated Prototype - Results ERCOT Public

14 14 Updated Prototype - Results ERCOT Public

15 15 Updated Prototype - Results ERCOT Public Volume Analysis

16 16 Updated Prototype - Results ERCOT Public No Load or Generation

17 17 Updated Prototype - Results ERCOT Public Generation Only

18 18 Updated Prototype - Results ERCOT Public Load Only

19 19 Updated Prototype - Results ERCOT Public Load + Generation

20 20 Updated Prototype - Results ERCOT Public No Load or Generation Generation Only Load Only Load + Generation

21 21 Updated Prototype - Results ERCOT Public Exposure Analysis 3 years price lookback

22 22 Updated Prototype - Results ERCOT Public

23 23 Updated Prototype - Results ERCOT Public

24 24 Updated Prototype - Results ERCOT Public

25 25 Updated Prototype - Results ERCOT Public

26 26 Updated Prototype - Results ERCOT Public No Load or Generation

27 27 Updated Prototype - Results ERCOT Public Generation Only

28 28 Updated Prototype - Results ERCOT Public Load Only

29 29 Updated Prototype - Results ERCOT Public Load + Generation

30 30 Updated Prototype - Results ERCOT Public No Load or Generation Generation Only Load Only Load + Generation

31 31 Updated Prototype - Results ERCOT Public Exposure Analysis 1 year price lookback

32 32 Updated Prototype - Results ERCOT Public

33 33 Updated Prototype - Results ERCOT Public

34 34 Updated Prototype - Results ERCOT Public

35 35 Updated Prototype - Results ERCOT Public

36 36 Updated Prototype - Results ERCOT Public No Load or Generation

37 37 Updated Prototype - Results ERCOT Public Generation Only

38 38 Updated Prototype - Results ERCOT Public Load Only

39 39 Updated Prototype - Results ERCOT Public Load + Generation

40 40 Updated Prototype - Results ERCOT Public No Load or Generation Generation Only Load Only Load + Generation

41 41 Questions ERCOT Public


Download ppt "1 NPRR638 Back-casting Updated Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 01, 2015."

Similar presentations


Ads by Google