Download presentation
Presentation is loading. Please wait.
Published byBarbara Ross Modified over 9 years ago
1
U.S. Department of the Interior U.S. Geological Survey Preliminary Results of Dye- Tracer Test at the B4 Area and Offsite Wells Dye Injection 11/13/07 Results up to 1/8/08 (8 weeks)
2
Preliminary Results 2000 Results Air Force Plant 6 Dobbins Air Force Reserve Base B-4 Area Southern Polytechnic State University Life University Rottenwood Creek Sites with TCE detections MW0s2
3
Preliminary Results Objective and Approach Better understand ground-water movement in deep bedrock from B4 to offsite area Selected two on-site wells (OB203 and RW203) that were located close enough to each other for an initial test. Also included off-site bedrock wells in the test that were located downgradient from the injection well.
4
Preliminary Results Tracer Test Location Map
5
Preliminary Results Sampling Frequency Weekly sampling at RW203 Monthly sampling at other sites
6
Preliminary Results Pre-Injection Background Sampling Fluorescein (Acid Yellow 73) Eosine (Acid Red 87) Rhodamine WT (Acid Red 388) Sulphorhodamine B (Acid Red 52) Tinopal CBS-X (Fabric brightening agent 351) Solophenol 500% (Direct Yellow 96) D&C Red #28 FD&C Red #3 D&C Green #8 Palanil Luminous Red G Lissamine FF
7
Preliminary Results Injection 11/13/07 @ 1300 Set 1-inch PVC to 90 ft 1 gal #3 Red (pre-mixed) Followed by 15 gal water (Flowmeter indicated no flow below 105 feet)
8
Preliminary Results Downgradient Monitoring Well RW203 Downward flow between 100 and 139’ Zero flow below 139’ Dye receptor placed at 105’
9
Preliminary Results Results: Injection 11/13/07 @ 1300 ob203aRW203 92’380’880’ SCT2 SCT1 A B C A B C SCT3 (420-560) (88-105) (521-543) (434-457) (85-125) (65-95) (139) (100) (119-198) Depths in parentheses (not to scale)
10
Preliminary Results Results – 3 Days ob203aRW203 92’380’880’ SCT2 SCT1 A B C A B C SCT3 Not sampled 30446 (420-560) (88-105) (521-543) (434-457) (85-125) (65-95) (119-198)
11
Preliminary Results Results – 2 Weeks ob203aRW203 92’380’880’ SCT2 SCT1 A B C A B C SCT3 ND ND (.030) ? 22973 (420-560) (88-105) (521-543) (434-457) (85-125) (65-95) (119-198)
12
Preliminary Results Results – 5 Weeks ob203aRW203 92’380’880’ SCT2 SCT1 A B C A B C SCT3 ND 0.365 21.4 ND (.050) ND 6650 (420-560) (88-105) (521-543) (434-457) (85-125) (65-95) (119-198)
13
Preliminary Results Results – 8 Weeks ob203aRW203 92’380’880’ SCT2 SCT1 A B C A B C SCT3 ND 15.6 300.2.916 ? (not sampled) ND 201 (420-560) (88-105) (521-543) (434-457) (85-125) (65-95) (119-198)
14
Preliminary Results Map 8-Weeks
15
Preliminary Results All Results Location Distance (ft)3-DAYS2-WK3-WK5-WK8-WK RW-203 (100, 139) 92304462297369906650201 SCT2-C (85-125)384 ND.365 (.292)15.673 (8.937) SCT2-A (521-543)384 (0.05)(0.916) SCT-2B (434-457)384 (ND) SCT-3 (65-95)400 ND (ND) MW0S-2R (133)528 ND (ND) MWOS-03 (11-21)531 ND (ND) Trib-1633 ND (ND) SCT1-C (88-105)879 0.03 21.455 (4.272)300.24 (12.712) SCT1-A (420-560)879 ND
16
Preliminary Results What would cause such a highly constrained flow path? Why is the flow rate so high?
17
Preliminary Results I IV III II I-B Dominate strike of foliation = green, joints = red
18
Preliminary Results Parting Plane
19
Preliminary Results Findings (so far) Fastest GW movement is through transition zone with flow rates on the order of 25 to 50 ft/day GW movement appears to be strongly constrained along discontinuities formed parallel to foliation/layering (i.e. parting planes and lithologic contacts) A downward hydraulic gradient in the area appears to influence deeper GW movement
20
Preliminary Results Tracer Test Continued… Stay tuned Sampling every 3 weeks Will continue to sample until dye passes through system or we are satisfied with results Other zones/wells may be tested
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.