1 Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting
CDF Operations Report Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting

2 Store Summary (8 - 15 Dec 2005) 4543 13 Dec 2.0 41.6 0.24 4549 14 Dec
Start Date Duration (hours) Initial Lum (μb-s)-1 Del. Int. Lum. (pb-1) Live Int. Lum. Int. Lum. w/Si Comments 4543 Quench 13 Dec Tue 2.0 41.6 0.24 % % XTRP Configuration problem 4549 14 Dec Thu-Sat 11.4 53.0 1.20 % Mostly problem free Silicon held out for stable conditions Total 13.4 1.44 % bbbhhtt! Startup has been pretty troublesome for Tevatron Lost all 4 stores to quenches (including 1 during final protons and 1 during scraping) As of 10:30 today (15 Dec) Tevatron is off for 24 hours while conditioning B11H separator which is sparking 15 Dec 2005 Bob Wagner, CDF Weekly Meeting

3 Run II Integrated Luminosity
Delivered: ~1443 pb-1 Recorded: ~1156 pb-1 Silicon Good: ~916 pb-1 15 Dec 2005 Bob Wagner, CDF Weekly Meeting

4 CDF Detector Operations
COT Completed installation of last crate of upgrade TDCs on Wednesday 14 Dec evening. SL6 has been tripping. Replaced load resistor. Have connected diagnostics for further study. XFT SLAM boards fully integrated into DAQ Thursday 8 Dec. Working on SLAM board timing adjustments to minimize bit transfer errors Plug Completed Plug Sourcing Friday 9 Dec. Silicon Keeping silicon out of DAQ configuration until there’s a normal termination store Took cosmics with silicon on Saturday 10 Dec. Central Calorimeter Some post-shutdown problems with CCAL13 but seems to be improving as usual after few days of “normal” operations. Reseated TRACER cable for CCAL05 after post-shutdown trouble Fixed bad CEM Pisa box channel 15 Dec 2005 Bob Wagner, CDF Weekly Meeting

5 Bob Wagner, CDF Weekly Meeting
Access Reports Concluded Supervised Access period last Thursday 8 Dec 2005 Four Controlled Accesses past week: Sunday Day 11 Dec – 2.3 hours Dangling XFT trigger cable reinserted Monday Day 12 Dec – 0.5 hours Empty Recovery Receptacle for Gravity Induced Ground Water Precipitation Monday Day 12 Dec – 1.5 hours Silicon ladder diagnostics – found bad power supply; also usual behavior for one AVDD Wednesday Evening 14 Dec – 3.0 hours Completed installation of last crate of COT TDC upgrade boards Pending Access Tasks: Nothing currently 15 Dec 2005 Bob Wagner, CDF Weekly Meeting