STF421 ITS G5 TESTING – AN OVERVIEW – CEN DSRC – ITS G5 Coexistence Workshop - Presented by Friedbert Berens, in Ispra, Italy STF421 – An Overview -

Similar presentations


Presentation on theme: "STF421 ITS G5 TESTING – AN OVERVIEW – CEN DSRC – ITS G5 Coexistence Workshop - Presented by Friedbert Berens, in Ispra, Italy STF421 – An Overview -"— Presentation transcript:

1 STF421 ITS G5 TESTING – AN OVERVIEW – CEN DSRC – ITS G5 Coexistence Workshop - Presented by Friedbert Berens, in Ispra, Italy STF421 – An Overview -

2 Overview Scope Members of STF421 Deliverables Status and planning STF421 overview 2

3 Scope of STF421 The STF421 develops a set of specifications for the certification test of the CEN DSRC - ITS G5 coexistence mechanisms and the ITS – G5 Dynamic Congestion Control (DCC) mechanisms. STF421 overview 3

4 Resources of STF421 220 Person Days from 01.06.2011 to 30.6.2012 STF 421 Member: Paul Alexander (not on photo) Friedbert Berens (STF Leader) Madalina Tepelmann Peter Schmitting Dieter Smely With support from the ETSI CTI (Sebastian Müller) Photo with Christoph Wöste (TC ITS WG4 Chairman) STF421 overview 4

5 Schedule and planning of STF421 Initial interims report to EC: 30. September Ready for ETSI 1. September Stable draft of coexistence deliverables until Q4/2011 Early draft of DCC deliverables until Q4/2011 Final draft of deliverables for TC approval end Q1/2012 Final report EC: 30. June 2012 Ready for ETSI approval in 1. June 2012 STF421 overview 5

6 Milestones of STF421 2011 Milestone A: ITSWG4#15 (21 June), ETSI Progress Report #1 and first draft of DTS/ITS-0040022 (PICS), DTS/ITS- 0040023 (TSS&TPs), DTS/ITS-0040024 (ATS). Milestone B: 1 st September 2011 Interim Report to be approved by EC/EFTA. The Interim Report must be delivered by the STF Leader to the ETSI Secretariat before 1st September 2011. The deadline for delivery to EC/EFTA by the ETSI Secretariat is 30 September; EC/EFTA approval is expected mid- November Milestone C: ITS#9, ETSI (October 2011) Progress Report #2 and stable drafts of DTS/ITS-0040022, 023, 025 First drafts of DTS/ITS-0040025 (PICS), DTS/ITS-0040026 (TSS&TPs), DTS/ITS-0040027 (ATS) STF421 overview 6

7 Status of STF421 Preparatory meeting: 17. February 2011 in Sophia Antipolis First Technical Meeting 31.5. and 1.6.2011 Milestone A achieved 21.06.2011 Activities is dependent on initial work in STF420 and ITSWG4 Coexistence AdHoc group STF421 overview 7

8 Deliverables 1. Coexistence of cooperative ITS G5 with RTTT DSRC DTS/ITS-0040022 (PICS) DTS/ITS-0040023 (TSS&TPs) DTS/ITS-0040024 (ATS) 2. Channel congestion control algorithms operating in the 5.9GHz range DTS/ITS-0040025 (PICS) DTS/ITS-0040026 (TSS&TPs) DTS/ITS-0040027 (ATS) STF421 overview 8

9 Document schedule 1. Phase DTS/ITS-0040022 (PICS): DSRC/G5 Radio Test TS 102 916 – 1 First version early draft: 21.June Stable draft: October 2011 DTS/ITS-0040023 (TSS & TPs) : DSRC/G5 Radio Test TS 102 916 – 2 First version early draft: 21. June Stable draft: October 2011 DTS/ITS-0040024 (ATS) : DSRC/G5 Radio Test TS 102 916 -3 First version early draft: 21. June Stable draft: October 2011 9 STF421 overview

10 Document schedule 1. Phase DTS/ITS-0040025 (PICS): G5 Radio Test TS 102 917 – 1 First version early draft: October 2011 Stable draft: Q1/2012 DTS/ITS-0040026 (TSS & TPs): G5 Radio Test TS 102 917 – 2 First version early draft: October 2011 Stable draft: Q1/2012 DTS/ITS-0040027 (ATS): G5 Radio Test TS 102 917 -3 First version early draft: October 2011 Stable draft: Q1/2012 10 STF421 overview

11 11 End Comments and Inputs Thank you for your attention For more Information friedbert.berens@me.com STF421: overview