Presentation is loading. Please wait.

Presentation is loading. Please wait.

Feedback on phase adjustment with BPTX Using scope and LHCb BPIM boards to readout BPTX signal BPIM only used for triggering, phase measurements (BPTX1-BC1,

Similar presentations


Presentation on theme: "Feedback on phase adjustment with BPTX Using scope and LHCb BPIM boards to readout BPTX signal BPIM only used for triggering, phase measurements (BPTX1-BC1,"— Presentation transcript:

1 Feedback on phase adjustment with BPTX Using scope and LHCb BPIM boards to readout BPTX signal BPIM only used for triggering, phase measurements (BPTX1-BC1, BPTX2-BC1, …) done with scope No data recording implemented, only scope screenshots

2 First cogging with two beams Beam-1 bucket 1 Beam-2 bucket 8911 Without cable+TOF estimated delay correction 126.678 ns -> Measured Vertex Z = -1.3 cm 23 Nov 2009

3 Vertex Z vs  T BPTX cable length know with accuracy ~ ± 200 ps Measured vertex Z used to x-check/calibrate  T offset, corrected value: 126.820 ns BPTX-1 – IP2 = 146085.5 mm BPTX-2 – IP2 = 145361.5 mm (  TOF = 2.922 ns) BPTX-1 cable delay = 800.4 ns BPTX-2 cable delay = 670.8 ns Estimated offset DT(B1-B2)= 126.678 ns BPTX-1 – IP2 = 146085.5 mm BPTX-2 – IP2 = 145361.5 mm (  TOF = 2.922 ns) BPTX-1 cable delay = 800.4 ns BPTX-2 cable delay = 670.8 ns Estimated offset DT(B1-B2)= 126.678 ns CMS ATLAS Final resolution: ~ 50 ps (tbc!)

4 Vertex Z variations RF problems Phase adjust To be checked Large changes related to RF phase adjust, some ~ 50-100 ps variations to be understood

5 More feedback  T with multibunching: nothing special implemented in 2009 Tolerable beam spot shift: < 1cm within same fill (run), also depending on beam longitudinal size (to be confirmed…). Larger shifts clearly an issue if during same fill/run External clock handshake? Resynchro only during setup, change needs agreement on new procedure

6 2010 issues No synchronized BCref for 2010: in principle not an issue Will we use the BPTX to check the alignment? Should/could the data be published? Which format? LHCb BPIM (with new FW) will measure bunch by bunch phase and intensity +  T of bunch pairs, check filling scheme (ghost bunches, abort gap), data published over DIP (agreed format)

7 2010 issues If the phase is 'wrong', what should be the procedure? (experts won't be there night and day on a long term basis) Procedure to be agreed with experiments If rephasing is done, could it be during 'stable beam'? If yes, will the feedback be given by vertex reconstruction? How fast is it? Not during ‘stable beam’ unless new procedure is established. Info on vertex available ‘online’.


Download ppt "Feedback on phase adjustment with BPTX Using scope and LHCb BPIM boards to readout BPTX signal BPIM only used for triggering, phase measurements (BPTX1-BC1,"

Similar presentations


Ads by Google