Download presentation
Presentation is loading. Please wait.
Published byMorris Barker Modified over 9 years ago
1
Windward Community College
3
Rocket: Leo Hano Payload: Hula-hoop
4
GPSFlight in nose cone Variable Drag Configuration (VDR) Four fin design Avionics Featherweight Raven-2 PerfectFlight MAWD Dual Deployment
5
Motor: L1300R Thrust/Weight: 6.49 Total Impulse: 4567.0 N Casing: RMS 98/5120 Average Thrust: 1300.0 N Peak Thrust: 1,552.5 N Burn Time: 3.5
6
1.Boost Phase 2.Coast Phase 3.Apogee Drogue Deployed 4.Rapid Decent Phase 82 ft/sec 5.Main Decent Phase 22 ft/sec Flight Profile
7
Main Chute 144in (12 feet) Decent Rate: 22 feet per second Drogue Chute 42in (3 and 1 half feet) Decent Rate: 82 feet per second
16
Model Rocket Launches: On going Third Saturday of every month Duel Deployment Avionics Test: February 26, 2011 Full Scale Low Power Launch (FSLP): March 13, 2011 FSLP Rain Date: March 20, 2011 K560 Altitude:1,930 feet Max Speed: 299 feet/sec Max Acceleration: 407 feet/sec/sec Estimated Flight Duration: 3 minutes
17
BS2pe Micro Controller 12-bit ADC Temperature sensor
18
BS2pe A/D Temp Sensor Hula-hoop 1 Block Diagram
19
BS2p Micro Controller EEPROM 24-bit ADC Temperature sensor coil 12-bit ADC Temperature sensor 3-axis accelerometer (for comparison) Consists of one coil
20
Accelerometer A/D #1 BS2p EEPROM Coil # 1 Temp Sensor # 1 I C Bus 2 SPI Data Bus A/D #2Temp Sensor # 2 Hula-hoop 2 Design
21
BS2p Micro Controller Eight EEPROM Three 24-bit ADC Temperature sensor coil 12-bit ADC Temperature sensor 3-axis accelerometer (for comparison) Consists of three perpendicular coils around a non-magnetic sphere
22
Accelerometer A/D #1 A/D #2 BS2p EEPROM Coil # 1 Coil #2 Coil #3 Temp Sensor # 1 Temp Sensor # 2 I C Bus 2 SPI Data Bus Preliminary Design For Hula-hoop 3 A/D #3 A/D #4 Temp Sensor # 3 Temp Sensor # 4
23
Feb March April USLI 12 - 18 13 19 FSLP Model Launch 20 Model Launch/Avionic Complete FSLP Rain Date Booster Complete Avionics Test 26 5 Time Line 5 Rocket Complete
24
Begin Construction: February 1 Booster Complete: February 5 Avionics Complete: February 19 Dual Deployment Avionics Test: February 26 Rocket Construction Complete: March 5
26
Community Outreach Boys/girls Club etc. Model Rocket Launches School Involvement Payload Projects ARCHES TARC Military Involvement Reach Across the Pacific KMCAS O’Lelo
27
Mahalo Please don’t hate us because we live in Hawaii
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.