Engineering constraints on Upper River Road between Gold Ray Dam and the proposed boat ramp include: 1. Potential floodplain impacts. 2. Environmental permitting issues. 3. Steep grades and ADA issues. 4. Narrow width between RR track & River. 5. State law may require County to post speed limit at “Basic Rule”. Transferring shared use road to another entity like State Parks would allow a lower speed limit.
3
Near railroad crossing at dam looking south Issue: 1. Steep grade (ADA compliance)
4
Railroad crossing near dam looking north Issues: 1. Narrow width, steep side slope.
5
200 feet north of tracks Issues: 1. Narrow, steep side slope, bedrock.
6
A few hundred feet north of tracks Issues: 1. Narrow, steep side slope, bedrock.
7
1800 feet north of tracks Issue: 1. Steep grade (ADA compliance)
11
Dense trees near boat launch Issue: Floodplain
16
Additional Issues from Team Members Speed of traffic Congestion Security Preserving Environment Scenic and Aesthetics Aspects Road Closure Development/Planning Issues Abusive Use of Area Off-road vehicles Littering/Dumping Vandalism Noise Conflict between Groups Access for property owners and public Increased fire danger Restriction/elimination of uses Loss of privacy ADA access Maintenance and cost Dog issue Wetlands issue Emergency vehicle access Lighting Size of park Blackwell Rd/Upper River Rd intersection Rafting community representation needed