Phase I Preliminary Plans Pedestrian Walkway Planning Subcommittee (PWP) Stow Planning Board Meeting October 19, 2010.

Similar presentations


Presentation on theme: "Phase I Preliminary Plans Pedestrian Walkway Planning Subcommittee (PWP) Stow Planning Board Meeting October 19, 2010."— Presentation transcript:

1 Phase I Preliminary Plans Pedestrian Walkway Planning Subcommittee (PWP) Stow Planning Board Meeting October 19, 2010

2 Big picture – Walkway Planning in 2 phases Phase I - Connect existing walkways along 117 Corridor – Short-term – Plan, design, and construct a few sections of walkway along the 117 corridor Phase II - Prioritize other walkway and maintenance projects – Longer-term – Create a list of recommended projects – Plan for construction including design, maintenance, and funding.

3 Phase I Status Phase I moving along as planned – Upper Common has been taken out off the table for Phase I construction Community Survey Results – 85% supportive of increased walkability Phase I Land Survey Results – No major obstacles to construction – A little extra expense in a few places

4 Status Update (con’t) Open considerations – Snow removal Recent MA Supreme Court Ruling Need clarification on Stow’s official position/intent – Crosswalk locations Town Hall / Town Building Rt. 62 / 117 Intersection Harvard Rd. Hudson Rd – Parking Concur with Safety Officer recommendations Provides safe pedestrian access to overflow parking

5 Thank you.

6 EXTRAS

7 Phase I - Planning Proposed location of planned walkways: – Public inventory on Google maps http://maps.google.com/http://maps.google.com/ – Research and document feasibility (e.g. physical, legal) – Sample of planned walkway designs from Acton/Sudbury Walkway Plans, MAPC Communication with town and key groups: – Agreement to proceed from Planning Board and Selectmen – Open meetings: Benefits and barriers for proposed walkways Hearings as necessary

8 Phase I - Implementation Walkway Design: – Acquire design services either through professional contract or as a student project Walkway Construction: – Contract construction services through a standard bidding process Walkway Funding: – Design: existing walkway fund (~$249k)