1
Multi-Modal Transit Center at Taylor Street: Project Overview and Uses for the Upper Floors Public Forum October 16, 2013
2
Agenda 1.Welcome 2.History and Goals of the Project 3.Where we are Today 4.Input Needed A.How could the upper floor development best serve downtown? B.What would you like the building to look like? 5.Wrap-Up 2
3
Overview of Project Bike Path connector Pedestrian Bridge providing an important link between Main and Barre Streets and the bike path Park at the location where the Winooski and North Branch Rivers meet Multi-Modal Transit Center to include: – Welcome Center in partnership with the State – Upper floor development to be constructed and owned by a development partner 3
4
Purpose of the Project 4 To increase the efficiency of public transportation in Montpelier, improve vehicular transportation efficiency and mobility, advance an important link between two existing bike paths, and create usable open and green space in downtown.
5
2002 Bond Vote 5 “To see if the voters will authorize the City Council to borrow a sum not to exceed $800,000 for the City’s share of the acquisition and development of the Capital District Master Plan Carr Project: the purchase of the so-called Carr Lot and the construction of improvements thereon for a park and/or public transit center and/or a tourist information/welcome center and/or a public parking lot and/or a transportation path.”
6
Funding Sources 2002 Bond Federal Transit Administration (FTA) – to build the Multi-Modal Transit Center Federal Transportation (FHWA) – for site improvements and redevelopment of downtown VTrans Enhancement Grant – for pedestrian bridge efforts 6
7
7 Site Parameters
8
8
9
9
10
10 Site Parameters
11
11 Site Parameters
12
Where we are today 12 Under agreement to procure the Carr Lot, TKS property, and the property at the Vermont Association for the Blind In conversations to procure the properties from Mowatt Trust, Heney Family Trust and Capitol Plaza for portions of the bike path Preliminary Plans completed for the Bike Path and Pedestrian Bridge Request for Qualifications issued last week to secure a development partner
13
Timeline 13 Goal: To initiate construction in the Fall of 2014 with facility complete and open in 2015. TimeTask February 2014 Finalize purchase of all properties Select a Development Partner for the Multi-Modal Transit Center building May 2014 Obtain right-of-way and environmental clearances June 2014 Bike Path final designs complete July to September 2014 Bid out Bike Path construction August 2014 Multi-Modal Transit Center final designs complete October 2014 to Fall 2015 Construct Bike Path including Pedestrian Bridge Construct Multi-Modal Transit Center
14
Multi-Modal Transit Center Vision: the City (in collaboration with the State) will own and maintain the site and facility with the upper floors owned by a separate entity in a condo relationship. Development Goals: Build a state-of-the art multi-modal transit center to serve the residents of Montpelier. Leverage federal funds to encourage upper floor development thereby adding to the Grand List, increasing downtown vibrancy, and building a signature structure at this important City gateway. Lead a transparent process that allows for resident feedback, innovative design, and maximize return for the taxpayers of Montpelier. 14
15
Multi-Modal Transit Center: Zoning Requirements Carr Lot is in Central Business District I (CBI) Current Zoning requires: – The building to be a minimum of 2 stories with development potential of a maximum of 6 stories. – Residential is allowed but may be limited due to cost, time and environmental constraints. – 1 parking space for every 400 ft 2 15
16
Multi-Modal Transit Center: Parking Requirements * Parking replacement fees, offsite parking arrangements, and other creative solutions can help offset some of the on- site demand. Additionally, the multi-modal transportation hub for buses, bikes, and pedestrians may allow for creative solutions to the parking and zoning requirements. 16 Floors (5,000 ft 2 footprint) Estimated Parking Spaces Required* 1 Floor13 2 Floors25 3 Floors38 4 Floors50 5 Floors63 6 Floors75 Note: The footprint of the building could be between 3,600 ft 2 and 6,000 ft 2.
17
Input Needed How could the upper floor development best serve downtown? 17
18
Input Needed What would you like the building to look like? 18
19
Wrap-Up Final Questions or Comments 19