1
Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005
2
Material on this page is consider Non-Internet Public (NIP) You would like a copy of this slide, please contact: Public Reference Room Telephone: 202-502-8371 Toll-free 1-866-208-3676 Email: public.referenceroom@ferc.govpublic.referenceroom@ferc.gov
3
Item No. C- 7 - Details Weaver’s Cove Energy, LLC Proposed Facilities & Service marine berth, an marine berth, an LNG storage tank LNG storage tank vaporization facilities vaporization facilities LNG truck distribution facility LNG truck distribution facility base-load deliveries of 400,000 Dth per daybase-load deliveries of 400,000 Dth per day peak day deliveries of up to 800,000 Dth per day.peak day deliveries of up to 800,000 Dth per day.
4
Item No. C- 7 - Details Mill River Pipeline, LLC two 24-inch diameter laterals two 24-inch diameter laterals Western Lateral: 2.52 miles from the Weaver’s Cove LNG facility to Algonquin’s existing 20-inch diameter G-22 lateral Western Lateral: 2.52 miles from the Weaver’s Cove LNG facility to Algonquin’s existing 20-inch diameter G-22 lateral Northern Lateral: 3.59 miles from the LNG terminal to Algonquin’s existing 12 and 20- inch diameter G-1 laterals. Northern Lateral: 3.59 miles from the LNG terminal to Algonquin’s existing 12 and 20- inch diameter G-1 laterals.
5
July 29, 2003 – Joint Public Scoping Meeting with MA Executive Office of Environmental Affairs in Swansea, MA July 29, 2003 – Joint Public Scoping Meeting with MA Executive Office of Environmental Affairs in Swansea, MA May 4, 2004 – FERC staff conduct a publicly noticed inspection of the proposed terminal site May 4, 2004 – FERC staff conduct a publicly noticed inspection of the proposed terminal site June 30, 2004 – FERC staff participate in a public meeting in Tiverton, Rhode Island June 30, 2004 – FERC staff participate in a public meeting in Tiverton, Rhode Island September 1, 2004 – FERC staff participate in a public meeting in Bristol, Rhode Island September 1, 2004 – FERC staff participate in a public meeting in Bristol, Rhode Island September 8-9, 2004 – Public comment meeting on the DEIS in Swansea, MA and Middletown, RI September 8-9, 2004 – Public comment meeting on the DEIS in Swansea, MA and Middletown, RI Item No. C- 7 – Details Public Meetings
6
initial emergency response plan; initial emergency response plan; identify emergency evacuation routes prior to construction; identify emergency evacuation routes prior to construction; develop emergency response plans with local officials throughout the construction period. develop emergency response plans with local officials throughout the construction period. numerous final design improvementss regarding the safe operation of the facility. numerous final design improvementss regarding the safe operation of the facility. Item No. C- 7 - Details Additional Security & Emergency Plans