Presentation is loading. Please wait.

Presentation is loading. Please wait.

Greg Mandt GOES-R System Program Director 2011 Satellite Direct Readout Conference April 5, 2011.

Similar presentations


Presentation on theme: "Greg Mandt GOES-R System Program Director 2011 Satellite Direct Readout Conference April 5, 2011."— Presentation transcript:

1 Greg Mandt GOES-R System Program Director 2011 Satellite Direct Readout Conference April 5, 2011

2 Continuity of GOES Operational Satellite Program 2

3 Spare GOES-R Mission Overview Visual & IR ImageryLightning MappingSpace Weather Monitoring Solar Imaging Advanced Baseline Imager (ABI) Geostationary Lightning Mapper (GLM) Space Environment in-Situ Sensor Suite (SEISS) Magnetometer Solar Ultra-Violet Imager (SUVI) Extreme UV/X-Ray Irradiance Sensors (EXIS) GOES-R is the next generation of GOES satellites that will provide a major improvement in quality, quantity, and timeliness of data collected. Earth PointingSun PointingIn-Situ New and improved capabilities for: increased lead times for severe weather warnings better storm tracking capabilities solar, space weather, and climate analyses advanced products for aviation, transportation, commerce 3

4 20072008200920102011201220132014 2015 Program/ System Working to System PDR in June 2011 Working to System PDR in June 2011 Flight Segment PDR held January 18-20 2011 ABI delta CDR Complete ABI delta CDR Complete Ground Segment Antenna SDR complete Antenna SDR complete Core GS PDR complete Antenna System PDR April 2011 GS Project PDR in May 2011 System Design Review complete 5 Instrument contracts underway EXIS, SUVI, SEISS, and GLM have all passed CDR Core contract awarded to Harris Corp. 80% delivery of baseline product algorithms Core SRR complete RBU lease awarded Spacecraft Instruments Development Integration and Testing Launch Readiness Oct. 2015 Spacecraft SDR complete 4

5 GOES-R Spacecraft Lockheed Martin Space Systems Co (LMSSC) of Newtown, PA is primary contractor Advanced Baseline Imager (ABI) Geostationary Lightning Mapper (GLM) Solar UV Imager (SUVI) Magnetometer Space Environment In-situ Suite (SEISS) Extreme UV/X-ray Irradiance Sensor (EXIS) 5 Specifications Size: ~5.5 meters (from launch vehicle interface to top of ABI) Mass: Satellite (spacecraft and payloads) dry mass <2800kg Power Capacity: >4000W at end-of- life (includes accounting for limited array degradation) Spacecraft on-orbit life of 15 years with orbit East-West and North-South position maintained to within +/-0.1 degree 3-axis stabilized

6 Advanced Baseline Imager (ABI) Specifications 16 channel imager Improves upon current capabilities in spectral information (3X), spatial coverage (4X), and temporal resolution (5X) Improves every product from current GOES Imager and will offer new products for severe weather forecasting, fire and smoke monitoring, volcanic ash advisories, and more ABI Proto-Type Model (PTM) 6 The Advanced Baseline Imager (ABI) on the GOES-R Series: Tim Schmit – Tue, April 5, 1:45 pm ITT Corporation of Ft. Wayne, IN is primary contractor

7 Geostationary Lightning Mapper (GLM) 7 Specifications Detects total lightning: in-cloud, cloud-to- cloud, and cloud-to-ground 70-90% flash detection day and night Near uniform spatial resolution Aids in forecasting severe storms and tornado activity, and convective weather impacts on aviation safety and efficiency Currently no ocean coverage, and limited land coverage in dead zones Optical Assembly Sensor Unit Mechanical Support Structure Metering tube High Impact Weather Forecasts & Warnings with the Geostationary Lightning Mapper: Steve Goodman – Tue, April 5, 2:00 pm Lockheed Martin Advanced Technology Corp of Palo Alto, CA is primary contractor

8 8 Space Weather Instruments Space Environment Impacts Earth! – Instruments provide early warning – Communications satellites / power grids – Voice and data blackouts over poles Communications blackouts Aviation routing – Astronaut safety Solar storms can expose astronauts to equivalent of 8 chest X-rays SEISS Brassboard Units EXIS Mass Model SUVI Structural Assembly EHIS SGPS DPUMPS-LoMPS-Hi

9 9 GOES-R System Operational View Data and Products LAN WCDAS DCPC DCPR DCS Suitland, MD Fairmont, WV Enterprise Management Mission Management Product Generation L2+ Data and Products Product Distribution LAN NSOF RBU LAN MM EM PG (L0, L1B, L2+ GLM, GRB, KPP) PD MM: Mission Management EM: Enterprise Management PG: Product Generation PD: Product Distribution PDA: Product Dist. & Access System HRIT/EMWIN, GRB SARSAT GEOLUT BEACONS DCS DRGS Data Collection Platforms (DCP) L1b, MM EM PG PD Wallops, VA 75 o WAN 137 o GOES-R Access Subsystem (part of PDA) User Community L2+ GLM, GRB L0,

10 10 GOES Rebroadcast and Unique Payload Services GRB – GOES Rebroadcast (GRB) – GRB will contain the Level 1b data from each of the GOES-R Series instruments and is the GOES-R Series version of today’s GOES Variable format (GVAR). Information Network (HRIT/EMWIN) – New high data rate (400 Kbps) – Combination of today’s LRIT (Low Rate Information Transmission) and EMWIN services; – Delivers selected imagery, charts, other environmental data products, and text messages (NWS Watches and Warnings) to hemispheric users. Data Collection System (DCS) – GOES-R spacecraft relay data transmissions for nearly 30,000 in-situ environmental data platforms from across the hemisphere. – GOES-R will support 300 bps, 1200 bps, and CDMA platforms. SARSAT – All GOES-R satellites support the Search and Rescue Satellite Aided Tracking (SARSAT) service by relaying distress signals from in-situ Emergency Position Indicating Radio Beacons (EPIRBs) and other transmitting devices.

11 Direct Readout Comparisons GOES I-P GOES-R Full Disk Image30 minutes5 minutes Imager bands516 Visible1 kilometer0.5 kilometer Near InfraredN/A1 kilometer Infrared4 kilometer2 kilometer Bit Depth10 bits12 bits – Visible, 14 bits Infrared Raw Instrument Data2.62 Mbps~ 100 Mbps (ABI: ~60Mbps) Space Weather~100 kbps3.5 - 4Mbps Geostationary Lightning MapperN/A7.5 Mbps Telemetry4 kbps1, 4 & 32 kbps Planned Data Outage>300 hrs/yr<2 hrs/year GRB/GVAR2 Mbps31 Mbps HRIT/EMWINLRIT: 128 kbps EMWIN: 19.2 kbps 400 kbps DCS233 simultaneous downlinks466 simultaneous downlinks SARSAT36 dBm uplink power32 dBm uplink power (will be able to detect emergency beacons with weaker signals) 11 NOAA Report on the Development of the GOES-R Access Subsystem (GAS) and Future Products: Reginald Lawrence, Tues, Apr 5, 2:45 pm HRIT/EMWIN Prototype Demonstration : Craig Keeler, Tues, Apr 5, 5:30pm

12 GOES Rebroadcast (GRB) Data Transition Full set of level 1b products, including data from all ABI channels and the other GOES-R instruments (GLM, MAG, SEISS, SUVI, EXIS). GOES users must acquire new hardware, or upgrade their existing GVAR systems in order to receive GOES-R data. Existing GVAR systems will need new receiver antenna hardware, as well as new signal demodulation hardware and computer hardware so that they are able to handle the large amount of GOES-R data. CLASS will provide permanent archive for GOES-R data as part of its mission to be the single data repository for NOAA. GOES-R Rebroadcast Services: Satya Kalluri– Tue, April 5, 2:30 pm 12

13 GOES-R Changes Since 2008 DRO No eGVAR (Emulated GOES Variable Data) – Program will work with users to transition directly to GRB GOES-R L band frequency shift – Presidential Broadband Initiative 13 Breakout Session: Transition from GOES to GOES-R: GVAR, GRB, GAS: Thu, April 7, 3:30 pm

14 Training and Education Online training modules http://meted.ucar.edu/goes_r/envmon/ http://cimss.ssec.wisc.edu/satmet/ http://rammb.cira.colostate.edu/visit/video/goesr101/player.html http://rammb.cira.colostate.edu/training/shymet/forecaster_intro.asp 14

15 GOES-R Proving Ground 15 GOES-R Proving Ground Talks: Tues, April 5, 3:30 – 5:15 pm

16 7 th GOES Users’ Conference Joint with 36 th Annual NWA Meeting in Birmingham, AL Oct. 15-21, 2011 at the Wynfrey Hotel Visit: http://www.goes-r.gov or http://www.nwas.org/meetings for more info!http://www.goes-r.govhttp://www.nwas.org/meetings Deadline for poster abstracts: June 1 16

17 Thank you! Any ???


Download ppt "Greg Mandt GOES-R System Program Director 2011 Satellite Direct Readout Conference April 5, 2011."

Similar presentations


Ads by Google