Download presentation
Presentation is loading. Please wait.
Published byJerome Booth Modified over 9 years ago
1
Modeling the ISOLA case study environment scenario (outside the system) application scenario (inside the system)
2
- ACTIONS Environment Scenario (1) - ACTIONS - REACTIONS - ACTIONS - REACTIONS - TIMING REQUIREMENTS - ACTIONS - REACTIONS - TIMING REQUIREMENTS - LOAD CHARACTERISATION
3
Environment Scenario (2) - SCENARIO DEFINITION - ACTIONS - SCENARIO DEFINITION - ACTIONS - REACTIONS - SCENARIO DEFINITION - ACTIONS - REACTIONS - TIMING REQUIREMENTS - SCENARIO DEFINITION - ACTIONS - REACTIONS - TIMING REQUIREMENTS - LOAD CHARACTERISATION
4
Application Scenario (1) - INPUTS - OUTPUTS - INPUTS - OUTPUTS - SCENARIO - INPUTS - OUTPUTS - SCENARIO - MESSAGE LENGTH - INPUTS - OUTPUTS - SCENARIO - MESSAGE LENGTH - WCET VALUES
5
Application Scenario (2) - INPUTS - OUTPUTS - INPUTS - OUTPUTS - SCENARIO - INPUTS - OUTPUTS - SCENARIO - INPUTS - OUTPUTS - SCENARIO - INPUTS - OUTPUTS - SCENARIO - MESSAGE LENGTH - INPUTS - OUTPUTS - SCENARIO - MESSAGE LENGTH - WCET VALUES
6
Defining Architectures NAVRAD MMI 22 MIPS 11 MIPS113 MIPS 72 kbps (A) - COMPUTATION - COMMUNICATION - COMPUTATION - COMMUNICATION - DEPLOYMENT
7
Fixing Priorities NAVRAD MMI 22 MIPS 11 MIPS113 MIPS 72 kbps (A)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.