Download presentation
Presentation is loading. Please wait.
Published byAugustine Hodge Modified over 9 years ago
1
1 MUID FEE TAC Presentation Vince Cianciolo 7 May 1998
2
2 Outline Intro In-panel electronics Out-panel electronics Cost & Schedule
3
3 MUID FEE Team Vince Cianciolo: Subsystem Manager Ganesh Rao: ROC Design (Digital) Bobby Whitus: ROC Design (Analog) Tim Gee: FEM Design Steve Hicks: FEM design, Crate/TC/Backplanes Yuri Kamyshkov, Yuri Efremenko: In-panel amplifiers Consulting with: –B. Bryan: System Considerations –M. Smith: PC Heap Manager, Test Fixtures, G-link –J. Walker: Test Fixtures –H. Skank: 6x Generator
4
4 MUID in PHENIX
5
5
6
6 MUID Operation Reconstruct tracks in two orthogonal views; find maximum depth. Obtain precision momentum measurement from Muon Tracker. rejection (10 -4 ) via momentum/depth discrimination. Struck bit pattern is LVL1 input (where steerable road algorithm is implemented).
7
7 MUID Numbering 2 arms 5 gaps/arm 4 large, 2 small panels/arm Large panels –H: 118 tubes > 59 channels > 4 16-pair signal cables –V: 128 tubes > 64 channels > 4 16-pair signal cables Small panels –H: 90 tubes > 45 channels > 3 16-pair signal cables –V: 52 tubes > 26 channels > 2 16-pair signal cables MUID –H: 6520 tubes > 3260 channels > 220 16-pair signal cables –V: 6160 tubes > 3080 channels > 200 16-pair signal cables –6340 active channels, 6720 channels instrumented
8
8 MUID Gap
9
9 MUID Panels
10
10 Iarocci Tubes
11
11 MUID Readout Channel (2-pack) Halve readout channels Improves timing Eliminate geometrical inefficiency Add redundancy
12
12 MUID FEE Requirements Integrating filter to reduce noise from large tube capacitance (500-1000 pF/channel). Capabilty to drive long cables (~20 m). All signals arrive within one beam clock cycle for LVL1. Only digital information (struck bit pattern) required. Longevity (!) for anything inside the panel.
13
13 MUID FEE Processing Chain
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.