2 BUILDING STRONG ® Overview  Hydraulic Dredging  Mechanical Dredging  Additional Items ► 2012 plans ► DMMP’s Cave Hollow Keithsburg Finley's/Hurricane ► FWS – Pool 15 Mussel Restoration

3 BUILDING STRONG ® UMR Hydraulic Dredging Pool 22 ► Cave Hollow RM 306 Mechanical Beneficial UseMechanical Beneficial Use  Pool 21 ► LaGrange RM 336 ► Hogback RM 332  Pool 20 ► Buzzard RM 349  Pool 18 ► Keithsburg Lower RM 426

4 BUILDING STRONG ® Pool 21 – Hogback RM 332 (1) Mechanical - Sept  Amount Dredged: ► 2,973 cy  Placement Site: ► Thalweg RM 330.8  Dredging Depth: 11’  Beneficial Use: No  Water Quality Monitoring: Per MODOC and ILDNR

5 BUILDING STRONG ® Pool 21 – Hogback (2&3) Hyd. Dredge Goetz – Oct & Nov  Amount Dredged: ► 2 – 28,325 cy (had to suspend to do Keithsburg) ► 3 – 35,925 cy  Placement Site: ► 2 – Bankline RM 331.5-331.8L ► 3 – Thalweg RM 330.9  Dredging Depth: 11’  Beneficial Use: No  Water Quality Monitoring: Per MODOC and ILDNR

6 BUILDING STRONG ® Pool 21 – LaGrange RM 336  Amount Dredged: ► 48,705 cy  Placement Site: ► Bankline stockpile RM 336.2 – 336.5R  Dredging Depth: 11’  Beneficial Use: No  Water Quality Monitoring: Per MODOC

7 BUILDING STRONG ® Pool 20 – Buzzard RM 349 (1&2) Mech (1) & Hyd Dredge Goetz (2)  Amount Dredged: ► 1 – 8,419cy ► 2 – 57,102  Placement Site: ► 1 – Thalweg RM 348.6T ► 2 – DMMP Stockpile RM 348.8-349.1R  Dredging Depth: 11’  Beneficial Use: Yes  Water Quality Monitoring: Per ILDNR & MODOC

8 BUILDING STRONG ® Pool 16- Lock 16 Lower  Amount Dredged  14,235 yards  Placement Site  Bankline stabilization, RM. 456  Dredging Depth 11’  Water Quality Monitoring Per ILDNR

9 BUILDING STRONG ® Pool 16 – Buffalo RM 472 (Mech)  Amount Dredged: ► 3,907cy  Placement Site: ► Pocket Beaches RM473 L & Buffalo Shores RM471.6R  Dredging Depth: 11’  Beneficial Use: Yes  Water Quality Monitoring: Per ILDNR

10 BUILDING STRONG ® Pool 16 – Linwood/Horse Island RM 475.7-476.2 (Mech)  Amount Dredged: ► 33,955 cy  Placement Site: ► Buffalo Shores/Beach RM 471.8 &472.6R and Cent. Bridge RM 482.0 L  Dredging Depth: 11’  Beneficial Use: Yes  Water Quality Monitoring: Per IADNR

11 BUILDING STRONG ® Pool 16 – Lock 15 Lower RM 482.5 (Mech)  Amount Dredged: ► 5,317 cy  Placement Site: ► Cent. Bridge RM 482.0 L  Dredging Depth: 11’  Beneficial Use: Yes  Water Quality Monitoring: Per ILDNR

12 BUILDING STRONG ® 2012 Miss Rvr Dredging  Pool 11 ► Turkey River RM 609 ► Hurricane RM 599 ► Finleys RM 596  Pool 12 ► Island 241 RM 562  Pool 13 ► Sabula Lower RM 533 ► Dark Slough RM 531  Pool 14 ► LeClaire Canal RM 494  Pool 16 ► Linwood/Horse Island RM 475 ► Lock 15 Lower RM 483  Pool 17 ► Bass Island RM 477.5  Pool 18 ► Keithsburg Lower RM 425 ► Oquawka RM 415 ► Furnal Island RM 448  Pool 19 ► Burlington Bluff RM 401 ► Kemp’s /Craigel RM 400  Pool 20 ► Lock 20 Upper 343  Pool 21 ► Lonetree RM 331 ► Hogback RM 332  Pool 22 ► Whitney Island RM 314 ► Turtle Island RM 312 ► Cave Hollow RM 306

13 BUILDING STRONG ® LaGrange Pool-Copperas Creek  Amount Dredged  48,400 yards  Placement Site  Bankline stabilization, RM. 136.5- 137.1  Dredging Depth 11’  Water Quality Monitoring Per ILDNR

14 BUILDING STRONG ® LaGrange Pool-Beardstown  Amount Dredged  25,000  Placement Site  Beneficial Use, RM. 87  Dredging Depth 11’  Water Quality Monitoring Per ILDNR

15 BUILDING STRONG ® 2012 Ill Rvr Dredging  Marseilles  Dresden Lower, RM. 271, 8,700 yds.  Grist Island, RM. 259, 15,000 yds.  Starved Rock  Bull’s Island Upper, RM. 241, 2,300 yds.  Peoria Pool  Starved Rock Lower, RM. 229, 18,600 yds.  Illinois Power, RM. 212, 5,000 yds.  Henry, RM. 196, 5,000 yds.  Senachwine Creek, RM. 181, 5,000 yds.  Dresden Pool  Treat’s Island, Rm. 279, 8,000 yds  LaGrange Pool  Mackinaw River, RM. 147, 55,000 yds.  Kingston Mines, RM. 146, 35,000 yds.  Beardstown, RM. 88, 65,000 yds.  Brigg’s Landing, RM. 84 35,000 yds.