Presentation is loading. Please wait.

Presentation is loading. Please wait.

EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT.

Similar presentations


Presentation on theme: "EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT."— Presentation transcript:

1 EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT SECTION OF EXISTING PIPE FLASHING. REPAIR SHALL BE CIRCULAR AND SHINGLE LAPPED. (TYPICAL FOR EACH SUPPORT POST). EXISTING VENT PIPE (TYP). REFLASH PER PIPE FLASHING DETAIL ON SHEET RP-2. FALL PROTECTION SYSTEM TO BE PURCHASED BY OWNER AND INSTALLED BY ROOFING CONTRACTOR. ROOFING CONTRACTOR TO FLASH ALL ANCHORS FOR A WATERTIGHT INSTALLATION. REFER TO SHEETS RP-11 TO RP-18 EXISTING WALK-OFF MATS. RE-ADHERE ALL MATS TO EPDM. EXHAUST FAN EXHAUST FAN EXHAUST FAN EXHAUST FAN EXHAUST FAN EXHAUST FAN EXHAUST FAN EXHAUST FAN EXTEND REPAIR UNDER EXISTING LCC CAP AT BOTH ENDS OF BUILDING. RESEAL LCC CAP. SEAM STRIP / FORMFLASH AROUND ENTIRE PERIMETER OF EACH EXHAUST FAN (8 TOTAL). SEAM STRIP / FORMFLASH ALL EXISTING SEAMS, T- JOINTS AND ALL PREVIOUSLY PATCHED AREAS IN TOTO BETWEEN THE WALK-OFF PADS FOR THE ENTIRE LENGTH OF THE BARREL ROOF – SEE REPAIR DETAILS ON SHEET RP-3). NOT TO SCALE #1 EXTEND REPAIR UNDER EXISTING LCC CAP AT BOTH ENDS OF BUILDING. RESEAL LCC CAP. CUT OUT EIFS. INSTALL NEW LCC FLASHING AND COUNTERFLASHING TO COVER BASE OF LADDER ANCHORS. CAULK AND PROVIDE WATERTIGHT SEAL AT LADDER BRACKETS.

2 3 EXISTING DRAIN TO REMAIN (SEE NOTE 5). NEW REMOVE EXISTING EPDM. MAINTAIN EXISTING LCC CAP INPLACE. MODIFY VERTICAL FASCIA AS REQUIRED TO ACCEPT NEW FASCIA COVER. (REFER TO SECTION 00200 SCOPE OF WORK FOR ALTERNATE #1 REQUIREMENTS). CAREFULLY RELEASE AND BEND UP EXISTING LCC COUNTERFLASHING TO INSTALL NEW EPDM. CAREFULLY BEND DOWN FLASHING UPON COMPLETION OF EPDM. **NOTE: CAREFULLY RELEASE AND BEND UP EXISTING LCC COUNTERFLASHING TO INSTALL NEW EPDM. CAREFULLY BEND DOWN FLASHING UPON COMPLETION OF EPDM. ** CUT OUT EIFS. INSTALL NEW LCC FLASHING AND COUNTERFLASHING TO COVER BASE OF LADDER ANCHORS. CAULK AND PROVIDE WATERTIGHT SEAL AT LADDER BRACKETS. NEW FLASHING AT NE ROOF LADDER

3 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-3 FIRESTONE SEAM REPAIR DETAILS EXECUTION #1 THE REPAIR OF FIELD SEAMS WITH 6" QUICK SEAM BATTEN COVER 1.IN THE EVENT THAT THERE ARE ANY OBSTRUCTIONS TO HINDER THIS REPAIR EXECUTION I.E.: WALK PADS, LIGHTNING PROTECTION CABLES, ETC. REMOVE OR MOVE THE ITEM TO THE SIDE AND CONTINUE WITH THE REPAIR UNINTERRUPTED. UPON COMPLETION OF THE REPAIR REPLACE OR REPOSITION THE OBSTACLE TO IT’S ORIGINAL POSITION. BE SURE TO REMOVE ANY FIELD PATCHES THAT OCCUR IN THE SPLICE AREA TO BE REPAIRED. WHEN REMOVING EXISTING PATCHES, A RIDGE OF LAP SEAL WILL REMAIN, THIS MUST BE REMOVED OR ADDRESSED AS A T-JOINT. IF NOT REMOVED, STRIP-IN LARGE PATCHES AND OVERLAY SMALL PATCHES WITH FORMFLASH. 2.CLEAN A MINIMUM 10" SECTION OF THE IN-SERVICE MEMBRANE, CENTERED OVER THE EXISTING SEAM STEP-OFF, AS OUTLINED IN THE ATTACHED SPECIFICATION "CLEANING OF IN-SERVICE MEMBRANE". 3.APPLY THE SPLICE ADHESIVE TO THE RECEIVING SURFACE A MINIMUM 4" ON EACH SIDE OF THE EXISTING SEAM STEP-OFF AS OUTLINED IN THE ATTACHED SPECIFICATION FOR THE "APPLICATION OF SPLICE ADHESIVE AND LAP SEALANT”. DO NOT APPLY SPLICE ADHESIVE TO THE QUICK SEAM BATTEN COVER. 4.AFTER THE ADHESIVE HAS FLASHED OFF INSTALL THE FIRESTONE 6" QUICK SEAM BATTEN COVER INTO THE ADHESIVE FILM CENTERING THE STRIP OVER THE EDGE OF THE SEAM. 5.WITH 3" SILICONE ROLLERS, ROLL THE NEWLY SPLICED PIECE TWICE; FIRST ACROSS (OR PERPENDICULAR TO) THE MATED SURFACE, THEN SECOND ALONG THE LENGTH OF THE SPLICED EDGE. 6.AT ALL T-JOINTS (TAPE TO TAPE, TAPE TO FORMFLASH AND TAPE TO EPDM) AND AT TAPE ENDS A FORMFLASH PATCH MUST BE INSTALLED EXTENDING A MINIMUM OF 3" ON EACH SIDE OF THE T-JOINT. 7.AFTER ADHESIVE HAS CURED A MINIMUM OF FOUR HOURS, INSTALL EDGE TREATMENT OF SA-1065 & LAP SEALANT PER THE ATTACHED SPECIFICATION TITLED "APPLICATION OF SPLICE ADHESIVE AND LAP SEALANT" TO THE ENTIRE FORMFLASH PATCH. LAP SEALANT IS NOT REQUIRED ALONG BATTEN COVER EDGES. 8.ENSURE THAT THE ROOF IS LEFT WATERTIGHT AT THE END OF EACH WORKING DAY.

4 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 TOP OF BARREL ROOF NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-4 EXISTING WALK-OFF MATS. RE- ADHERE ALL MATS TO EPDM. SEAM STRIP / FORMFLASH ALL EXISTING SEAMS, T-JOINTS AND ALL PREVIOUSLY PATCHED AREAS IN TOTO BETWEEN THE WALK- OFF PADS FOR THE ENTIRE LENGTH OF THE BARREL ROOF – SEE REPAIR DETAILS ON SHEET RP-3).

5 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 TYPICAL EXHAUST FAN 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-5 SEAM STRIP / FORMFLASH AROUND ENTIRE PERIMETER OF EACH EXHAUST FAN (8 TOTAL).

6 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 ACCESS LADDER TO BARREL ROOF 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-6 RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT SECTION OF EXISTING PIPE FLASHING. REPAIR SHALL BE CIRCULAR AND SHINGLE LAPPED. (TYPICAL FOR EACH SUPPORT POST).

7 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-7 EXISTING CONDITION PHOTOS

8 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-8 EXISTING CONDITION PHOTOS

9 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-9 EXISTING CONDITION PHOTOS

10 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-10 ALTERNATE – SOUTH LOWER ROOF

11 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-11 FALL PROTECTION LAYOUT PLAN FROM FIXFAST

12 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-12

13 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-13

14 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-14

15 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-15 - PROVIDED & INSTALLED BY ROOFING CONTRACTOR

16 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-16

17 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-17

18 DATE: 3/28/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y MAJOR MAINTENANCE FY15 161 CROSS STREET FREEMAN ATHLETIC CENTER BACON FIELD HOUSE ROOF REPAIRS SHEET 1 OF ?? RP-18 FALL PROTECTION SYSTEM COMPONENTS


Download ppt "EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT."

Similar presentations


Ads by Google