Practice ALL safety precautions. Follow all OSHA & Manufacturers’ safety recommendations. Wear protective gear THINK SAFETY 1st
5
Gasket Types O-Ring –Circular Profile Single Off-Set –Triangular Profile
6
Gasket Types O-Ring –Circular Profile Single Off-Set –Triangular Profile Assembly method of these 2 gaskets is NOT the same
7
ONLY Assembly Difference Lube gasket and lube spigot BEFORE installing gasket onto spigot Lube spigot AFTER putting on the gasket O-RING SINGLE OFFSET
9
Step 1 – Clean & Inspect Clean the bell AND spigot Remove all dirt and debris
10
Step 1 – Clean & Inspect Inspect the Bell and Spigot
11
Step 1 – Clean & Inspect Look for cracks & chips.
12
Step 1 – Clean & Inspect REPORT findings to supervisor for disposition.
14
Step 2 – Placing the Gasket LIFT the precast following proper handling & safety procedures Lift Bar Lift Pins
15
Step 2 – Placing the Gasket LIFT the precast following proper handling & safety procedures
16
Step 2 – Placing the Gasket Place Ridges AGAINST Spigot Ridges Spigot
17
Step 2 – Placing the Gasket SHOULDER GAP Make sure the gasket is fully seated in the shoulder or groove of the joint
18
Push gasket against shoulder or groove SHOULDER Remove Gap. Step 2 – Placing the Gasket
19
It is important to equalize the gasket to remove bunching and overstretching
20
Insert screwdriver or other blunt, rounded instrument
21
Step 2 – Placing the Gasket Equalize gasket to remove bunching and overstretching Go completely around the structure to insure the gasket is stretched evenly around the joint.
22
Step 2 – Placing the Gasket Visually recheck the gasket to make sure it is seated snugly against the groove
24
Step 3 – Lubrication Proper Lube Use clean lube
25
Step 3 – Lubrication Generously Lube the Bell LUBE INSIDE THE BELL
26
Step 3 – Lubrication Generously Lube For SINGLE OFFSET, place lube on top of gasket AFTER ASSEMBLY onto spigot For O-RING, lube spigot and lube gasket, THEN ASSEMBLE onto spigot.
27
Step 3 – Lubrication Generously Lube the Gasket Lube goes ON TOP of Gasket Do NOT Place Lube on a Bare Spigot REMEMBER! For Single Off-Set Gaskets….
29
Step 4 – Set the Precast Section KEEP THE STRUCTURE LEVEL AND PLUMB
30
Step 4 – Set the Precast Section KEEP THE STRUCTURE LEVEL AND PLUMB
31
Step 4 – Set the Precast Section COMPLETE THE SECTIONS
33
Step 5 – Visual Inspections Walk around the structure to verify the section is seated evenly
34
Make sure the joints are seated evenly all around Step 5 – Visual Inspections Look inside and outside structure
35
SAFETY 1st CLEAN, INSPECT JOINTS PLACE GASKET - EQUALIZE LUBRICATE SET PRECAST – ENSURE LEVEL RE-INSPECT
36
O-RING SINGLE OFFSET REMEMBER Lube gasket and lube spigot BEFORE installing gasket onto spigot Lube spigot AFTER installing gasket