Presentation is loading. Please wait.

Presentation is loading. Please wait.

Template v1 September 12, 2012 1 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Infor LN: v10.3 – v10.4 Manufacturing Non-conformance Handling.

Similar presentations


Presentation on theme: "Template v1 September 12, 2012 1 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Infor LN: v10.3 – v10.4 Manufacturing Non-conformance Handling."— Presentation transcript:

1 Template v1 September 12, 2012 1 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Infor LN: v10.3 – v10.4 Manufacturing Non-conformance Handling Differences Rollout Training Campus Course Code: 02_0021040_EEN0471_ELN July 2014 Robert Nooder

2 Template v1 September 12, 2012 2 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Introduction Overview Non-conforming Handling Reject production material Reject production end-item Agenda

3 Template v1 September 12, 2012 3 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Objective new quarantine functionality: Support processes for handling a non-conforming item purchase, warehousing, production (SFC) Support Quarantine Inventory multiple locations, planning Enhance consistency terminology, processes Introduction Pre-requisite: Rollout Training: 02_0021040_EEN0441_ELN Warehouse Management, Inspection & Quarantine Differences

4 Template v1 September 12, 2012 4 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Overview non-conformance Handling LN 10.3 Materials / Components Warehouse End items Warehouse Material Issue End item Receipt Operation 20 Operation 30 Operation 10 Production order End item Issue Material Receipt Scrap RejectReturnScrap

5 Template v1 September 12, 2012 5 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Overview non-conformance Handling LN 10.4 Materials / Components Warehouse End items Warehouse Material Issue End item Receipt Operation 20 Operation 30 Operation 10 Production order End item Issue Material Receipt Scrap Quarantine Return Rework * ReturnReworkScrap * * * * * * * * * * QuarantineRework * * Return * * new

6 Template v1 September 12, 2012 6 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Overview non-conformance Handling LN 10.4 Materials / Components Warehouse End items Warehouse Material Issue End item Receipt Operation 20 Operation 30 Operation 10 Production order End item Issue Material Receipt Scrap Quarantine Return Rework * ReturnReworkScrap * * * * * * * * * * QuarantineRework * * Return *

7 Template v1 September 12, 2012 7 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Set-up Reject Production End-item / Material Warehouse Inventory Handling Parameters:Quarantine implemented Inventory Handling Parameters:Quarantine Inventory available for planning Warehouse:Quarantine implemented Warehouse:Designated quarantine warehouse Warehouse / Locations:Quarantine locations Item: Item Warehouse Data:Rejects Handling: Scrap, Quarantine, Both Item Warehouse Data:Disposition Due Lead Time

8 Template v1 September 12, 2012 8 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Scenario Production order has been created and released Material has been issued from the warehouse to the shop floor A non-conforming material is found In the session “Material to issue for Production Orders” Reject a quantity of the applicable material Scrap and / or quarantine a quantity of the material Initiate the re-issue of the scrapped and /or quarantined material In the session “Quarantine Inventory” Decide on the disposition Handle the quarantined inventory Handling non-conforming Material

9 Template v1 September 12, 2012 9 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Scenario Production order has been created and released On an operation a non-conformance is found In the session “Report Operations Complete” Reject a quantity of the manufactured item Scrap and / or quarantine the manufactured item In the session “Quarantine Inventory” Decide on the disposition (rework ) Maintain and release the generated production (rework) order Issue the applicable quarantined item Handling non-conforming End-item

10 Template v1 September 12, 2012 10 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Production non-conforming Material Operation 20 Operation 30 Operation 10 Production order Receipt Inspection Bulk/Pick Quarantine Warehouse Staging the material can be moved to quarantine If the disposition is “return to supplier” a return purchase order is created the material can be scrapped

11 Template v1 September 12, 2012 11 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Production order Quality Inspection order Receipt Inspection Bulk/Pick Quarantine Warehouse Staging If the disposition is “rework to existing specification” or “rework to new specification” a production (rework) order is created When QM is implemented and if applicable the quality inspection order (type “routing (TI)”) is created Depending on the outcome of the Quality Inspection Order or a decision outside LN the unfinished manufactured item can be moved to quarantine Production non-conforming manufactured Item Operation 20 Operation 30 Operation 10 Production (rework) order Depending on the outcome of the Quality Inspection Order or a decision outside LN the unfinished manufactured item can be scrapped)


Download ppt "Template v1 September 12, 2012 1 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Infor LN: v10.3 – v10.4 Manufacturing Non-conformance Handling."

Similar presentations


Ads by Google