Download presentation
Presentation is loading. Please wait.
Published byColin Hunter Modified over 9 years ago
1
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998
2
17-Sept-98 Outline A status report on the front-end and digitizing electronics Overview of requirements Development status July ’98 test beam results Barrel module 0 equipped with 2 superdrawers –90 channels First system tests with “in-drawer” digitizers
3
17-Sept-98 REQUIREMENTS Process 10,000 PMT signals Located in 256 electronics drawers Up to 45 PMT/drawer Each module self-contained with own electronics
4
17-Sept-98 REQUIREMENTS Performance 16 bit dynamic range Up to 2 TeV in single cell Must see muons –Calibration and monitoring –Enhance muon ID Readout resolution should not degrade calorimeter energy resolution Calorimeter resolution > ~2% Need readout resolution of a few percent in each cell Jet populates many channels –averaging effects
5
17-Sept-98 REQUIREMENTS In situ calibration Gives readout conversion factor (pC/count) Measures linearity Calibrates source integrator Slow integrator for PMT current LVL1 trigger tower sums
6
17-Sept-98 ORGANIZATION 3-in-1 Card One per PMT Plugs into PMT anode Near-ideal current source Pulse shaped signals to digitizers Integrator for source calibration and monitoring min-bias current Gain switching Output gating Charge injection for electronics calibration LVL1 Trigger output Gated
7
17-Sept-98 ORGANIZATION Mother Boards set of 4 in tandem per drawer Services and control signals to 3-in-1 Digitizer Boards set of 4 (or 8) per drawer Connections to drawer TTC fiber S-LINK fiber D.C. Power CANbus
8
17-Sept-98 Bigain pulse shaper 7-pole Bessel filter (purely passive) Exploit current source nature of PMT No noise, no power Very linear Clamping amplifiers and drivers Gain ratio 64:1 for dual 10-bit ADCs 3-in-1 Card Status
9
17-Sept-98 Output pulse to digitizers Low Gain (1 GeV/mV) Full scale signal High Gain (16 MeV/mV) Muon signal 3-in-1 Card Status
10
17-Sept-98 Linearity and calibration Residuals < 1 count over full dynamic range 3-in-1 Card Status ±1 count
11
17-Sept-98 Source integrator Essential for Cs calibration and monitoring of calorimeter See preceding talk Cs calibration has short-term reproducibility of ~ 0.1% Should be matched by electronics stability 3-in-1 Card Status
12
17-Sept-98 independent readout for each drawer ADC board + CANbus Multiplexed to individual 3-in-1 cards Integrator Readout Status
13
17-Sept-98 Source Integrator Stability better than 0.1% over 2 months (calibrator + integrator)
14
17-Sept-98 Digitizer Status Partially equipped Barrel Module 0 (30 channels) in July ’98 First system test of “in-drawer” digitizers Two 10-bit 40 MSPS ADCs per channel High gain scale 0 - 16 GeV (16 MeV/count) Low gain scale 0 - 1000 GeV (1 GeV/count) Commercial components TTC input on optical fiber 40 MHz clock, LVL1 accept, digitizer control data
15
17-Sept-98 Digitizer Status Pipeline delay via custom ASIC Digital memory unit (DMU) Originally developed for PHENIX TEC Output via optical S-LINK Read with optical LDC/PMC, RIO processor
16
17-Sept-98 July ’98 Test Beam Results Laser calibration Measure linearity and stability of PMT and electronics 3 PIN diodes to monitor laser
17
17-Sept-98 July ’98 Test Beam Results Digitized signals More pedestal noise on high gain channel Digitizing clock not synchronized to beam
18
17-Sept-98 July ’98 Test Beam Results Pedestal Noise Noise for high gain branch ~ 1.1 counts Corresponds to ~ 0.4 photoelectrons in PMT (17 MeV) SPICE simulation predicts 1.2 counts Noise for low gain branch ~0.5 counts SPICE simulation of 3-in-1 card predicts 0.3 counts Digital noise < ~ 0.4 counts
19
17-Sept-98 July ’98 Test Beam Results Muon response for the 3 sampling depths ( =90 ) Pedestal superimposed Using “signal” from empty events Width reflects energy algorithm as well as electronics –10 digitizations used for each measurement (not optimized) Muon signal well resolved from pedestal
20
17-Sept-98 July ’98 Test Beam Results Electron response Most energy in a single cell Channel-to-channel intercalibration less important Calibration not yet available 50 GeV and 100 GeV electrons
21
17-Sept-98 July ’98 Test Beam Results Use e - response to measure readout resolution Fit for a reflects readout resolution and energy algorithm
22
17-Sept-98 Energy resolution gives readout resolution of 0.5 counts/sample ADC quantization error noise ... Noise study gave 0.5 counts Well understood result Readout will not limit resolution of hadronic calorimeter July ’98 Test Beam Results
23
17-Sept-98 July ’98 Test Beam Results Pion energy resolution from test beam Under analysis Needs cell-to-cell intercalibration Electron shower largely contained in single cell
24
17-Sept-98 Future Planning Radiation hardness tests this fall Design review this fall Electronics PRR spring ’99 3-in-1 production to start spring ’99 Version 2 of digitizer to be demonstrated spring ’99 Final electronics needed for module calibration in ’00, ’01, ’02 Finish production of electronics in ’02 Before start of installation
25
17-Sept-98 Conclusions TileCal electronics shows good performance Achieved required dynamic range with linear system Very low system noise Electron energy resolution used to measure readout resolution First successful tests of “in-drawer” digitizers No unexpected problems so far Still a lot of work to do! Expect to start production on schedule
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.