Presentation is loading. Please wait.

Presentation is loading. Please wait.

Technology Budget 2014-2015 Presented to Technology Subcommittee and Facilities Subcommittee.

Similar presentations


Presentation on theme: "Technology Budget 2014-2015 Presented to Technology Subcommittee and Facilities Subcommittee."— Presentation transcript:

1 Technology Budget 2014-2015 Presented to Technology Subcommittee and Facilities Subcommittee

2 2014 Expenditures

3 2014-2015 Proposed Expenditures Firewall and Network Management – Purchase updated box with more capacity, flexibility and capabilities. Our current appliance will not keep up with the demand. BOND FUNDED $500,000 Content Filter and Virus Protection– Purchase larger box (more sophisticated) to accommodate more devices. Current device has failed. This is necessary for ERATE compliance. MICROSOFT VOUCHER GENERAL FUNDS $120,000 SPAM Filter – Purchase updated box to accommodate more devices. BOND FUNDED $125,000 Tablet carts (3 per site) - BOND FUNDED $4,120,000

4 2014-2015 Proposed Expenditures Voice over IP Phone System – Upgrade existing VoIP and provide all sites with the same communication system. Take advantage of current technology which will combine voicemail with email services. ERATE and GENERAL FUNDS $90,990 Fiber Build – Install 10 Gb fiber from all sites to Information Technology Center. Bandwidth will not need to be increased for years. ERATE and GENERAL FUNDS $183,700 Assessment System – Purchase a more robust and easy-to-use assessment system in order to make better data-driven decisions regarding our students. MICROSOFT VOUCHER GENERAL FUNDS $340,000 Teacher carts – Accommodate classroom increase due to class-size reduction. BOND FUNDED until FSY 2015. After this, GENERAL FUNDS $75,000 School2Home project at De Jean - Provide each student and teacher with a tablet and include LanSchool for management of all tablets. BOND FUNDED $348,000

5 2014-2015 Proposed Expenditures Provide mobile lab for Fred T. Korematsu Middle School. BOND FUNDED $21,105 Websites for district and schools. ERATE and GENERAL FUNDS $19,605 Upgrade air conditioning and power for MDF at Information Technology Center. FUND 40 $380,000 Upgrade power in MDF to support all district technology. BOND FUNDED $50,000 Core switches and fiber interconnects – Upgrade core switches at 26 of our sites. Current switches do not have the necessary speed and throughput capacity. BOND FUNDED $850,000 Virtualization and Wireless ERATE projects (2010-2011 carry-over). GENERAL FUNDS $350,000

6 2014-2015 Proposed Expenditures BOND GENERAL FUND/MICROSOFT VOUCHER FUND 40TOTAL $6,089,105$1,104,295$380,000$7,573,400


Download ppt "Technology Budget 2014-2015 Presented to Technology Subcommittee and Facilities Subcommittee."

Similar presentations


Ads by Google