Download presentation
Presentation is loading. Please wait.
Published byBlanche Emma Smith Modified over 9 years ago
1
Mirjam Kühne 1 RIPE 34, September 1999 Registration Services Report presented by Mirjam Kühne
2
RIPE 34 LIR-WGMirjam Kühne 2 1,5 New LIRs a Day
3
RIPE 34 LIR-WGMirjam Kühne 3 Requests per Category
4
RIPE 34 LIR-WGMirjam Kühne 4 Number of new requests in 1,452
5
RIPE 34 LIR-WGMirjam Kühne 5 Address Space Usage
6
RIPE 34 LIR-WGMirjam Kühne 6 Activity Plan 2000 Membership Services –RS –TTM
7
RIPE 34 LIR-WGMirjam Kühne 7 Staff & Workload New RS manager: Nurani Nimpuno Average response time 2-3 days Efficient procedures –no radical staff increase
8
RIPE 34 LIR-WGMirjam Kühne 8 IPv6 20 queries in total 10 address space requests 5 sub-TLAs allocated Smooth start Few open issues (IPv6-WG)
9
RIPE 34 LIR-WGMirjam Kühne 9 LIR Training Courses 13 courses delivered since last meeting 14 courses planned –Amsterdam (NL), Glasgow (UK), Moscow (RU), Bratislava (SK), Athens (GR), Strasbourg (FR), Munich (DE), Florence (IT), Ankara (TR), Stockholm (SE), Dublin (IE) New course material ready soon http://www.ripe.net/lir/courses/nextcourses.html
10
RIPE 34 LIR-WGMirjam Kühne 10 Number of Audits LIRs Audited Large 79 72 Medium 251 96 Small1112153 Total1442321
11
RIPE 34 LIR-WGMirjam Kühne 11 Type of Audits Total Large Medium Small new allocation 149 3745 67 extern. compl. 1 internal 8 2 5 1 infrequ. contact 78 3331 14 random 85 14 71
12
RIPE 34 LIR-WGMirjam Kühne 12 Number of Days Total Large Medium Small new allocation 14 2319 5.5 infrequent cont. 60 7068 28 random 9 18 7
13
RIPE 34 LIR-WGMirjam Kühne 13 Problem Areas Policies –no problems found: 224 –assignments over AW: 46 Procedures –DB object overlaps –DB inconcistencies missing status dangling reference
14
RIPE 34 LIR-WGMirjam Kühne 14 Policy Changes AW –temporarily lowered to /23 –no maximum size defined Allocation Size –no maximum size defined –based on individual needs admin-c in inetnum –on-site requirement dropped
15
RIPE 34 LIR-WGMirjam Kühne 15 Procedural Changes Proposal to accept requests for reverse delegation from members only –consistent with general procedures –improves relation between RIR and LIR –LIR contact needs to know address policies Proposal to change syntax of domain object –to allow registration of multiple zones
16
RIPE 34 LIR-WGMirjam Kühne 16 RIR coordination
17
Mirjam Kühne 17 RIPE 34, September 1999 Questions and Answers http://www.ripe.net/meetings/ripe/ripe-34pres/
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.