Federal Energy Regulatory Commission Item No. C- 3 KeySpan LNG & Algonquin Gas Transmission Pipeline June 30, 2005.

Similar presentations


Presentation on theme: "Federal Energy Regulatory Commission Item No. C- 3 KeySpan LNG & Algonquin Gas Transmission Pipeline June 30, 2005."— Presentation transcript:

1 Federal Energy Regulatory Commission Item No. C- 3 KeySpan LNG & Algonquin Gas Transmission Pipeline June 30, 2005

2 Material on this page is consider Non-Internet Public (NIP) You would like a copy of this slide, please contact: Public Reference Room Telephone: 202-502-8371 Toll-free 1-866-208-3676 Email: public.referenceroom@ferc.govpublic.referenceroom@ferc.gov

3 Item No. C- 3 List of Public Meetings. June 3, 2004: Scoping Meeting (Providence) June 3, 2004: Scoping Meeting (Providence) June 4, 2004: Publically-attended Site Inspection (KeySpan Facility) June 4, 2004: Publically-attended Site Inspection (KeySpan Facility) July 7, 2004: Scoping Meeting (Providence; Fields Point Area) July 7, 2004: Scoping Meeting (Providence; Fields Point Area) July 8, 2004: Scoping Meeting (Middletown) July 8, 2004: Scoping Meeting (Middletown) January 11, 2005: DEIS Comment Meeting (Providence; Fields Point Area) January 11, 2005: DEIS Comment Meeting (Providence; Fields Point Area) January 12, 2005: DEIS Comment Meeting (Middletown) January 12, 2005: DEIS Comment Meeting (Middletown)

4 Federal Energy Regulatory Commission Item No. C- 3 KeySpan LNG, L.P. 50 LNG tankers per year 375,000 Mcf per day into Algonquin’s proposed facilities up to 150,000 Mcf per day of vaporized LNG to New England Gas 20,000 Mcf per day from its truck loading

5 Item No. C- 3 KeySpan LNG, L.P. Current Federal Safety Standards Not Met LNG storage tank impoundment designed to 100 percent of the tank contents rather than 110 percent; thermal radiation & flammable vapor exclusion zones extend offsite onto adjacent properties; evaluation by a seismic consultant required to determine existing tank compliance with the 2001 edition of the NFPA, which increased the stringency and complexity of the seismic requirements.