1 Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR 19.09.2014

2 2 Comprehensive Explanation  Scope: Multi-N  Applicability area: AT / BA / BE / BG / CH / CZ / DE / DK / EE / ES / FI / FR / HR / HU / IE / IT / LU / LV / MAS / ME / NL / NO / PL / PT / RO / RS / SE / TR / UA / UK  Requirements: Implement in En-Route operations in selected ACCs, information exchange mechanisms, tools and procedures in support of Basic AMAN operations in adjacent and/or subjacent TMAs. ESSIP Plan 2014 / Objective ATC15

3 3 What is new or has changed for ESSIP Plan ed. 2014  Deletion of REG01 and REG02 SloAs ESSIP Plan 2014 / Objective ATC15

4 4 Link to European ATM Master Plan and/or Interim Deployment Programme (IDP) Eur. ATM Master Plan:  [TS-0305] - Arrival Management Extended to En Route Airspace IDP:  WP 5.2 ESSIP Plan 2014 / Objective ATC15

5 5 SLoA(s)  ASP01 – ‘Develop safety assessment for the changes’  ASP02 – ‘Adapt the ATC systems that will implement arrival management functionality (…)’  ASP03 – ‘Implement ATC procedures in En-Route airspace/sectors (…)’  ASP04 – ‘Train operational and technical staff and update Training Plans’  ASP05 – (AIS Providers) ‘Revise and publish Aeronautical Information documents’ ESSIP Plan 2014 / Objective ATC15

6 6 Finalisation Criteria and Closed Questions Follows from previous slide:  ASP01 – ASP03 – assessed, adapted and implemented, documented and in operational use.  ASP04 – The training plans have been updated and a training package has been developed by the ANSP. All concerned personnel have been trained.  ASP05 – AIS information is updated.  NSA conducts oversight of changes?  Safety assessment done by ASP and accepted by NSA?  Notification of acceptance received from NSA?  Information available in the AIP? ESSIP Plan 2014 / Objective ATC15

7 7 ESSIP Report 2014  It was a new objective in 2011.  By end of 2013, 6 ANSPs have implemented it; another 3 have partially completed the actions and 12 reported as planned within the objective FOC date (12/2017).  From the reported ANSP plans, the current estimate for achievement is 12/2017 for 80% of the applicable area. ESSIP Plan 2014 / Objective ATC15

8 8 Links and contacts  Objective Coordinator: Dell’Orto Luca, +32 2 729 3325 luca.dellorto@eurocontrol.int  EUROCONTROL Objective Expert(s): Paul Conroy +32 2 729 3580 paul.conroy@eurocontrol.intpaul.conroy@eurocontrol.int Predrag Terzioski, +32 2 729 3347 predrag.terzioski@eurocontrol.int ESSIP Plan 2014 / Objective ATC15