Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR 19.09.2014
2
2 Comprehensive Explanation Scope: Multi-N Applicability area: AT / BA / BE / BG / CH / CZ / DE / DK / EE / ES / FI / FR / HR / HU / IE / IT / LU / LV / MAS / ME / NL / NO / PL / PT / RO / RS / SE / TR / UA / UK Requirements: Implement in En-Route operations in selected ACCs, information exchange mechanisms, tools and procedures in support of Basic AMAN operations in adjacent and/or subjacent TMAs. ESSIP Plan 2014 / Objective ATC15
3
3 What is new or has changed for ESSIP Plan ed. 2014 Deletion of REG01 and REG02 SloAs ESSIP Plan 2014 / Objective ATC15
4
4 Link to European ATM Master Plan and/or Interim Deployment Programme (IDP) Eur. ATM Master Plan: [TS-0305] - Arrival Management Extended to En Route Airspace IDP: WP 5.2 ESSIP Plan 2014 / Objective ATC15
5
5 SLoA(s) ASP01 – ‘Develop safety assessment for the changes’ ASP02 – ‘Adapt the ATC systems that will implement arrival management functionality (…)’ ASP03 – ‘Implement ATC procedures in En-Route airspace/sectors (…)’ ASP04 – ‘Train operational and technical staff and update Training Plans’ ASP05 – (AIS Providers) ‘Revise and publish Aeronautical Information documents’ ESSIP Plan 2014 / Objective ATC15
6
6 Finalisation Criteria and Closed Questions Follows from previous slide: ASP01 – ASP03 – assessed, adapted and implemented, documented and in operational use. ASP04 – The training plans have been updated and a training package has been developed by the ANSP. All concerned personnel have been trained. ASP05 – AIS information is updated. NSA conducts oversight of changes? Safety assessment done by ASP and accepted by NSA? Notification of acceptance received from NSA? Information available in the AIP? ESSIP Plan 2014 / Objective ATC15
7
7 ESSIP Report 2014 It was a new objective in 2011. By end of 2013, 6 ANSPs have implemented it; another 3 have partially completed the actions and 12 reported as planned within the objective FOC date (12/2017). From the reported ANSP plans, the current estimate for achievement is 12/2017 for 80% of the applicable area. ESSIP Plan 2014 / Objective ATC15
8
8 Links and contacts Objective Coordinator: Dell’Orto Luca, +32 2 729 3325 luca.dellorto@eurocontrol.int EUROCONTROL Objective Expert(s): Paul Conroy +32 2 729 3580 paul.conroy@eurocontrol.intpaul.conroy@eurocontrol.int Predrag Terzioski, +32 2 729 3347 predrag.terzioski@eurocontrol.int ESSIP Plan 2014 / Objective ATC15