Download presentation
Presentation is loading. Please wait.
Published byAleesha Stanley Modified over 9 years ago
1
C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting
2
Introduction System design and implementation Calibration progress Problems with phase stability and beam motion Results from calibration 5/25/20152ATF2 Software meeting
3
Mover calibration Bump calibration Calibration Performed many quad mover calibration Single bump to calibrate QD10 to QD21X S-band system not yet done (reference cavity still missing) – Will be magnet mover based 5/25/20153ATF2 Software meeting
4
Hardware installation Schematic hardware installation Photographs of Hardware installation 5/25/20154ATF2 Software meeting
5
Software installation 5/25/2015ATF2 Software meeting5
6
MREF1X MREF3FF MREF2FF MREF1FF Reference problems Typically the reference cavity is downstream of the BPMs – Problematic when doing mover based calibration – Not been such a problem recently but difficult when line is poorly steered – Only currently using one reference (MREF1X) 5/25/20156ATF2 Software meeting
7
Trigger/clock stability 5/25/20157ATF2 Software meeting
8
Mover calibration example 5/25/20158ATF2 Software meeting
9
Beam bump calibration example 5/25/20159ATF2 Software meeting
10
Future work S-band soon – Reference integration before April beam? Fix trigger/clock problems – Install beam arrival diode – RF locking system Code upgrades – Saturation – Tone calibration – Environment monitoring (temperature, LO, cal-tone) 5/25/201510ATF2 Software meeting
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.