Presentation is loading. Please wait.

Presentation is loading. Please wait.

C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting.

Similar presentations


Presentation on theme: "C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting."— Presentation transcript:

1 C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting

2 Introduction System design and implementation Calibration progress Problems with phase stability and beam motion Results from calibration 5/25/20152ATF2 Software meeting

3 Mover calibration Bump calibration Calibration Performed many quad mover calibration Single bump to calibrate QD10 to QD21X S-band system not yet done (reference cavity still missing) – Will be magnet mover based 5/25/20153ATF2 Software meeting

4 Hardware installation Schematic hardware installation Photographs of Hardware installation 5/25/20154ATF2 Software meeting

5 Software installation 5/25/2015ATF2 Software meeting5

6 MREF1X MREF3FF MREF2FF MREF1FF Reference problems Typically the reference cavity is downstream of the BPMs – Problematic when doing mover based calibration – Not been such a problem recently but difficult when line is poorly steered – Only currently using one reference (MREF1X) 5/25/20156ATF2 Software meeting

7 Trigger/clock stability 5/25/20157ATF2 Software meeting

8 Mover calibration example 5/25/20158ATF2 Software meeting

9 Beam bump calibration example 5/25/20159ATF2 Software meeting

10 Future work S-band soon – Reference integration before April beam? Fix trigger/clock problems – Install beam arrival diode – RF locking system Code upgrades – Saturation – Tone calibration – Environment monitoring (temperature, LO, cal-tone) 5/25/201510ATF2 Software meeting


Download ppt "C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting."

Similar presentations


Ads by Google