Shepard Energy Centre
2
Environmental Stewardship
3
Overview Nominal 800 MW Natural Gas Combined Cycle Early 2011 Received Regulatory Approval (Alberta Utilities Commission and Alberta Environment and Sustainable Resource Development) Cost: Approximately 1.35 Billion Joint Venture with Capital Power Currently under construction COD: Early 2015
4
4 Technology Video Natural Gas Combined Cycle 2 on 1 Mitsubishi 501G gas turbine
5
Environmental Attributes - Low Air Emissions GHG – Less that 0.4 tonnes/MWh (less than half of the emissions from Coal) SOx – Virtually none NOx – Shepard will only emit between 3 ppm and 6 ppm PM – virtually none Mercury – No mercury emissions We did extensive air dispersion modeling and Shepard has minimal impact on air quality in the region.
6
Environmental Attributes - Water Consumption Plant MWML/yML/MWComment Keephills7661600020.9Inefficient Battle River66360199.1More efficient Shepard80037964.7Very efficient due to plant design and uses reclaimed water
7
Shepard Site Photos – April 2013 Aerial View Looking South
8
Shepard Site Photos – April 2013 Fiberglass Cooling Tower Showing End Wall And Louver Installation
9
Shepard Site Photos – April 2013 HRSG #2 Finger Rack Area
10
Shepard Site Photos – April 2013 Combustion Turbine #1
11
Shepard Site Photos – April 2013 Low Pressure Steam Turbine Rotor Insertion