Presentation is loading. Please wait.

Presentation is loading. Please wait.

University of Southern California Center for Systems and Software Engineering February 13, 2007©USC-CSSE1 Acquisition and Contracting Mismatches Barry.

Similar presentations


Presentation on theme: "University of Southern California Center for Systems and Software Engineering February 13, 2007©USC-CSSE1 Acquisition and Contracting Mismatches Barry."— Presentation transcript:

1 University of Southern California Center for Systems and Software Engineering February 13, 2007©USC-CSSE1 Acquisition and Contracting Mismatches Barry Boehm, Roberta Gleiter, Gary Hafen, DeWitt Latimer, Rich Turner Gary Thomas, Glenn Berg

2 University of Southern California Center for Systems and Software Engineering February 13, 2007©USC-CSSE2 Research Project Ideas A.Taxonomy of software project contract efforts B.Study of successful contracts to find commonalities in software projects C.Top acquisition risk list (acquirer/contractor point of views) D.Inventory current acquisition practices on acquirer and contractor sides E.Map risks to practices to determine coverage and gaps in practice F.Quantify the impact/cost of the turn-over of acquisition personnel G.Look at acquisition risks – do a risk model of what we learn. H.Develop fault tree analysis of to know the probability of success of the program at a given point I.Tool that help you quantify s/w (or system) opportunities and risks over time and impact of missing these J.Do something like “100 Questions for Technical Review” for software intensive systems acquisition K.How often do our acquisition re-use based assumptions work out? L.Is amount of code a part of complexity for acquisition? M.Macro risk project tool – evolve and pilot N.How would an acquisition organization write an acquisition strategy for a development based on MBASE and incremental commitment Blue – High Value/High DifficultyGreen – High Value/Low Difficulty

3 University of Southern California Center for Systems and Software Engineering February 13, 2007©USC-CSSE3 s1 C A M E D K L B G N J F H I

4 University of Southern California Center for Systems and Software Engineering February 13, 2007©USC-CSSE4 Transition Projects MBASE to a standard format (for injection into standards bodies) Write a standard around the Incremental Commitment Model


Download ppt "University of Southern California Center for Systems and Software Engineering February 13, 2007©USC-CSSE1 Acquisition and Contracting Mismatches Barry."

Similar presentations


Ads by Google