From Business Case Planning to Benefit Reality – An Industry Perspective Walter Levesque Vice President, Sales Hunt Technologies, Inc.

Similar presentations


Presentation on theme: "From Business Case Planning to Benefit Reality – An Industry Perspective Walter Levesque Vice President, Sales Hunt Technologies, Inc."— Presentation transcript:

1 From Business Case Planning to Benefit Reality – An Industry Perspective Walter Levesque Vice President, Sales Hunt Technologies, Inc.

2 Founded in 1985 as a research company 1994 Patented Ultra Narrow Bandwidth (UNB) Technology Located in Pequot Lakes, MN 130+ employees 430+ customers 3,000,000+ endpoints Hunt Technologies, Inc.

3

4 Substation Two-Way Communication Always On ™ Each endpoint broadcasts information independently Near Real Time Downstream UNB Upstream

5 Primary Business Case Reasons for AMR Based on Information from Chartwell and Howard Scott Prepared: June 2002

6 Emerging Benefits of AMR Based on Information from Chartwell and Howard Scott Prepared: June 2002

7 Important Deliverables Meter Reading Time-of-Use Demand – system wide Load Profiles Multi-Utility Monitoring Outage Detection Power Restoration Distribution Operations Preventive Maintenance Load/Transformer Balancing Power Quality Reduce Line Loss Control Load Control Remote Disconnect Remote Reconnect

8 Consumption Profiles 5 minute intervals aggregated into 15 minute intervals 15 minute intervals directed into rate periods Support of four rate periods Time synchronized to National Standard

9 Consumption Profiles 12:00am 6:00 7:00 8:00 9:00 12:00pm 6:00 7:00 8:00 9:00 11:59pm OFF PEAK SHOULDERPEAK $.04$.07$.13 5 2 4

10 Important Deliverables Meter Reading Time-of-Use Demand – system wide Load Profiles Multi-Utility Monitoring Outage Detection Power Restoration Control Load Control Remote Disconnect Remote Reconnect Distribution Operations Preventive Maintenance Load/Transformer Balancing Power Quality Reduce Line Loss

11 End Point Information System Power Quality –Line Loss –Transformer Balancing & Sizing –Phase Loading & Identification –Preventative Maintenance S/N 12412 S/N 12357 S/N 12342 S/N 12323 S/N 6783 S/N 12430 S/N 12380 S/N 12452 S/N 6714 S/N 12306 S/N 12370

12 Remote Administration Command Messaging -Demand reset -Load Control with validation -Service disconnect/reconnect with validation -Final read Reprogram the Endpoint -Reconfigure packet type and structure -Asynchronous command to interrupt or direct consumption profile to appropriate rate period

13 Benefits of Rapid Deployment –Improve project ROI –Reduce operational expenses –Additional data for effective/efficient engineering


Download ppt "From Business Case Planning to Benefit Reality – An Industry Perspective Walter Levesque Vice President, Sales Hunt Technologies, Inc."