PSSC Space Instrument Laboratory Plasma instrument calibration system provides an ion beam of energy range up to 130keV/charge in a clean room To develop new space plasma instruments in PSSC To offer calibration facility to other institutes’ instruments for upcoming missions. E.g. ERG and SCOPE
2
OverviewOverview To obtain the relationship between count rate and particle distribution function, the instrument response to known beam energy and incident angle is measured beam area (>50 cm 2 ), energy range (~130 keV)
4
Ion source Ionization of neutral gas by electron impact Ions are collimated and accelerated (~10keV) by electrostatic lenses. Electron gun Ion trajectory simulation Blue line: Ion trajectory, mass=1, Red, green line: Potential contour Ring electrodes: 8000V ~ 0
5
Mass spectrometer Mass separation is done by a crossed electric field and magnetic field (ExB) in a 90 deg. cylindrical configuration (R=120 mm, gap 6 mm). +V -V B Ion trajectory simulation Green line: Mass 32, Blue line: Mass 28 V=+/-21 V, B=0.3T, Initial acceleration: 3kV Permanent magnets of 0.1 T and 0.3 T are selected depending on particle mass range.
6
Beam expander AC voltages (~1 kHz, ~200V) applied to deflectors scan the beam Decelerated by mesh electrodes. Ring electrodes collimate to a parallel beam. Ground 2.5kVBeam 3keV Deflector AC +/-200V
7
Beam accelerator 64 ring shaped electrodes connected via resisters are set in the insulated tube to form a uniform field. Ions are accelerated in an insulated tube by a potential drop (~130kV) between the beam expander and the drift tube.
8
Ion trajectory simulation Green line: Mass 32, Blue line: Mass 28 V=+/-21 V, B=0.3T, Initial acceleration: 3kV, Main acceleration 130kV
9
Beam profile monitor A movable 64 channel Faraday cup array (1 mm diameter, 8 mm depth, 2 mm spacing) is installed in front of the main chamber to monitor beam current and profile.
10
3 axis turntable
11
System Control Diagram
12
SummarySummary We have established a laboratory equipped with a UHV vacuum chamber. Equipment such as HV power supplies, HV transformer and power-supply controllers are ready for installation. All the components of the beam line are manufactured and assembled. 3-axis turntable is installed. Future work Integrate and test the control software Components test Clean room extension
13
Vacuum chamber Main experiment chamber – 100 cm diameter x 150 cm –3 x 10 -7 Torr 3-axis turntable to control instrument position and beam angle will be placed within.
14
System Control Diagram turnt able contr oller Mats usad a HVPS VME busNIM amp. (slot) count er discri. chamber particle instrume nt turntable I/F Spell man HVPS isol ati on ion source ion bea m WL AN Farad ay Cup display Ion source control window Faraday- cup window HV/turntabl e/data window PC LabVi ew US B RS4 22 VM E I/F GPI B WL AN DA C
15
Rikkyo Univ. clean room Class 10000
17
Beam profile monitor in Rikkyo’s system –MCP and weadge and strip anode
18
Newly constructed laminar flow clean room