Download presentation
Presentation is loading. Please wait.
1
HUB CAMPUS NETWORK INFRASTRUCTURE UPGRADE
2
FIBER/ROUTER BACKBONE Rust-GSB-Education Bldg Multi- and Single-Mode
3
UAB Internet LILITHs (inbound SMTP gateways) Network Monitors (Snort,IPaudit,etc.) POS OC3 = 155 Mb/s 90 Mb/s contracted 100 Mb/s GigaBit Border Services (DNS, DPO, @uab.edu, etc.) PacketShaper CURRENT COMMODITY INTERNET CONNECTIVITY
4
UAB Internet LILITHs (inbound SMTP gateways) Network Monitors (Snort,IPaudit,etc.) POS OC3 = 155 Mb/s 100+ Mb/s contracted 100 Mb/s GigaBit Border Services (DNS, DPO, @uab.edu, etc.) PacketShaper PLANNED COMMODITY INTERNET CONNECTIVITY
5
UAB GCG Network Monitors (Snort,IPaudit,etc.) 100 Mb/s GigaBit SOXInternet2 OC3 ATM 155 Mb/s OC12 ATM 622 Mb/s Also carries AREN + IITS 2xOC3 ATM 310 Mb/s OC48- OC192 2.5 - 10 Gb/s CURRENT INTERNET2 CONNECTIVITY
6
GCG Network Monitors (Snort,IPaudit,etc.) 100 Mb/s GigaBit SOXInternet2 OC3 ATM 155 Mb/s OC12 ATM 622 Mb/s Also carries AREN + IITS 2xOC3 ATM 310 Mb/s OC48- OC192 2.5 - 10 Gb/s UAB PLANNED INTERNET2 CONNECTIVITY
7
AREN BACKBONE GCG http://www.asc.edu/
8
ABILENE / I2 BACKBONE http://abilene.internet2.edu/
10
CURRENT FIBER CONNECTIONS THE NEXT “WAVE”: DWDM Dense Wave Division Multiplexing OC192 – 10Gb/s 40x 10Gb/s Channels!!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.