Download presentation
Presentation is loading. Please wait.
1
Get Detailed with SAP Expense Planning Wayne Kirkendall Session Code 1610 GB Enterprises
2
Overview of Alpha Agenda Configuring and Using Personnel Cost Planning Cost Center/Cost Element Planning Configuration GuiXT Components Cost Center/Resource Planning Manager Training/Acceptance iTutor of PCP Our Business Requirments for Expense Planning
3
Alpha Overview Alpha Technologies was founded in 1976 to provide power supplies to the cable industry. These products, which still comprise a significant portion of Alpha's total business, provide critical power conditioning and emergency backup to cable television delivery networks. Rapid growth in global communications, and the critical connection between system power and overall network reliability, created a strong demand for Alpha's products across a wide array of communication applications. Today, Alpha Technologies is a leading supplier of power systems to the broadband communications industry. Alpha’s customer base includes major cable television system operators, telecommunication service providers, as well as some of the most progressive full-service communication providers. For more information go to www.alpha.com
4
Overview of Alpha Agenda Configuring and Using Personnel Cost Planning Cost Center/Cost Element Planning Configuration GuiXT Components Cost Center/Resource Planning Manager Training/Acceptance iTutor of PCP Our Business Requirments for Expense Planning
5
Expense Planning Requirements Eliminate in house Access Database system Leverage Central SAP database Reduce budgeting manager’s consolidation time Leverage in process employee master project Get away from centrally loading and managing spreadsheets or database extracts
6
Expense Planning Requirements Plan Certain Expenses by employee Initial Planning Requirements Personnel Costs: Salary/Wages, Taxes, Bonuses, Commissions Employee Related: Travel, Employee Development What we ended up doing Planned Personnel Costs by Position in PCP and transferred to CO Planned Employee Related Costs in CO
7
Final CO Reports
8
Overview of Alpha Agenda Configuring and Using Personnel Cost Planning Cost Center/Cost Element Planning Configuration GuiXT Components Cost Center/Resource Planning Manager Training/Acceptance iTutor of PCP Our Business Requirments for Expense Planning
9
General CO Versions
10
CO HR Planning Connection
11
Click to add text CO HR Planning Connection
12
Personnel Cost Planning IMG
13
Configuration Wizard
14
Integrate with Accounting?
15
Set Plan Source
16
Default Values
17
Evaluation Path
18
Employees/ Required Positions
19
Calculation Parameters
20
Authorization Check
21
Excel Integration
22
Completion Check
23
Table View of PCP Config
24
Wage Types
26
Wage Types Percentages
27
Wage Type Groupings
28
Effect of Percentage Wage Types
29
PCP Data Flow to CO 1) Data planned on a position level in infotype 1015 2) PCP Scenario Groups Created/Modified 3) Administration tool sends Scenario to Cost Centers Sales Manager CSRSales Rep Admin Sales Plan Scenario 1 SalesAdmin
30
PO13 – Maintain Position
31
PO13 – Change Cost Planning
32
Creating PCP Scenario Groups Projected Pay Payroll Results Basic Pay Actual Results Requires SAP HR Payroll Based on Infotypes 1015 & 1011 Based on Infotype 0008
33
Click to add text PP28 – Projected Pay Planning Basis
34
Assign Costs to Cost Objects
35
Assign Cost Object to Cost Center
37
Scenario Structure Plan Version – HR Plan Version not CO Plan Version Scenario Overall bucket that holds 1 or many scenario groups Scenario Group – Structure that contains the planned values
38
Release and Transfer to CO PP27 – Release Plan Scenario PP2U – Save/Cancel Plan Scenario
39
PCP Scenario Group Report
40
Overview of Alpha Agenda Configuring and Using Personnel Cost Planning Cost Center/Cost Element Planning Configuration GuiXT Components Cost Center/Resource Planning Manager Training/Acceptance iTutor of PCP Our Business Requirments for Expense Planning
41
KP65 – Create Planning Layout … One Entry Field Several Informational Fields Month Break Down Prior Year Plan Prior Year Actuals
42
Define Planner Profiles
43
Assign Planning Layout to Planner Profile
44
Assign Default Parameters
45
Integrated Excel Planning Layout
46
KP06 – Cost Center/Cost Element Planning
47
KP06 – Data Entry Screen GuiXT additons
48
Detailed Plan Entry Screen GuiXT additons
49
Detailed Distribution Screen GuiXT additons
50
Detail Expense Reporting No standard report for displaying detailed cost items Can be done in either ABAP query or Standard ABAP No direct link between detail planned item and actual posting
51
What I wanted to do… …was combine all three into one screen. Overall Cost Center Plan Detail Items Detail Item Distribution Need Input Assistant…More $$$
52
Script Files GuiXT Basics Components GuiXT – Included Input Assistant – $$$ Designer – $$$ Viewer – $$$ Storage Deployment
53
Script Files GuiXT Basics Components Storage Deployment Text File with GuiXT Syntax Manually written Generated with Designer
54
Script Files GuiXT Basics Components Storage Deployment Network SAP Web Repository Individual PC http://updates.guixt.com/docu/Webhelp/GuiXT_Pro file/doc_sapwr.html
55
Script Files GuiXT Basics Components Storage Deployment GuiXT.EXE GuiXT.INI Possible Registry Settings
56
Overview of Alpha Agenda Configuring and Using Personnel Cost Planning Cost Center/Cost Element Planning Configuration GuiXT Components Cost Center/Resource Planning Manager Training/Acceptance iTutor of PCP Our Business Requirments for Expense Planning
57
Resource Planning Provides quanity planning for cost elements Allows for standard rates to be set by planners Does not allow actual postings Allows for unique breakdown/rollup of cost elements
58
Setup master data item for resource Resource Planning Steps Assign to one specific Cost Element or Allow assignment to any Cost Element Assign Rates to Resources KP06: Extras -> Resource Planning -> Maintain Prices Planner profile:SAPR&R or create your own Plan Cost Center/Resource/Cost Element KP06 Planner profile:SAPR&R or create your own Need to have Access sequences and condition type defined in configuration
59
KPR2 – Create Resource Master Data Required Fields: Resource Validity Dates Resource Unit Name Optional Fields: Cost Element Plant Material Base Planning Object
60
KP06 – Plan resources / Set Prices
61
Set Resource Prices
62
KP06 – Plan resources / Set Prices
63
CO Planning Long Text Reporting Program Name: COOMDISPLAYPTEXTS
64
Overview of Alpha Agenda Configuring and Using Personnel Cost Planning Cost Center/Cost Element Planning Configuration GuiXT Components Cost Center/Resource Planning Manager Training/Acceptance iTutor of PCP Our Business Requirments for Expense Planning
65
Demostration of PCP via iTutor Manager Training/Acceptance Survey “It’s Excel, but it’s not Excel” Somewhat combersome Fragmented procedures
66
Thank you for attending! Please remember to complete and return your evaluation form following this session. Session Code: 1610
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.