V. Carassiti - Princeton (USA) 9-13/01/2003 1 BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING
2
V. Carassiti - Princeton (USA) 9-13/01/2003 2 DETECTOR LAYOUT EXPLODED
3
V. Carassiti - Princeton (USA) 9-13/01/2003 3 DETECTOR LAYOUT ASSEMBLED
4
V. Carassiti - Princeton (USA) 9-13/01/2003 4 IAROCCI TUBE TUBE MATERIAL : NORYL OR PVC THE TUBE IS NOT SELF SUPPORTING
5
V. Carassiti - Princeton (USA) 9-13/01/2003 5 RIB RIB MATERIAL : STEEL NUMBER OF RIBS : TO BE OPTIMIZED DEPENDING ON DETECTOR’S EFFICIENCY AND STIFFNESS REQUIRED ASSUMING A RIB OF 1 MM THICK FOR EACH TUBE, THE TOTAL LENGTH NEEDED IS ABOUT 8000 m; THE CORRESPONDING WEIGHT IS 1260 Kg AND THE COST = 3.6*1260 = 4536 € (20% VAT INCLUDED)
6
V. Carassiti - Princeton (USA) 9-13/01/2003 6 DETECTOR’S STIFFNESS THE HELP OF THE RIBS
7
V. Carassiti - Princeton (USA) 9-13/01/2003 7 GLUEING – PHASE 1 THE RIB IS GLUED ON THE TUBE’S SIDE
8
V. Carassiti - Princeton (USA) 9-13/01/2003 8 GLUEING – PHASE 2 THE DETECTOR’S MODULE IS ASSEMBLED
9
V. Carassiti - Princeton (USA) 9-13/01/2003 9 GLUEING – PHASE 3 STRIPS, GROUND, SIGNAL PCB AND INSULATOR FOILS ARE ASSEMBLED THE TOTAL THICKNESS IS ABOUT 1 MM
10
V. Carassiti - Princeton (USA) 9-13/01/2003 10 GLUEING – PHASE 4 STRIPS, GROUND, SIGNAL PCB AND INSULATOR FOILS ARE GLUED ON THE TUBES
11
V. Carassiti - Princeton (USA) 9-13/01/2003 11 DETECTOR’S VERTICAL STIFFNESS
12
V. Carassiti - Princeton (USA) 9-13/01/2003 12 MOUNTING AND DISMOUNTING THE DETECTOR THE STRIPS FOIL GOES IN TO THE GAP (SLIDE 13); A PROPER TOOLING KEEPS IT IN SHAPE AND PLACE THE MODULES OF THE DETECTOR ARE INSERTED ONE BY ONE FROM THE BOTTOM TO THE TOP, THE NEXT SLIDING ON THE PREVIOUS ONE (SLIDES 14, 15) EACH MODULE CAN BE HELD ON BOTH EDGES, WHICH ALLOWS THE LIFTING AND THE ADJUSTMENT. WHEN THE CORNER PIECES ARE MOUNTED THE DETECTOR DISASSEMBLY IS STILL POSSIBLE AFTER THE CENTER PIECES REMOVAL (SLIDE 16); THE PROCEDURE IS THE FOLLOWING: 1) LIFTING THE UPPER MODULES 2) EXTRACT THE CENTRAL MODULES 3) IN THE MIDDLE OF THE GAP THERE’S THE SPACE TO LOWER OR LIFT THE OTHER MODULES.AND REMOVE THEM. THE OPERATION OF ASSEMBLY AND DISASSEMBLY NEED A TOOLING, HOLDING AND HANDLING THE MODULES OF THE DETECTOR.
13
V. Carassiti - Princeton (USA) 9-13/01/2003 13 INSERTING THE STRIP FOIL THE STRIP FOIL SLIDES INTO THE GAP A TOOLING HOLDING AND MOVING THE FOIL IS NEEDED
14
V. Carassiti - Princeton (USA) 9-13/01/2003 14 INSERTING THE DETECTOR - 1
15
V. Carassiti - Princeton (USA) 9-13/01/2003 15 INSERTING THE DETECTOR - 2
16
V. Carassiti - Princeton (USA) 9-13/01/2003 16 EXTRACTING THE DETECTOR
17
V. Carassiti - Princeton (USA) 9-13/01/2003 17 THE LAYER IN PLACE