Download presentation
Presentation is loading. Please wait.
1
ΑΝΝΕΧ 1-B by EK
2
Project Management EU Administration PC UGDIE6 Management PM EK (SCIRO) WP-Leaders (D3 – D13) Task Leaders WP1 Needs SCIRO WP2WP3WP4WP5 FR NTUA Tools NTUA Protot. IVU Test TRENIT 8 D12/13 Evaluation D1 Quality Plan D16 Final Report 7 D2 Proj. Pres. D14 DUP D15 Impl. Plan
3
Project Management + Control SCIRO Proj.Manag. D 1: Qu. Plan 8 SCIRO1 Needs D 3: needs 2NTUA FR + Archit. D 4 FR D 5 Syst.A. 3NTUA Developm. D 6: tool D 7-9 45IVUTRENIT Integration D 10: Prototyp Test + Verif. D 11: Plan + Res. 6 7 UGDIE SCIRO Assess.+ Eval. D 12: Ev. Plan D 13: Fin. Results Diss.+ Impl. RUG D 14 DUPlan D 15: Intern. Expl. validateinputfollow up Scientific Coordination Evaluat. Plan Evaluat. Results RUG performance Comparison (WP 1 /WP 4) exploitation, PR etc. partner / consortium achievements, standards ?
4
WP_Structure Intern. Exp. 15/10/01
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.