Download presentation
Presentation is loading. Please wait.
1
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2010 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie 2, Complexe Desjardins, tour Est 9ième étage C.P. 10000 Montréal, QC H5B 1H7
2
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie2 SC B5- STRATEGIC ACTIVITIES New or Improved concepts of SAS New or Improved concepts of SAS Network of the future and Distributed generation Network of the future and Distributed generation New System Integrity Protection Schemes to improve network stability (Load Shedding/Restoration/SPS) New System Integrity Protection Schemes to improve network stability (Load Shedding/Restoration/SPS) Requirements from users Requirements from users Process Bus (architecture, reliability, transients and testing) Process Bus (architecture, reliability, transients and testing) New approaches, tools and system to eliminate human errors New approaches, tools and system to eliminate human errors
3
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie3 SC B5- NETWORK OF THE FUTURE The network of the future will give rise to significant challenges for the protection and automation systems. The network of the future will give rise to significant challenges for the protection and automation systems. Significantly enhanced complexity (intelligence) for automation, control, operation and metering will be necessary Significantly enhanced complexity (intelligence) for automation, control, operation and metering will be necessary Higher levels of reliability and flexibility from protection Higher levels of reliability and flexibility from protection
4
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie4 SC B5- Main Challenges New Wide area Protection concepts for Transmission networks. New Wide area Protection concepts for Transmission networks. Protection coordination & Standardization of schemes Protection coordination & Standardization of schemes Communication in 61850 between substations (interoperability) Communication in 61850 between substations (interoperability) Consideration of Cyber Security Constraints Consideration of Cyber Security Constraints
5
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie5 SC B5- Main Challenges Data management innovative applications. Data management innovative applications. New systems and procedures will be required to cope with huge amount of data. New systems and procedures will be required to cope with huge amount of data. New data modeling standard should be developed at network level. New data modeling standard should be developed at network level. Non-real time applications will be developed for engineering, automated disturbance data analysis, monitoring and maintenance for transmission and distribution networks Non-real time applications will be developed for engineering, automated disturbance data analysis, monitoring and maintenance for transmission and distribution networks
6
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie6 SC B5 Advisory Group Membership AG51 V. Leitoff (FR)AG52 S. Chano (CA) AG53 R. Adams (UK) AG54 I. Mesmaeker (CH) Substation Automation and Remote Control Protection & Monitoring of Main Plant and Circuits Monitoring, Metering, Recording and Overall Power System Protection Tutorials
7
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie7 AG B5-51 Substation Automation and Remote Control WG B5-38: Impact of security requirements D. Holstein (US) Finished WG B5-36: Applications for protection schemes based on 61850 D. Tholomier (FR) 2010 WG B5-06: Maintenance strategies for SAS V. Leitloff (FR) Finished WG B5-31: Management of protection settings P. Crossley (UK) 2010 WG B5-12: Engineering guidelines for IEC61850 based systems J. Castellanos (ES) 2010 WG B5-39: Documentation requirements from design to operation to maintenance of DSAS R. Hughes (AU) 2013
8
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie8 AG B5-52 Protection & Monitoring of Main Plant and Circuits WG B5-05: Transformer protection, monitoring & control M. Sachdev (CA) Finished WG B5-37: Protection, control & monitoring of shunt reactors. S. Roxenborg (SE) 2012 WG B5-04: Tech‘s for protection & monitoring generator plant G. Benmouyal (CA) Finished WG B5-07: Tech‘s for protection & monitoring transmission lines S. Chano (CA) Finished WG B5/B4-25: Impact of HVDC on protection of AC systems X. Zhao(CH) 2012 WG B5-24: Protection requirements on transient response of voltage and current acquisition chain J. Jakonjsek (RU) 2013 WG B5-40: Education, Qualification and professional develop. of engineers in protection and control M. Kezunovic (US) 2013 WG B5-23: Protection of composite lines Luc Uyttersprot (BE) 2012
9
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie9 AG B5-53 Monitoring, metering, recording & overall System Prot. AG B5-53 Monitoring, metering, recording & overall System Prot. WG B5-21: New local P&C approaches to minimise impact of system disturbances A H. Abu Bakar (MY) 2011 WG B5-14: WA P & C Technologies V Terzija (UK) 2012 WG B5-41: Investigation of possibilities to improve metering systems for billing purposes in substations H. Lenting (NL) 2013
10
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie10 NEWLY FORMED WG SC B5: Four new Working Groups B5.42 Experience concerning availability and reliability of DSAS B5.42 Experience concerning availability and reliability of DSAS B5.43 Coordination of protection and control of future network B5.43 Coordination of protection and control of future network B5.44 Protection Schemes for Special Transformers B5.44 Protection Schemes for Special Transformers B5.45 Acceptance, Commissioning and Field Testing Techniques for Protection and Automation B5.45 Acceptance, Commissioning and Field Testing Techniques for Protection and Automation
11
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie11 PREFERENTIAL SUBJECTS (2011) PS1- IEC 61850: Which tools for which user PS1- IEC 61850: Which tools for which user PS2- Protection of Hybrid Line/Cable Circuits PS2- Protection of Hybrid Line/Cable Circuits PS3- Performance of Protection Systems Whilst the Network is under Stress PS3- Performance of Protection Systems Whilst the Network is under Stress
12
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie12 PREFERENTIAL SUBJECTS (2012) PS1- Coordination of protection and control for the network of the future PS1- Coordination of protection and control for the network of the future PS2- Use of remote access for protection and automation systems-Application and developments PS2- Use of remote access for protection and automation systems-Application and developments
13
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie13 TUTORIAL SUBJECT FOR 2011 MAINTENANCE OF IEC 61850 SYSTEMS MAINTENANCE OF IEC 61850 SYSTEMS
14
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie14 Canadian participation-2010 Leadership roles Leadership roles –Simon Chano (HQ) B5 Canadian Representative B5 Canadian Representative B5-52 Advisory group convenor B5-52 Advisory group convenor Convenor WG B5-07 Convenor WG B5-07 B5-23 WG member B5-23 WG member Corresponding member WG B5-19 Corresponding member WG B5-19 Corresponding member B5-05 Corresponding member B5-05 –Gabriel Benmouyal (SEL) Convenor WG B5-04 Convenor WG B5-04
15
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie15 Canadian participation Leadership roles Leadership roles –Mohindar S. Sachdev (U of Saskatchewan) Convenor WG B5-05 Convenor WG B5-05 Member WG B5-07 Member WG B5-07 –Brian Sparling Corresponding Member WG B5-05 Corresponding Member WG B5-05
16
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie16 Canadian participation Bogdan Kasztenny (SEL Inc.) Bogdan Kasztenny (SEL Inc.) Member WG B5-12 Member WG B5-12 –John Ciufo ( Hydro One) Member WG B5-14 Member WG B5-14 –Ioni T. Fernando (Manitoba Hydro) Member WG B5-25 Member WG B5-25 –F Rahmatian (Quanta Technology Canada ULC) Member WG B5-40 Member WG B5-40 –S Tang (BC Hydro) Member WG B5-41 Member WG B5-41
17
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie17 Concluding Remarks Study committee actively examines protection and automation issues Study committee actively examines protection and automation issues Discusses the issues and provides reports on those issues Discusses the issues and provides reports on those issues Promotes power engineering education Promotes power engineering education Conducts tutorials at the SC meetings Conducts tutorials at the SC meetings B5 tries to get participation from utility engineers, consultants and academia B5 tries to get participation from utility engineers, consultants and academia
18
2010 - 10 -19 Simon R. Chano, Hydro Québec TransÉnergie18 http://www.cigre-b5.org Web site SC address : web site is SC address : web site is Pour information additionnelle /For additional information, me contacter / you can contact me: Chano.simon@hydro.qc.ca Pour information additionnelle /For additional information, me contacter / you can contact me: Chano.simon@hydro.qc.ca Chano.simon@hydro.qc.ca
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.