Status of SICB and Monte Carlo productions Eric van Herwijnen Friday, 2 march 2001.

Similar presentations


Presentation on theme: "Status of SICB and Monte Carlo productions Eric van Herwijnen Friday, 2 march 2001."— Presentation transcript:

1 Status of SICB and Monte Carlo productions Eric van Herwijnen Friday, 2 march 2001

2 Overview  SICb status and versions  Monte Carlo productions, past (since last LHCb week), current and future

3

4 Status Muon TDR Sicbmc v240r1, Al beampipe and Al-Be beampipe

5 Status Trigger TDR Sicbdst v233r1

6 Higgs  Sicbmc v233r2, sicbdst v235r3 dbase v229r2  20k requested, 14k done

7 Liverpool  Nothing since last LHCb week, some feedback from users

8 Lyon  Preparation for bb-bar inclusive production, no cuts  automated submission and transfer installed  insufficient time to create 500 RAWH mbias, bb- bar inclusive and DST2 events  run separate jobs (bookkeeping) or smaller samples?  use the same model at RAL with globusrun

9 RAL  NT farm R.I.P  On RAL Linux: bb-bar inclusive production, no cuts

10 CERN  completion of Trigger TDR  Physics channels  Erica Polycarpo B -> mu + X; Bbar -> mu + X


Download ppt "Status of SICB and Monte Carlo productions Eric van Herwijnen Friday, 2 march 2001."