Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer
3
Project Location 13 th and Hulman Streets Terre Haute, IN
4
History of Property Opened in 1916 as Indiana Coke and Gas Company Closed in 1988 Known contaminants include: benzene, toluene, ethylbenzene, xylene, and polyaromatic hydrocarbons January 1940
5
Design Requirements Brownfield considerations Environmental remediation Commercial and industrial use Hulman and 13 th Street improvements Railroad access to site Location of detention pond
6
Site Map
7
Project Approach Site Assessment Phase II Review & GIS Mapping Remediation Plans Development Scenarios
8
Progress to Date Development Envelope Topographic Survey Low Impact Development (LID) Codes and Regulations Subsurface Conditions Begin Phase II Review Int. of 13 th Street and Lockport Road September 2004
9
Development Envelope Availability and location of utilities Floodplains, wetlands and underground mines Right-of-way Zoning restrictions Soil contamination Holey Moley 800-382-5544
10
Topographic Survey Rough topographic survey completed Obtained complete survey performed by American Consulting Inc. Compared two surveys to ensure accuracy
11
Topographic Survey
12
Low Impact Development Bioretention considerations Vegetated swales Pervious pavements Cisterns Cost analysis
13
Codes & Regulations Risk Integrated System of Closure (RISC) document Federal contamination guidelines for ground water Design Standards and Specifications Terre Haute and Indiana Department of Transportation
14
Subsurface Conditions Preliminary geological investigation Compared with soil borings from Trinity Environmental Group and ATC investigations Limitations for development Intersection of 13 th and Hulman Streets September 2004
15
Future Direction Finish Phase II review & GIS mapping IDEM response letter & proposed additional testing Remediation plans Potential development scenarios
16
Phase II Review & GIS Mapping Soil borings and analytical testing Location of contaminants Contamination density mapping (GIS) Brownfield research Federal, state, and local development requirements Grant availability
17
IDEM Response Letter & Proposed Additional Testing Inadequacies of initial testing What tests need to be conducted again? What tests have never completed that are needed? How much extra will this cost?
18
Remediation Plans Specific areas or entire site Closure levels Worst-case scenario Plan based on current contaminant knowledge Cost analysis of two options
19
Potential Development Scenarios Site layout Phasing of project Roadway design Phase I Phase II Phase III Phase IV
20
Timeline TASKSEPTEMBEROCTOBERNOVEMBERDECEMBERJANUARYFEBRUARYMARCHAPRIL Site Assessment Phase II Review & GIS Mapping Remediation Plans Potential Development Scenarios Cost Estimation