Download presentation
Presentation is loading. Please wait.
1
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 1Not legally binding Participation & Dissemination Rules for the 6th Framework Programme 2002-2006 (EC) Jean-David MALO DG RTD - Unit A3
2
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 2Not legally binding Legal Framework EC TREATY FRAMEWORK PROGRAMME SPECIFIC PROGRAMS PARTICIPATION AND DISSEMINATION RULES CONTRACTS Other relevant EC Regulations: e.g. EC Financial Regulations (Budgetary Law) INTERNATIONAL AGREEMENTS
3
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 3Not legally binding General issues Final Adoption by the Council (November 2002) Development of Model Contracts and work programmes + Calls for proposals (December 2002) Publication of Calls : 17 December 2002
4
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 4Not legally binding General Issues Drafted with the aim of Simplification: no implementing regulations; less than 10 model-contracts (currently 33) Flexibility: the work programme may adjust rules to RTD activities’/instruments’ specificity Autonomy for participants: within the framework of the rules, organisation of relations within the consortium is a matter for participants themselves
5
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 5Not legally binding Core contract standard text (completed with project data) Annex I the “project” (technical tasks - work to be carried out) Annex II general conditions (standard, applicable to every instrument) Annex III instrument specific provisions (variable per instrument) Contract Structure
6
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 6Not legally binding Instruments New Networks of excellence, Integrated projects, Integrated initiatives infrastructures, Collective research projects (Specific research projects for SMEs), Article 169 Traditional Specific targeted projects, Co- operative research projects (Specific research projects for SMEs), Actions to promote and develop human resources and mobility (Some are new), Co-ordination actions, Specific support actions BUT RULES APPLIES TO ALL
7
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 7Not legally binding Principles guiding their design l Simplification and streamlining –to minimise the overheads for all concerned –to speed up procedures, especially time-to-contract l Increased legal and financial security –to avoid weaknesses of FP5 instruments l Flexibility and adaptability –to enable instruments to adapt to changing circumstances, both in science and partnership l Increased management autonomy –to eliminate unnecessary micromanagement l While preserving public accountability and protecting interests of the Community
8
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 8Not legally binding Participation Who can participate? New Every legal entity that contributes to the project (incl. Project managers) New Associated candidate countries = Member States New International European interest organisations = Member States
9
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 9Not legally binding Participation Minimum number New 3 from MS or AS, with 2 from MS or Ass. Cand. Countries for all the instruments 1 (MS or AS or Third Country or International organisation) possible for fellowships and specific support actions Flexibility : Minimum number can be increased by work-programmes
10
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 10Not legally binding Participation Other countries and other International organisations INTEGRATING PART Participation for all Financing for INCO countries Financing for others if essential to carry out the project OTHER PARTS Participation for all those with co-operation agreement under its conditions; funding if essential. Participation for the others in activities if necessary to carry out the project; funding if essential.
11
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 11Not legally binding PARTICIPATION/FINANCING
12
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 12Not legally binding Evaluation Core criteria & Criteria for new instruments To be specified and complemented in work programmes according to instrument and activity New Additional criteria Synergies with education, role of women in research, societal impact Not compulsory Exclusion criteria Violation of fundamental ethical principles New Financial irregularities (see EC Financial Regulations)
13
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 13Not legally binding Evaluation New Two-stage evaluation procedure If specified in the call for proposals New Evaluation on a non-anonymous basis Unless otherwise specified in call for proposal New Manuals on evaluation and on negotiation and selection procedures
14
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 14Not legally binding Key issues in the evaluation of IPs l Relevance to the objectives of the programme (S&T, S-E, policy objectives of WP) l S&T excellence (focus, progress beyond state-of-art, S&T approach) l Potential impact (ambition,competitiveness, societal problems, European dimension, optimal use of results) l Quality of the consortium (commitment, suitability, complementarity, SMEs) l Quality of the management (organisational structure, project, knowledge, IPR, innovation) l Mobilisation of resources (critical mass, coherence, financial
15
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 15Not legally binding Key issues in the evaluation of NoE l Relevance to the objectives of the programme (S&T, S-E, policy objectives of WP) l Participants excellence (R&D, suitability, critical mass) l Potential impact (strenghthening S&T excellence, ambition, spreading excellence, durable structuring) l Degree of integration & JPA (deep and durable integration, quality) l Organisation and management (organisational structure, network)
16
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 16Not legally binding Relevance to the objectives of the programme (S&T, S-E, policy objectives of WP) S&T excellence (focus, progress beyond state-of-art, S&T approach) Potential impact (competitiveness, societal problems, European dimension, optimal use of results) Quality of the consortium (commitment, suitability, complementarity, SMEs) Quality of the management (project, knowledge, IPR, innovation) Mobilisation of resources (necessity, coherence, financial plan) Key issues in the evaluation of STREPs
17
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 17Not legally binding Relevance to the objectives of the programme (S&T, S-E, policy objectives of WP) Quality of the co-ordination (progress beyond state-of-art, robustness of mechanisms) Potential impact (European dimension, Community support, critical mass mobilisation, optimal use of results) Quality of the consortium (suitability, complementarity) Quality of the management (project, knowledge, IPR, innovation) Mobilisation of resources (necessity, coherence, financial plan) Key issues in the evaluation of CAs
18
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 18Not legally binding Relevance to the objectives of the programme (support objectives of WP, Call, SPs, ERA) Quality of the support action (soundness and quality of design, competencies, innovation-originality) Potential impact (European dimension, Community support, optimal use of results) Quality of the management (credibility of capacity to deliver) Mobilisation of resources (necessity, financial plan) Key issues in the evaluation of SSAs
19
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 19Not legally binding Implementation How? Contractual link of all participants with the Commission New no more categories : all participants are contractors and have the same rights & obligations Contract enters into force and the advance is paid New once signed by the coordinator and the Commission New other contractors’ written consents are collected by the coordinator and sent to the Commission within two months = quicker entry into force and payment
20
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 20Not legally binding Implementation How? Change/addition of participants –New at the request of the coordinator, deemed to act on behalf of the consortium –New with implicit agreement of the Commission within 6 weeks –New in IP/NoE, enlargement of the consortium to new participants and new activities may be foreseen. This enlargement follows then a call launched by the consortium with evaluation of proposals by external experts
21
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 21Not legally binding Flexibility and autonomy in implementing IPs l For the implementation plan, each year, the consortium –proposes a detailed plan for the coming 18 months –and may propose to update the overall plan uboth need approval of the Commission to enter into force l For the Community contribution –the contract will not specify its distribution between participants nor between activities l For changes in the consortium –the consortium may itself decide to take in new participants (though without additional funding) uthe contract will specify when this must involve a competitive call –the Commission may decide to launch calls to add activities and participants (with additional funding)
22
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 22Not legally binding Flexibility and autonomy for NoE l For the JPA, each year, the network –proposes a detailed JPA for the coming 18 months –and may propose to update the overall JPA uboth need approval of the Commission to enter into force l For the allocation of the Community grant –the partnership will have freedom to distribute it between partners and between activities l For changes in the network partnership –the partnership may itself decide to take in new partners (though without additional financing) uthe contract will specify when this must involve a competitive call –the Commission may decide to launch calls to add partners (with additional financing)
23
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 23Not legally binding Implementation of STREPs, CAs and SSAs l For the work plan, the consortium –proposes a detailed plan for the whole duration –and may propose to modify the detailed work plan ubut needs approval of the Commission to enter into force and uwithout modifying the overall objectives and deliverables l For the Community contribution –the contract will not specify its distribution between participants l For changes in the consortium –the consortium may modify its composition (subject to Commission approval, without additional funding, infrequent occurrence)
24
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 24Not legally binding Financing
25
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 25Not legally binding Financing
26
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 26Not legally binding Financing Grant for integration (NoE) New mechanism Calculation basis: degree of integration, number of researchers to be integrated, characteristics of the field concerned, JPA not as a %age of the budget for the JPA Payment basis: completion of the JPA + costs certificates mentioning that the costs incurred are greater than the grant itself è Premium for integration (fixed grant)
27
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 27Not legally binding Financial regime of NoE l The average annual grant to a network could vary with the number of researchers as follows: l In this illustration, a network of 200 researchers supported over 5 years would therefore receive a fixed grant of €17.5 million (plus bonus for registered doctoral students)
28
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 28Not legally binding Financing Grant to the budget Calculation basis: %age of the preliminary budget of the execution plan Payment basis: covers a share of the expenditure incurred, necessary for the execution of the indirect action %age depends on: type of activity participant involved
29
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 29Not legally binding Financing Where it takes the form of reimbursement of eligible costs, the Community financial contribution : can only cover “supplementary costs” (costs not already covered by another source of financing, especially public) can cover up to 100% of those supplementary costs, providing a real co-financing scheme must be adapted for some legal entities (“commercial entities”) to take into account the ceiling of public financial support for research and demonstration activities.
30
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 30Not legally binding Financing For instruments with no R&TD and/or demonstration activities 100% of the supplementary costs whatever the instrument and its activities, providing a real co- financing scheme. As a general rule (except special clause in the contract), indirect costs are deemed to be covered by a flat rate (established in the contract) [ACF][SCF] Reports: Financial statement : only supplementary costs Management report : description of use of all resources involved
31
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 31Not legally binding For instruments with R&TD and/or demonstration activities (1/3) 100% of the supplementary costs whatever the instrument and its activities, providing a real co- financing scheme, for legal entities for which the Community framework on State aids for research and development does not apply. For those entities : either real indirect costs ([AC][SC]) or flat rate (20% of their direct costs except subcontracting costs) deemed to cover their indirect costs ([ACF][SCF]) Reports: Financial statement : only supplementary costs Management report : description of use of all resources involved Financing
32
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 32Not legally binding For instruments with R&TD and/or demonstration activities (2/3) Up to 100% of the supplementary costs whatever the instrument and its activities, for legal entities for which the Community framework on State aids for research and development apply (“commercial entities”), in so far as: it does not exceed 50% of the total eligible costs of research and technological development activities and does not result in total support from public sources exceeding 75% of the total eligible costs of research and technological development activities ; it does not exceed 35% of the total eligible costs of demonstration activities and does not result in total support from public sources exceeding 50% of the total eligible costs of demonstration activities ; Financing
33
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 33Not legally binding Financing For instruments with R&TD and/or demonstration activities (3/3) For those entities (“commercial entities”) : real indirect costs ([FC][TC]), except for SMEs (real indirect costs ([FC][TC]) or flat rate (20% of their direct costs except subcontracting costs) deemed to cover their indirect costs ([FCF][TCF]) ) Reports: Financial statement : total costs and receipts (public and private) Management report : description of use of all resources involved
34
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 34Not legally binding Financing Type of activity Research and technological development (including innovation related activity) Demonstration Training New Consortium Management - reimbursed up to 100% within the limit of 7% of community contribution Other activities specific to an instrument
35
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 35Not legally binding Financing Modalities New no cost categories but list of ineligible costs New Participants’ own accounting rules New Periodical cost certificates by external auditor New Periodical advances and settlements yearly for IP and NoE periodicity of settlements to be specified in the contract for other instruments New No pre-allocation of the EC contribution between participants (funding is granted to the consortium as a whole)
36
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 36Not legally binding Consortium agreement Renewed importance due to the new legal and financial approaches Regulates internal organisation of consortium, such as i.a.: management of the project and allocation of the EC financing agreement on IPR access rights crisis management
37
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 37Not legally binding Consortium agreement New Compulsory except otherwise mentioned in the call for proposal Not signed nor approved by the Commission After or (preferably) before signing the contract but some decisions must be made by the participants before signature of contract (e.g. IPR issues) Non binding guidelines published by the Commission
38
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 38Not legally binding Liability New Collective responsibility of the participants Responsibility of a last resort Limited in proportion to the participant’s share of costs in the project, up to the total payment they are entitled to receive IOs, public bodies or entities guaranteed by MS/AS solely responsible for their own debts Exceptions for specific actions for SME’s and fellowships, and when duly justified for specific support actions
39
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 39Not legally binding Control and Sanctions Objective to reinforce ex-post controls To simplify and streamline ex-ante controls: no systematic ex-ante financial controls (for instruments with collective responsibility) no bank guarantee (for instruments with collective responsibility) As a counterbalance to increased autonomy for participants
40
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 40Not legally binding Control and Sanctions How? New Continuous monitoring by Commission with external experts (mandatory for IP and NoE) Periodical verification of expenditure made (annual for IP & NoE) based on audit certificates Technical (incl. ethical), technological, and financial audits
41
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 41Not legally binding Control and Sanctions Sanctions Collective responsibility is also a form of sanction Exclusion criterion, up to 5 years: financial irregularity + other cases foreseen in Article 93 of the new EC Financial Regulations Recovery decisions (art. 256 EC Treaty) Other sanctions in contracts, such as financial penalties
42
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 42Not legally binding Monitoring and audits for IPs l Robust output monitoring by the Commission, involving external experts at all stages uannual review u mid-term or milestone review,and ufinal review l Commission may also carry out audits ufinancial (at least one per IP) utechnical utechnological uethical
43
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 43Not legally binding Governance and monitoring for NoE (1) l A network’s governance must ensure institutional engagement by the partner organisations –through e.g. a “governing board” of senior representatives from the partners uto oversee integration of the partners’ activities
44
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 44Not legally binding Governance and monitoring for NoE (2) Robust output monitoring by the Commission, involving external experts at all stages –annual reviews ubasis for payment by results utriggering a yellow flag/red flag, if a review is failed –end-of-term review uto assess impact of network on strengthening and spreading excellence l Audits carried out by the Commission: financial (at least one for each NoE, technical, technological, ethical.
45
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 45Not legally binding Monitoring of STREPs, CAs and SSAs l Follow-up scheme: –Commission PO assigned –may foresee mid-term review with assistance of experts (e.g. if duration 3 years or more), with a go/no go decision to continue the project –may include various types of audits as appropriate
46
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 46Not legally binding Intellectual property rights (IPR) Developed on the basis of Feedback from FP5 Features of the “new instruments” participants may leave/join during the project “larger” projects
47
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 47Not legally binding Consistency with FP5 (same concepts) Simplification New Same IPR rules for all instruments (few exceptions) New Same IPR rules for all participants Increased certainty, in particular regarding access rights (restricted to what is necessary) Increased emphasis on the management of knowledge and IP (especially new instruments) Principles
48
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 48Not legally binding General concepts Definitions: no major change w.r.t. FP5 “knowledge”, “pre-existing know-how”, “use”, “dissemination”,... Ownership: no major changes w.r.t. FP5 resides with the participants (incl. JRC) generating knowledge exception for SMEs actions : ownership resides with the SMEs, not with the “RTD Performers” exception for public procurements (Commission buys a result) transfer: prior notice to other participants + Commission (possible objection within 30 days)
49
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 49Not legally binding General concepts Protection New required but not limited to legal protection (public domain approach, etc. possible) Publication New allowed if not detrimental to protection prior notice to Commission + other participants (possible objection within 30 days) Use / dissemination New compulsory under conditions Commission may disseminate itself if needed
50
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 50Not legally binding Access rights General principles New Granted on written request No sub-licensing (unless explicitly agreed + possible optional clause for software) Obligatory ARs between participants limited to what they really need (either for carrying out the project or for using their own knowledge) but broader ARs may be freely negotiated ARs granted to third parties : Commission may object
51
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 51Not legally binding Access rights New features Feedback from FP5: need for pre-existing know- how (PEKH) to be better safeguarded New Possibility for a participant to exclude specific pieces of its PEKH from the obligation to grant ARs to the others with the agreement of all participants before the participant concerned signs the contract (or before entry of a new participant)
52
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 52Not legally binding FP6 System of Access Rights Access rights to pre-existing know-how Access rights to knowledge If a participant needs them for carrying out its own work under the project For carrying out the project Royalty-free unless otherwise agreed before signing the contract Royalty-free If a participant needs them for using its own knowledge For use (exploitation + further research) Non-discriminatory conditions to be agreed Royalty-free unless otherwise agreed before signing the contract Possibility for participants to agree on exclusion of specific pre-existing know-how before signature of the contract (or before entry of a new participant)
53
RTD-A.3 Legal Unit - Participation rules for FP 2002-2006 03/06/2015 53Not legally binding General FP6 Site : http://europa.eu.int/comm/research/fp6/index_en.ht ml Instruments : http://europa.eu.int/comm/research/fp6/networks- ip.html Contracts : http://europa.eu.int/comm/research/fp6/working - groups/model-contract/index_en.html For further information
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.