AMC Conferance Ottawa 14. June 2001 UncertaintyManagement Johan Dovmark a Tool in RiskManagement.

Similar presentations


Presentation on theme: "AMC Conferance Ottawa 14. June 2001 UncertaintyManagement Johan Dovmark a Tool in RiskManagement."— Presentation transcript:

1 AMC Conferance Ottawa 14. June 2001 UncertaintyManagement Johan Dovmark a Tool in RiskManagement

2 Flow and operations - TodayR&D Functional Req. GPS SpecProduction Manufactu- ring docu- mentation Production ComponentsQA+QC Part verification Type testing FTA, FMEA & Tolerance-stackup calculations etc. FR-Loop GPS-Loop

3 Decision base ! NNSupplier

4 Process Capability

5 Functional-characteristic LSLUSL Function 100 % 0 %

6 Capability difficult easy Functional need critical not critical Metrological focus Design target

7 $ T/20 Production costs Verification costs Total costs 2S U Costs

8 Optimum Uncertainty management Verification costs Production costs Total costs $ T/20 2S UTUT Verification costs Production costs Total costs $ T/20 2S UTUT Verification costs Production costs Total costs $ T/20 2S UTUT Time

9 Capability difficult easy Functional need critical not critical Metrological focus Design target

10 The 3. dimension Measurement uncertainty Small Large R&D focus Design target

11 R & D Future flow Functional Req. GPS Spec.Production Manufactu- ring docu- mentation Production ComponentsQA Part verification FTA, FMEA & Tolerance-stackup calculations etc. Functional parameters Capability Measurement uncertainty and cooperation Param. to be verified Type testing UTUT U corr. U spec. 1 U meas.1 U meas.2 FR-Loop GPS-Loop U spec. 2

12 Pareto’s Law: log N = log A + m log x Vilfredo Pareto (1897) The 80 / 20 - rule