Presentation to the Air Quality Forum – August 9, 2005 Clark County PM 10 Saturation Study Robert A. Baxter, CCM T & B Systems, Inc.
2
Background Clark County is in non-attainment for the 24- hour PM 10 NAAQS 2001 SIP made a commitment to conduct a PM 10 saturation study Study to begin in 2004 and be completed in 2006
3
Study Goals and Objectives Determine neighborhood impacts of major sources Determine PM concentrations in locations that may not be covered by the current monitoring network Determine inter-basin and intra-basin transport during high wind events
4
Study Design Evaluate existing data sets for apparent trends Design the monitoring network Sampler evaluation (fall 2004) Acquire appropriate saturation sites Saturation study (April 15 – June 30) Evaluate the collected data
5
PM 10 Data Evaluation Years 2000 – 2003
8
DAQEM PM 10 Site Locations
9
PM 10 Site Locations
10
DAQEM PM 10 Site Locations
11
PM 10 Site Locations
12
PM 10 Instrument Evaluation Two evaluation sites –Crustal PM 10 –Combustion emissions related PM 10 Evaluation Criteria –Continuous Method –Acceptable performance –No environmental controls –Solar power –Inconspicuous –Cost-effective –Reliable
13
PM 10 Instrument Evaluation October/November 2004
15
Selected Instrumentation TSI DustTrak External data logging Extended sample inlet Solar/available power
16
Instrument Siting
18
Saturation Sampling Schedule Study Period = April 15 – June 30 Continuous sampling for study duration QA program for network assessment and performance Weekly data downloads and QC checks
19
What Have We Seen? Fall and winter rainy periods Late spring/early summer high wind events Wind events produced short lived PM 10 “episodes” No PM 10 exceedances in the Las Vegas Valley network Desert environment is rough on instrumentation
20
Questions? Please contact: Department of Air Quality and Environmental Management (DAQEM) (702) 455-5942