Download presentation
Presentation is loading. Please wait.
1
Ergonomics Program Development TM 655 Dr. Carter Kerk SDSMT Summer 2008
2
Ergonomics Program Guidelines (from OSHA Meatpacking Guidelines) Top Management Commitment Written Program Employee Involvement Program Review & Evaluation Worksite Analysis Hazard Prevention & Control Medical Management Training & Education
3
Top Management Commitment Visible & serious commitment Placing a priority on eliminating hazards Integrate S&H programs at the same level as production Assign responsibilities, authority, and resources
4
Ergonomics Program Guidelines Top Management Commitment Written Program Employee Involvement Program Review & Evaluation Worksite Analysis Hazard Prevention & Control Medical Management Training & Education
5
Written Program Endorsed by top management Outlines goals and plans Estimated implementation dates Customized to each plant Available to all personnel Reviewed regularly
6
Ergonomics Program Guidelines Top Management Commitment Written Program Employee Involvement Program Review & Evaluation Worksite Analysis Hazard Prevention & Control Medical Management Training & Education
7
Employee Involvement Suggestions & feedback encouraged Without fear of reprisal Prompt reporting of symptoms Prompt evaluation and possible treatment Membership on Ergo Team Ergo Team receives symptom reports & suggestions for evaluation
8
Ergonomics Program Guidelines Top Management Commitment Written Program Employee Involvement Program Review & Evaluation Worksite Analysis Hazard Prevention & Control Medical Management Training & Education
9
Program Review & Evaluation Regular review (~ semi-annual) Analysis of trends in injury rates Employee surveys Before / After surveys of changes Records of job improvements New or revised goals
10
Ergonomics Program Guidelines Top Management Commitment Written Program Employee Involvement Program Review & Evaluation Worksite Analysis Hazard Prevention & Control Medical Management Training & Education
11
Worksite Analysis Identification Evaluation Control
12
Worksite Analysis Analyze medical, safety, insurance records for evidence of CTDs Insure confidentiality of patient records Incident Rate Analysis Count incidences of properly diagnosed CTDs per 100 full-time employees per year
13
Incident Rate (# of new cases) (200,000 work hours) IR = _______________________________ # of hours worked 200,000 = (40 hrs/wk) (50 wk/yr) (100 workers) Evaluate trends by department, units, job titles, operations, work stations, etc.
14
Ergonomics Checklist Focused on physical / temporal risk factors Systematic Helps novices be “experts” ID higher and lower risk jobs Apply before & after changes Apply to planned and new workspaces
15
Body Part Discomfort Map
16
Employee Surveys & Interviews Interviews are usually superior, but more time consuming Get employees more involved Employees have a wealth of ideas
17
Worksite Analysis Checklist may suggest one or more advanced analyses: Biomechanical Psychophysical NIOSH Lifting Guide Physiological Postural Hand Tool Vibration
18
Worksite Analysis Performed by an ergonomist Ergonomics Team Ergonomist Occupational Health Nurse Design & Production Engineers Maintenance Employee representation Line Supervisor
19
Ergonomics Program Guidelines Top Management Commitment Written Program Employee Involvement Program Review & Evaluation Worksite Analysis Hazard Prevention & Control Medical Management Training & Education
20
Hazard Prevention & Control Engineering Controls Administrative Controls Personal Protective Equipment
21
Engineering Controls Most desirable approach Redesign or Modify Workstation Tools Work Methods “Fit the worker”
22
Engineering Controls Establishing optimal work methods Adjustable workstations Tilt bins or containers Tool balancers Conveyors, Turntables Jigs, Fixtures Rounded or padded edges on worksurfaces Mechanical assist devices Selection of “ergonomic” tools
23
Work Surfaces Adjustability Ease of Adjustability Avoid sharp edges Consider sit/stand options
24
Placement & Storage of Materials Consider frequency and weight Store heaviest and most frequent at knuckle height, “Power Zone” Store medium items from knee to shoulder Store only light items below knee or above shoulder
25
Work Station Accessories Arm rests Wrist rests Foot rails and foot rests Document holders
29
Engineering Controls
31
Hazard Prevention & Control Engineering Controls Administrative Controls Personal Protective Equipment
32
Administrative Controls Secondary to Engineering Controls Insure proper methods are used Effective maintenance & housekeeping Proper use of tools & equipment Employee conditioning New employee conditioning
34
Administrative Controls Examples Limiting overtime on high risk jobs Ensuring “adequate” rest breaks Job rotation Job enlargement Training Teaming Reduce production rates Last resort
35
Microbreaks What is a microbreak? Take them frequently
36
Standing Fatigue Interventions Proper footwear Shoe inserts Anti-fatigue mats Footrails Promote good lower extremity circulation
37
Hazard Prevention & Control Engineering Controls Administrative Controls Personal Protective Equipment
38
After engineering & administrative controls are exhausted Gloves Finger cots Arm guards NOT PPE: Braces, splints, back belts
39
Wrist Splints
40
Ergonomics Program Guidelines Top Management Commitment Written Program Employee Involvement Program Review & Evaluation Worksite Analysis Hazard Prevention & Control Medical Management Training & Education
41
Medical Management Involvement of “qualified” medical personnel Certified Occupational Physicians Certified Occupational Health Nurses Occupational/Physical Therapists Member of Ergonomics Team Active surveillance for symptoms Thorough diagnosis
42
Medical Management Conservative treatment Conservative return to work Systematic monitoring & follow-up Work hardening Consider light duty transition Recordkeeping Tracking trends Promote stretching & strengthening programs
44
Ergonomics Program Guidelines Top Management Commitment Written Program Employee Involvement Program Review & Evaluation Worksite Analysis Hazard Prevention & Control Medical Management Training & Education
45
Keep employees informed of program Train: Production workers Engineers Maintenance & housekeeping personnel Supervisors & Managers Medical personnel
46
Training & Education Customized for each plant and its written program General & specific training levels Train on disorders & symptoms Risk Factor Awareness including Personal, psychosocial, non-occupational Engineering control strategies
47
Lifting Squat lift generally better than stoop bend with your knees, not your back keep the load close get a good hand hold move slowly, “no jerks allowed” know or test the load Avoid twists
48
More Lifting Tips Get help (from a person or an assist device) Eliminate lifts Reduce loads Store properly Get a strategic delivery Use proper technique on light loads
49
Ergonomics Program Guidelines Top Management Commitment Written Program Employee Involvement Program Review & Evaluation Worksite Analysis Hazard Prevention & Control Medical Management Training & Education
50
Barriers to Successful Ergonomics Programs Lack of funding Implementation delays Poor attendance by middle managers Viewing ergonomics as a productivity program Excessive dependence on consultants Failure to develop internal ergo expertise
51
A Bad Ergonomics Program?
52
Ingredients for Effective Ergo Programs Leadership commitment Clear purpose Worker / supervisor involvement Rigorous problem solving Active Ergo Team with expertise Ergo is a process, not a program Start small & expand - Kaizen
53
HW OEG (OSHA Ergonomics Guidelines) Read one of the available OSHA Ergonomics Guidelines and write a four page (double spaced) paper on how you would implement such a program from a manager’s standpoint. 50 points Due as soon as possible
54
HW OEG, Continued Guidelines Nursing Homes Poultry Processing Retail Grocery Shipyards Available from the course website and from www.osha.gov, Ergonomics, Guidelineswww.osha.gov
55
Assignment MacLeod, Chapters Five & Seven Gabriel, Chapter Four HW OEG CE 4 (Case Example 4) Exam II (covers material thru 6/3/08) Tuesday, June 10, 7 PM (90 Minutes) Closed Book Crib Sheet, 1-8.5”x11” paper, two-sided, hand- written original, hand in with exam
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.