Team SkyHawk Launch Readiness Review Fort Lewis College Adam Baker, Nick Laitsch, Bill Fellman
2
Freezer Testing Heaters and boards were tested in a cooler filled with dry ice. Data logging measured temperatures near -40 Heaters were successfully controlled by two methods: – Self regulating Temperature sensor and relay. – Arduino controlled Temperature monitoring with mosfet trigger.
3
Vacuum Testing All components were vacuum tested. – Geiger tubes were our only real concern… Everything worked flawlessly. Geiger Tube Vacuum Testing Video
4
Whip & Drop Tests Whip Test Video Drop Test Video Test piece had a 1kg water bottle taped to the flight string tube.
5
Test Results
7
Future plans
8
Electronic Jungle
9
Any Questions?