Download presentation
Presentation is loading. Please wait.
1
Eric Buddrius Amanda Bolland Ian Lootens Greg Hilbert STEALTH CAT’S
2
SPECIFICATIONS
3
CATALYST Aristo Contact is Bob McDowell Goal: to meet National Park Standards Focus: Carbon Monoxide and Unburned Hydrocarbons emissions Emissions Data 2010 Results CSC LimitNPS BAT CO209.94< 275< 120 HC41.6-< 15 NOX5.8-- HC+NOX47.36< 90- E-Score125.9> 100- Units: g/kW-hr
4
MUFFLER BASICS Two Main Functions Reflection Most Effective Destructive Interference High Back Pressure Restriction Most Common Cheapest Absorption Simple with Low Back Pressure Low Damping
5
HUSHPOWER TECHNOLOGY A.Entry Cone B. Laminar Flow Area C. Thermal Barrier D. Exit Cone
6
DESIGN EVALUATION Flow Bench Ricardo Wave J 192 Testing Procedure Timeline
7
FLOW BENCH Test Stand Settling Chamber Mass Flow Meter Vacuum Supply
8
FLOW BENCH Active Flow Bench Vacuum source Test Part Multiple uses Cylinders Porting Mufflers Air filters Measures Pressure differential with respect to mass flow
9
WHAT IS RICARDO WAVE?
10
MUFFLERS IN RICARDO WAVE
11
RICARDO WNOISE
12
RICARDO WNOISE OUTPUT
13
J 192 SOUND TEST
14
SOUND TESTING Existing Muffler Laminar Flow Muffler Hushpower Muffler Affect of Packing Small vs. Large Cone Perforation Series Parallel
15
TIMELINE November 29 th – Start J192 Sound Testing of Existing Mufflers December 10 th – Complete Flow Bench December 15 th – Flow Test Existing Mufflers December 17 th – Final Muffler Designed January 15 th – Receive Final CAT January 21st – Final Muffler Built January 22 nd – Begin Testing Final Muffler on Sled March 4 th – Leave for Competition
16
QUESTIONS?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.