1 Eric Buddrius Amanda Bolland Ian Lootens Greg Hilbert STEALTH CAT’S

2 SPECIFICATIONS

3 CATALYST Aristo Contact is Bob McDowell Goal: to meet National Park Standards Focus: Carbon Monoxide and Unburned Hydrocarbons emissions Emissions Data 2010 Results CSC LimitNPS BAT CO209.94< 275< 120 HC41.6-< 15 NOX5.8-- HC+NOX47.36< 90- E-Score125.9> 100- Units: g/kW-hr

4 MUFFLER BASICS Two Main Functions Reflection Most Effective Destructive Interference High Back Pressure Restriction Most Common Cheapest Absorption Simple with Low Back Pressure Low Damping

5 HUSHPOWER TECHNOLOGY A.Entry Cone B. Laminar Flow Area C. Thermal Barrier D. Exit Cone

6 DESIGN EVALUATION Flow Bench Ricardo Wave J 192 Testing Procedure Timeline

7 FLOW BENCH Test Stand Settling Chamber Mass Flow Meter Vacuum Supply

8 FLOW BENCH Active Flow Bench Vacuum source Test Part Multiple uses Cylinders Porting Mufflers Air filters Measures Pressure differential with respect to mass flow

9 WHAT IS RICARDO WAVE?

10 MUFFLERS IN RICARDO WAVE

11 RICARDO WNOISE

12 RICARDO WNOISE OUTPUT

13 J 192 SOUND TEST

14 SOUND TESTING Existing Muffler Laminar Flow Muffler Hushpower Muffler Affect of Packing Small vs. Large Cone Perforation Series Parallel

15 TIMELINE November 29 th – Start J192 Sound Testing of Existing Mufflers December 10 th – Complete Flow Bench December 15 th – Flow Test Existing Mufflers December 17 th – Final Muffler Designed January 15 th – Receive Final CAT January 21st – Final Muffler Built January 22 nd – Begin Testing Final Muffler on Sled March 4 th – Leave for Competition

16 QUESTIONS?