Presentation is loading. Please wait.

Presentation is loading. Please wait.

MARK BECKMAN JON BROCK ERIK VAN KAMPEN TYLER WIERS ATLAS|LIFT Team 8.

Similar presentations


Presentation on theme: "MARK BECKMAN JON BROCK ERIK VAN KAMPEN TYLER WIERS ATLAS|LIFT Team 8."— Presentation transcript:

1 MARK BECKMAN JON BROCK ERIK VAN KAMPEN TYLER WIERS ATLAS|LIFT Team 8

2 The Team Jon Brock Erik Van Kampen Mark Beckman Tyler Wiers

3 OUTLINE Project Description Design Norms Design Process Obstacles Accomplishments Updated Design Questions

4 Project Background Project Description Vertellus Specialties Inc.  Maker of Mouthwash and Gum Flavor Improve Employee Safety  Manual to Automatic Lifting of Barrels  Less Strenuous  More Efficient Design a Machine to Lift and Pour Fiber Drums  Pour Powdered Chemicals into Reactors

5 Design Norms Transparency  Easy to Understand and Operate  Donated Parts are for Profit End User Trust  Improved Employee Safety  Task Efficiency  Operation Safety

6 Design Process Iterative Frame Design to Optimize for Strength and Weight Research and Consult with Hydraulics Experts

7 Obstacles Overcome  Explosion Proof Electrical System  Mystery Machine  Change in Consultants  Minimize Cost Future  Frame Construction  Electrical System

8 Accomplishments Acquired Obsolete Machine Made Machine Operational Designed and Tested Several Models on the Computer Designed Hydraulic System Current SystemUpgraded System

9 Updated Design Simple Tilting Frame Salvaged Hydraulic Cylinder, Pump, Motor, Electrical System Bidirectional Hydraulic Upgrade Manual Directional Valve Over-center Valve

10 Questions


Download ppt "MARK BECKMAN JON BROCK ERIK VAN KAMPEN TYLER WIERS ATLAS|LIFT Team 8."

Similar presentations


Ads by Google