MARK BECKMAN JON BROCK ERIK VAN KAMPEN TYLER WIERS ATLAS|LIFT Team 8
2
The Team Jon Brock Erik Van Kampen Mark Beckman Tyler Wiers
3
OUTLINE Project Description Design Norms Design Process Obstacles Accomplishments Updated Design Questions
4
Project Background Project Description Vertellus Specialties Inc. Maker of Mouthwash and Gum Flavor Improve Employee Safety Manual to Automatic Lifting of Barrels Less Strenuous More Efficient Design a Machine to Lift and Pour Fiber Drums Pour Powdered Chemicals into Reactors
5
Design Norms Transparency Easy to Understand and Operate Donated Parts are for Profit End User Trust Improved Employee Safety Task Efficiency Operation Safety
6
Design Process Iterative Frame Design to Optimize for Strength and Weight Research and Consult with Hydraulics Experts
7
Obstacles Overcome Explosion Proof Electrical System Mystery Machine Change in Consultants Minimize Cost Future Frame Construction Electrical System
8
Accomplishments Acquired Obsolete Machine Made Machine Operational Designed and Tested Several Models on the Computer Designed Hydraulic System Current SystemUpgraded System
9
Updated Design Simple Tilting Frame Salvaged Hydraulic Cylinder, Pump, Motor, Electrical System Bidirectional Hydraulic Upgrade Manual Directional Valve Over-center Valve