Presentation is loading. Please wait.

Presentation is loading. Please wait.

EnviroMap.

Similar presentations


Presentation on theme: "EnviroMap."— Presentation transcript:

1 EnviroMap

2 Introduction Standard Environmental Sampling Process
Software Objectives EnviroMap Demo EnviroMap vs. Alternative Solutions Questions

3 Standard Environmental Sampling Process
Schedule created by user choosing sites from a list List of sites to be sampled are printed out and given to a sampler Sites are sampled, collection times recorded, and samples are sent to lab Results are returned from the lab, and handled according to predefined procedures Historical results are maintained and analyzed routinely, to determine the risk of sites Standard Environmental Sampling Process

4 Drawbacks Scheduling Sites are not truly selected at random
Risk level priorities are left up to the user creating the schedule Sampling Changes are difficult on-the-fly, leading to an incomplete audit trail Procedures are handled and enforced manually Time Consuming Enforcing Procedures Maintaining Results Analyzing Results Drawbacks

5 A better solution?

6 Software Objectives Historical Data Analysis Site Audit Trail
EnviroMap Historical Data Analysis Site Audit Trail Alerts & Notifications Enforce Positive Result Procedures Integrate w/External LIMS Improved Sampling Automatic Scheduling Software Objectives

7 Automatic Scheduling

8 Sites are chosen at random, with high risk sites selected more frequently

9 Allows multiple schedules to run concurrently; reduces contamination risk by not scheduling the same site more than once a day

10 Supports requesting multiple tests for each sampled site via test groups

11 Schedule length, sample frequency, sampling times, and collection sizes can all be customized

12 Automatic Scheduling Summary
Sites are chosen at random, with high risk sites selected more frequently Allows multiple schedules to run concurrently, and reduces contamination risk by not scheduling the same site more than once a day Supports requesting multiple tests for each sampled site via test groups Schedule length, sample frequency, sampling times, and collection sizes can all be customized

13 Improved Sampling

14 Quick Calendar View of Scheduled Collections

15 Mobile Integration eliminates need for desktop computer at sampling site

16 Barcode Integration supports barcodes and ID #’s from external systems

17 Rapid collection-time entry, with on-the-fly change capabilities

18 Sampling Summary Quick Calendar View of Scheduled Collections
Mobile Integration eliminates need for computer at sampling site Barcode Integration supports barcodes and ID #’s from external systems Rapid collection-time entry, with on-the- fly change capabilities

19 External LIMS Integration

20 LIMS Sample Submission Web Services XML CSV Email/Fax Excel PDF FTP
XLS Sample Submission

21 Results Retrieval LIMS EnviroMap Web Services XML CSV Email Excel PDF
FTP XLS EnviroMap Results Retrieval

22 Ability to choose a different LIMS system for each user defined test type

23 LIMS Integration Summary
Automatic submission & results retrieval from external LIMS systems Integration via web services, ftp, or in the following formats: xml, csv, or xls Ability to choose a different LIMS system for each user defined test type Supports & displays external LIMS reference numbers

24 Positive Result Procedures

25 Procedures are automatically started when a positive result is received

26 Separate procedures can be defined based on positive iteration (1st positive vs. 2nd positive)

27 For numeric results, user defines “positive” based on result limits

28 Positive Result Procedures Summary
Procedures are automatically started when a positive result is received Separate procedures can be defined based on positive iteration (1st positive vs. 2nd positive) Procedures run for user defined length of time, number of negatives, or until all sites have been sampled For numeric results, user defines “positive” based on result limits

29 Notifications & Alerts

30 Notifications via email/text

31 Positive result alerts & site change notifications

32 Recent alerts/notifications displayed for user at login

33 Notifications & Alerts Summary
Notifications via /text Positive result alerts Site change notifications Recent alerts/notifications displayed for user at login

34 Site Audit Trail

35 Complete audit trail for every site in the system

36 Tracks all changes related to risk levels, name changes, scheduling, sampling, and results

37 Filter by event type, user or date range

38 Site Audit Trail Summary
Complete audit trail for every site in the system Tracks all changes related to risk levels, name changes, scheduling, sampling, and results Filter by event type, user or date range

39 Historical Data Analysis

40 Uses historical data and Optimized Trending Analysis Engine (O.T.A.E.) to determine which sites should be sampled more/less frequently

41 Allows for a user to override and cancel these suggestions before the integrated scheduler utilizes them

42 Quick Search to view recent results

43 Dynamic charting capabilities

44 Dynamic charting capabilities

45 Historical Data Analysis Summary
Uses historical data and Optimized Trending Analysis Engine (O.T.A.E.) to determine which sites should be sampled more/less frequently Allows for a user to override and cancel these suggestions before the integrated scheduler utilizes them Quick Search to view recent results Dynamic charting capabilities

46 EnviroMap vs. Alternative Solutions
Paper System Other Software Scheduling Automatic Manual # of Schedules Multiple Single # of Test Types Submitting Samples to LIMS Integrated Enforcing Procedures Notifications/Alerts Site Audit Trail Dynamic Charting Included Optimized Trending Analysis Engine (O.T.A.E) N/A

47 Questions?

48 EnviroMap Management Solutions of Virginia Larry Bowman 540-961-7122


Download ppt "EnviroMap."

Similar presentations


Ads by Google