Download presentation
Presentation is loading. Please wait.
1
Makoto Kajii SIT Chair 2010 – 2011 5 th Annual Report on CEOS Implementation of the GEOSS Space Segment - Virtual Constellations: 2011 Progress & requests to CEOS Agenda Item 6 The 25 th CEOS Plenary – Nov 8,9
2
GEO task, AR-09-02a “Virtual Constellations” Observations from a virtual constellation would provide better temporal, spatial, and spectral resolution and related data management and dissemination. A series of virtual constellations are in definition by space agencies, in consultation with user communities within the CEOS framework, each addressing key GEOSS observation gaps in the process. SIT Chair confirms each VC’s progress by regular Teleconference. Virtual Constellations
3
The 25 th CEOS Plenary – Nov 8,9 3 Atmospheric Chemistry (ACC) – Richard Eckman, NASA – Claus Zehner, ESA Land Surface Imaging (LSI) – Tom Holm, USGS – V.S. Hegde, ISRO – Julio Dalge, INPE Ocean Colour Radiometry (OCR) – Peter Regner, ESA – Prakash Chauhan, ISRO – Paula Bontempi, NASA Ocean Surface Topography (OST) – François Parisot, EUMETSAT – Eric Lindstrom, NASA Ocean Surface Vector Wind (OSVW) – Hans Bonekamp, EUMETSAT – Paul Chang, NOAA – B.S. Gohil, ISRO Precipitation (PC) – Riko Oki, JAXA – Steven Neeck, NASA Sea Surface Temperature (SST) being proposed and approved its initial proposal at SIT-26 CEOS Virtual Constellations & co-leads
4
The 25 th CEOS Plenary – Nov 8,9 Atmospheric Chemistry (ACC) – Volcanic Ash monitoring (Icelandic volcanic ash) demonstrated. – Air Quality Constellation position paper endorsed at SIT-26. – Total ozone set intercomparison. – Supplied draft response to CEOS response to GCOS IP. – AC Portal is under WGISS control. Land Surface Imaging (LSI) – Mid-resolution guideline finalized and released in August 2011. – LSI Portal enhance map-based query and direct data download. – Support for FCT/GOFI and JECAM requirements. – Free and Open-Source Tools for GIS available on-line. – Definition of LSI role in support to terrestrial ECVs. Current VC status summary (Top 5 accomplishments & issues) 1/3
5
The 25 th CEOS Plenary – Nov 8,9 Precipitation (PC) – Enhancement of PC Space Segment (e.g. progress in GPM implementation, M-T launch). – Implementation of improved TRMM algorithm (Version 7). – Improvements in inter-satellite calibration techniques through the X- Cal WG. – Data availability from Chinese (CMA) & Russian (ROSHYDROMET) microwave imagers. – Conical scan MW imagers availability in late-GPM phase and post-GPM phase (>2018). Ocean Color Radiometry (OCR) – IOCCG standing WG for evaluation of ECVs established, Chair selection underway – IOCCG Level-1 Requirements report target completion Dec 2011 – INSITU-OCR WG in progress, Chairs established – INSITU-OCR white paper outline by end of November 2011; Workshop February 2012 – iOCRT for 2013, IOCCG engagement of academic community at 2012 Current VC status summary (Top 5 accomplishments & issues) 2/3
6
The 25 th CEOS Plenary – Nov 8,9 Ocean Surface Topography (OST) – Continuity of Climate Record for Sea Level (Jason-1,2,3,CS) – Continuity of Complementary Coverage (Cryosat-2, ENVISAT, ERS-2, SARAL/AltiKA, Sentinel-3A, B) and their phasing in the constellation. – Data Policy– timely access to data from the Chinese HY-2A – Harmonized, Easily Accessible Altimeter Products (AVISO & RADS portals, Cryosat-2 Ocean Product) – Training and Workshop Ocean Surface Vector Wind (OSVW) – Continuity of Ku-band (QUIKSCAT, OSCAT/Oceansat-2, OSCAT follow- on). – Continuity of C-band (ASCAT/METOP, EPS-SG, ERS-2). – Integrating Ku-& C-band OVW products – Timely Data Access for Chinese (SOA) & Russian scatterometers – Training courses. Current VC status summary (Top 5 accomplishments & issues) 3/3
7
Additional Comments from VC leads are invited
8
The 25 th CEOS Plenary – Nov 8,9 SIT-25 in Tokyo (April, 2010) Discussed significance of the long term observation Plenary in Rio de Janeiro (October, 2010) Discussed CEOS Portals and GCI support February WS in Arlington (February, 2011) Discussed CEOS Metadata contribution to GCI Clearinghouse through IDN SIT-26 in Frascati (May, 2011) CEOS Portal Study progress report Agreed IDN support for GCI Discussed VC contribution to WG Climate Past discussions on VC
9
The 25 th CEOS Plenary – Nov 8,9 " CEOS Agencies encouraged to accumulate their datasets and information resources with the GEOSS Common Infrastructure, GCI." Data Meta-data GCI CEOS IDN VC Portal VC Data Portals in support of GCI C ommunity USERS Data Meta-data GEOSS USERS GEOSS USERS
10
The 25 th CEOS Plenary – Nov 8,9 Scientific requirement coordination by user community Implementation User Community (GEO CoP) CEOS Comprehensive Observation Requirement Integrated Observation Plan Request Data Coordination Model for Global Observation Study “Data Providing Plan and System” must be included
11
The 25 th CEOS Plenary – Nov 8,9 To participate in drafting of Integrated Observation Plan of CEOS Collaboration with WG Climate will be useful model for Carbon and Water To articulate data providing plan and system of each VC which need to be defined in the Integrated Observation Plan To develop and operate the data portal in accordance with the plan specified in Integrated Observation Plan The VC data system in GEOSS era needs to provide data through on line base VC roll in the Coordination Model
12
The 25 th CEOS Plenary – Nov 8,9 TRMM TMI Aqua AMSR-E Geostationally Meteorological Satellite NOAA AMSU DMSP SSM/I, SSMIS In-situ data On-line Data Access Example of data providing plan and system Water Data Portal Application Use (Global Rainfall Map) Application Use (Global Rainfall Map) Simulation output Application (Global Rainfall Map) Application (Global Rainfall Map) VC data
13
The 25 th CEOS Plenary – Nov 8,9 Summary Status of VCs are going well in general except issue of Chinese and Russian satellite data access. GCI support through IDN was coordinated and VCs are encouraged to promote the support. The Coordination Model is applicable not only for GCOS ECV case but also for Carbon, Water and so on. VCs roll in the Integrate Observation Plan is to articulate the VC data providing plan and system. Data Providing in GEOSS era exchanges data through online.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.