Download presentation
Presentation is loading. Please wait.
1
LLRF Requirement and Parameters at ESS Rihua Zeng, Anders J Johansson LLRF workshop, Hamburg, 2011-10- 20 1
2
2 Picture from C. Carlile’s presentation at IPAC 2011
3
3 5MW beam power 2.5 GeV protons (H+) 2.9 ms pulses 14 Hzrep rate 50 mApulse current 352.2 MHz 704.4 MHzRF frequency < 1 W/mbeam losses No accumulator/compressor ring ! Neutrons in 2019 ! Green field site Picture from G. Trahern’s presentation at ICALEPCS11
4
4
5
2011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson5 More than 200 LLRF stations to be built by 2019 for RFQ, DTL, spoke and elliptical cavities. (One klystron for one cavity.) Many issues to be addressed Stringent demands from ESS leads to tough challenges Pulse length: 2.86 ms Rep rate: 14 Hz Current: 50mA
6
An universal recipe for LLRF? 62011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
7
To do list 72011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
8
To learn list FLASHSNSJPARCFerm.CERNLBNLMYHHRA RF Stab0.01%0.5%1% IF freq.250KHz 54 MHz 50 MHz 12 MHz13 MHz20 MHz56 MHz 10 MHz Sample Freq. 1 MHZ 81 MHz 40 MHz 48 MHz54 MHz 56 MHz 80 MHz77.7 MHz 40 MHz Sampl.IQOtherIQOtherIQOtherIQ CrateVME/ATC A VXIcPCIVXIVMEUSBPXI Phase Distr.. Coax Opto 8 … 2011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
9
To be listed list 92011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
10
Issues: multiple cavities control 102011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
11
11 Picture from S. Peggs’s presentation at IPAC 2011
12
Klystron Linearization 12 Minimize power overhead. Is 20% enough? Issues: high effeciency 2011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
13
Issues: high availability Availability at ESS 95% Avoid failures that cause the whole system to fail Redundancy Automatically detect Fast recovery 132011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
14
Issues: others High intensity Long pulse High gradient Spoke cavity 142011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
15
Design guidelines Fault tolerant architecture and design – Redundancy or adaption? Easy maintenance – Generic design for all LLRF stations? – Modular design? – Auto-config and auto-calibration? Cost effective and long lived – Multiple vendors? – Software defined function by FPGA/DSP implementation for future upgrades? 152011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
16
Main architecture of ESS LLRF FPGA based solution Separate analog mixers for down- and up-conversion I/Q-demodulation and modulation One master oscillator for the whole ESS – Phase reference for RF – Time reference for control, science Global phase reference distribution Coaxial phase reference line EPICS control system 162011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
17
Interesting possibilities: Co-design with Beam Instrumentation – Simplify upkeep of installation – Minimize cost of units for installation and inventory Open Hardware solution – Multiple sources of hardware possible 172011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
18
What to do in the near future Simulation for more detailed parameters and requirement 182011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
19
Build the prototype 192011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson
20
More important, To ask more suggestions for the possible solutions at ESS Many thanks for your attention! 202011-10-20LLRF Workshop 2011, R. Zeng, A. J. Johansson